Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on May 19, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Initial Long Lead Parts Procurement for MH-60R AN/APS-153(V) Radar Data Processor (RDP) Weapons Replaceable Assembly (WRA) Tech Refresh Development Program

Closed
N00019-23-RFPREQ-APM299-0535Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336413
New
Federal
NIIN:LLW2AA020/P/N:279A146-1/NOM:ESM REC PROCESSOR
Solicitation # N0038327QF192
Solicitation N0038327QF192 is a sole source requirement issued by NAVSUP Weapon Systems Support Philadelphia for the repair of one ESM Receiver Processor, identified by NSN 9999LLW2AA020 and Part Number 279A146-1. The objective is to restore the government-owned article to operating condition, with the government intending to award the contract to Lockheed Martin due to a lack of sufficient data to contract with other sources. The initial induction period is 365 calendar days from the date of award, with a government option to extend for an additional 365 days. Contractors must provide pricing for the initial quantity and separate pricing for the second year if costs change. The period of performance is scheduled from October 16, 2026, to December 18, 2026, with a delivery schedule of 365 calendar days from the lead time event. The contract requires strict adherence to original manufacturer specifications and drawings for all inspection and testing. Packaging must meet best standard commercial practices for overseas shipment, specifically following MIL-STD-2073-1 for OCONUS shipments and ASTM D3951-18 for CONUS shipments, with specific requirements for electrostatic discharge protection and MIL-STD-129 marking. Inspection and acceptance will occur at the contractor's plant, coordinated through a Government Quality Assurance Representative. Offerors must be compliant with ISO 9001 quality standards and provide all necessary data from the NAVSUP WSS Source Approval Brochure to be considered for award. Payment and invoicing will be processed electronically via the Wide Area WorkFlow system.
Navsup Weapon Systems Support

POSTED

about 3 hours ago

DEADLINE

in 2 days
NAICS: 336413
New
Federal
REGULATOR,AIR PRESS
Solicitation # N0038325QD135
This fixed-price solicitation from Navsup Weapon Systems Support is for the repair, overhaul, upgrade, and testing of Air Pressure Regulators (NSN 1660-01-039-7911) to return them to a Ready For Issue condition. The contractor is responsible for providing all labor, materials, and tooling, as the government will not provide manufacturing aids. Key performance requirements include a Repair Turnaround Time of 183 days after asset receipt and an induction expiration date 365 days after the contract award. The scope includes strict adherence to quality standards such as ISO 9001/SAE AS9100 and ANSI/NCSL Z540 for calibration, with a specific prohibition on the use of MIL-W-81381 wire in favor of SAE-AS22759 series wire. The government intends to make a single award based on the most advantageous offer, weighing past performance as more important than price. Evaluation will utilize the Supplier Performance Risk System to assess item, price, and supplier risks. Packaging must comply with MIL-STD-2073 and MIL-STD-129, with specific requirements for DLR labeling and oxygen clean standards per MIL-STD-1330 where applicable. Administrative requirements include electronic invoicing via Wide Area Workflow and compliance with Buy American and Balance of Payments programs. Quotes must be submitted via email to the designated contracting officer by the specified deadline.
Navsup Weapon Systems Support

POSTED

about 3 hours ago

DEADLINE

in about 1 month

General Info

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing

Place of Performance

Farmingdale, NY, 11735, USA

Set-Aside

NONE

Documents

1

N00019-23-RFPREQ-APM299-0535 - MH-60R RDP Tech Refresh Long Lead Parts

DOCX, Low prioritypresolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Naval Air Systems Command
Contacts2 people available
OfficePATUXENT RIVER, MD, 20670-5000, USA
Office AddressPATUXENT RIVER, MD, 20670-5000, USA
Contacts
Pilantana Anderson
Lynn E. Fletcher

Full Description

Show more
The Naval Air Systems Command (NAVAIR) intends to award a Firm Fixed Price (FFP) Contract to Lockheed Martin Rotary and Mission Systems (LM RMS), Owego, New York, for the Initial Long Lead Parts Procurement for MH-60R AN/APS-153(V) Radar Data Processor (RDP) Weapons Replaceable Assembly (WRA) in support of the MH-60R aircraft in support of the United States Navy (USN). This contract includes system engineering and program management to support the procurement of the initial long lead parts required to execute the MH-60R AN/APS-153(V) RDP WRA Tech Refresh development. The projected deliveries will be through December 2024. This action is intended to be awarded on a sole source basis to Lockheed Martin Rotary and Mission Systems (LM RMS) under the authority permitting other than full and open competition, Title 10, U.S.C. 3204 (a)(1), as implemented by FAR 6.302-1, "Only One Responsible Source and No Other type of Supplies or Services Will Satisfy Agency Requirements." LM RMS is the sole designer, developer, systems integrator, and manufacturer of the MH-60R and MH-60S aircraft and weapon system and, as such, is the only source with the requisite knowledge and skilled personnel, facilities, manufacturing tooling, test equipment, experience, and technical data necessary to provide the required supplies and services. Note: This notice of intent is not a request for competitive proposals. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under authority of FAR 6.302. The Government does not intend to fund the development or qualification of other sources for fulfilling this requirement, as production for the supplies listed requires a substantial initial investment or an extended period of preparation for manufacture. However, the Government will consider all proposals received within thirty days after the publication of this synopsis. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Questions concerning subcontracting opportunities should be directed to Ms. Laura R. Rogers at (607) 751-3111. Contractor Name and Address: Lockheed Martin Rotary and Mission Systems, 1801 State Route 17 C, Owego, NY 13827.

More opportunities from Department Of Defense → Naval Air Systems Command

Same awarding agency

NAICS: 541330
New
Federal
PMA-290 Technical and Engineering Services
Solicitation # N0042125RFPREQAPM2900480-2
The Naval Air Warfare Center Aircraft Division and Naval Air Systems Command, supporting PMA-290, intend to award a sole source Single Award Indefinite Delivery Indefinite Quantity contract to Aviation Systems Engineering Company Inc. This effort, categorized under NAICS 541330, provides technical engineering and fleet deliverable capabilities for Maritime Patrol and Reconnaissance Aircraft and associated ground stations, specifically supporting the P-8A program. The scope includes systems engineering for new and modernized systems, software development and integration within a DEVSECOPS environment, cybersecurity, and the production of training materials. The contractor is also required to provide warehouse facilities for equipment storage and aircraft modification facilities near NAS Jacksonville, Florida. Performance is expected to begin in the third quarter of FY27, with work distributed across government sites in Patuxent River, Maryland; Seattle and Oak Harbor, Washington; Jacksonville, Florida; and Charleston, South Carolina, with approximately 20 percent of work performed at the contractor site. A critical requirement for this contract is adherence to the Navy Cybersecurity Workforce qualifications, with privileged access requiring specific IA certifications such as Security+ CE or SSCP. This notice is for informational purposes only and is not a formal request for proposal. Primary points of contact for this effort are Contracts Specialist Jacob Kerig and Procuring Contracting Officer Michele J. Estep.
Engineering Services

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 51321
New
Federal
FortiNet FortiGate Software License Renewals
Solicitation # N00019-26-RFPREQ-APM290-0806
The Naval Air Systems Command (NAVAIR) is soliciting proposals for a firm-fixed-price, indefinite-delivery contract to provide FortiNet FortiGate software license support and subscription renewals. This requirement supports communications security for the P-8A Poseidon aircraft, benefiting the United States Navy, the Royal Australian Air Force, and several Foreign Military Sales customers, including the United Kingdom, Norway, Republic of Korea, Canada, New Zealand, and Germany. The scope includes FortiGuard Antivirus and Intrusion Prevention System subscriptions for FortiGate SX and BX modules, as well as FortiCare technical support specifically for BX blades. Notably, SX modules are end-of-life and will only be covered through the base year ending January 31, 2028. This is a limited competition restricted to vendors listed on the Fortinet Federal Partners list. The contract structure consists of a base year and four option years, with a minimum quantity of 324 units and a maximum of 1,378 units. Award will be granted to the responsible offeror proposing the lowest total price. The procurement is set aside for Small Businesses, including HUBZone and Service-Disabled Veteran-Owned Small Businesses. Proposals must be submitted electronically via DoD Safe by October 21, 2026, at 4:00 PM. Invoicing and receiving reports are to be processed through the Wide Area WorkFlow (WAWF) system.

POSTED

1 day ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS