Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closed
20260813030State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and DIP sewer lines ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes during construction. General project requirements include clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Due to the project location and nature, contractors must provide railroad insurance. The bid schedule further accounts for extra depth excavation and the abandonment of existing pipes and manholes. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operating facility equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The project also requires associated site work, including exploratory drilling, rock excavation, and grading. The contract is governed by EJCDC standard general and supplementary conditions, with technical specifications spanning divisions 00 through 44. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to submission requirements. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10.9 percent for EPA MBE and 10 percent for the State of North Carolina. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with a 30-day payment term following the engineer's recommendation.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Metropolitan Water District of Southern California is soliciting bids for the Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1 project in Highland, California. The primary objective of this infrastructure project is to enhance water delivery flexibility during drought conditions by connecting the Inland Feeder and the Foothill Pump Station. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. Additional requirements include the installation of large-diameter valves, 54-inch and 145.5-inch tie-ins, four surge tanks, two valve vaults, an air compressor yard structure, and various electrical, instrumentation, and control upgrades. The estimated contract cost is between 25 and 30 million dollars. The contract will be awarded to the lowest responsible bidder who demonstrates technical experience with large diameter steel pipes or valves of at least 48 inches. Performance is subject to two critical shutdown windows: the first from February 1 to April 30, 2028, and the second from November 1 to December 13, 2028. Bidders must comply with a Project Labor Agreement, prevailing wage rates, and the Build America, Buy America Act. Required submissions include a California contractor license, performance and payment bonds equal to 100 percent of the bid, and various federal certifications. Payment will be administered exclusively through the Department of Treasury Automated Standard Application for Payments (ASAP) system.

General Info

MWD seeks bids for water pipeline and pump station intertie project in Highland, California.

Documents

8

00020 Notice Inviting Bids - Inland Feeder Foothill Pump Station Intertie Stage 1

PDF, High priority: read this firstnotice-inviting-bids
High

Geotechnical Report Inland Feeder – Foothill Pump Station Project Feb 2023

PDF, High priority: read this firstgeotechnical-report
High

Specifications Number 2049 Part 1 - Inland Feeder Foothill Pump Station Intertie

PDF, High priority: read this firstspecifications
High

Specifications Number 2049 Part 2 - Inland Feeder Foothill Pump Station Intertie

PDF, High priority: read this firstspecifications
High

Inland Feeder – Foothill Pump Station Intertie Project Initial Study/Mitigated Negative Declaration May 2024

PDF, Low priorityenvironmental-assessment
Low

Inland Feeder Foothill Pump Station Intertie Project Initial Study/Mitigated Negative Declaration May 2024

PDF, Low priorityenvironmental-document
Low

Instruction Manual for 54-Inch Butterfly Valve - Contract 2048

PDF, Low priorityinstruction-manual
Low

2049 DrawingsAndReferenceDrawings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Metropolitan Water District of Southern California
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #2049: The project involves furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe, and approximately 200 linear feet of 144-inch diameter steel pipe. It includes the installation of large-diameter Contractor-furnished valves, 54” and 145.5” diameter tie-ins, associated pipe fittings, four surge tanks, and two valve vaults. Additionally, the work covers an air compressor yard structure, drainage improvements, various electrical upgrades, instrumentation and controls, and piping systems. The project also requires the installation of Metropolitan-furnished 54” and 132” diameter valves, excavation of cobbles and large boulders, welding, disinfection, and surface restoration. The overall goal is to enhance water delivery flexibility in response to drought conditions by connecting the Inland Feeder and the SBVMWD Foothill Pump Station.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS