This Solicitation opportunity from Georgia was posted on September 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Inner Perimeter Road Water Lines

Closed
PE-66249-NONST-2027-000000119State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well and valve vault with associated appurtenances, as well as the demolition of existing pumps and piping. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the issuance of a Notice to Proceed. The contract is administered using EJCDC standard forms and will be awarded to the responsible bidder submitting the lowest responsive bid. Key requirements for bidders include the submission of bid security, evidence of authority to sign, and specific M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. Participation goals are set at 10.9 percent for MBE and 10.4 percent for WBE per EPA guidelines, with a combined state goal of 10 percent. The contractor must provide performance and payment bonds, maintain insurance from providers with an A.M. Best rating of A-VII or better, and adhere to OSHA fall protection and various technical standards, including AWS D1.2 for welding and NEMA MG1 for motors. Payment will be processed in equal monthly amounts via EJCDC C-620 applications, with a 200,000 dollar contingency allowance available for authorized additional work.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in about 17 hours
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia under solicitation ITB-2026141. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with adherence to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Requirements include a 5 percent bid guarantee, performance and payment bonds equal to 100 percent of the contract amount, and compliance with Davis-Bacon wage determinations and OSHA safety standards. Bidders must provide a minimum of three similar project references and confirm they are not on any government debarment lists.
WG Construction Co., Inc.

POSTED

about 8 hours ago

DEADLINE

in about 17 hours

AI Contract Overview

Show more

The City of Valdosta, Georgia, is soliciting bids for a unit price contract to install approximately 6.49 miles of water main along Inner Perimeter Road and South Patterson Street. The scope of work includes the installation of 24,693 linear feet of PVC water line via excavation, 7,400 linear feet of fusible PVC via directional bore, 2,162 linear feet of ductile iron water line, and 1,436 linear feet of steel casing via jack and bore. Additional requirements include the installation of 28 fire hydrants and 22 gate valves, as well as pavement removal and replacement, storm water monitoring, and soil erosion and sediment control. Bids must be submitted by 2:30 PM on October 22, 2026, to the Office of the City Engineer. To be considered responsive, submissions must include a signed and notarized non collusive affidavit, a Georgia Security and Immigration Compliance affidavit, and a bid bond or certified check for at least 5 percent of the bid amount. The project has a substantial completion timeline of 270 calendar days and a final completion timeline of 300 calendar days. Award will be granted to a responsible and responsive bidder, with payments issued monthly based on actual quantities of work measured against an approved schedule of values. Performance and payment bonds equal to 100 percent of the contract price are required for bids exceeding 25,000 dollars.

General Info

City of Valdosta seeks bids for 6.49 miles of water main installation by October 2026.

Documents

1
DOCX, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Valdosta
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Valdosta
Office AddressN/A

Full Description

Show more
The work consists of: Installation of approximately 6.49 miles of water main along Inner Perimeter Road and South Patterson Street including 24,693 linear feet of PVC water line ranging from 12¿ to 20¿ by excavation and 7,400 linear feet of Fusible PVC water line of similar size by directional bore, 2,162 of push-on or restrained joint ductile iron water line ranging from 12¿ to 20¿, and 1,436 linear feet of steel casing ranging from 24¿ to 36¿ by jack and bore, 28 fire hydrants complete, 22 resilient seated gate valves and valve boxes ranging from 8¿ to 20¿, pavement removal and replacement, soil erosion and sediment control best management practices, storm water monitoring, and appurtenances

More opportunities from Georgia → City of Valdosta

Same awarding agency

NAICS: 237990
SLED
Lakeland Avenue Drainage Improvements
Solicitation # 26-07-715
The City of Valdosta is soliciting bids for the Lakeland Avenue Drainage Improvements project, a unit price contract managed by the Engineering Department. The scope of work involves stormwater drainage improvements along approximately 2000 linear feet of Lakeland Avenue from Melrose Drive to Barack Obama Boulevard, including the installation of curb, gutter, storm pipes, and sidewalks. Additionally, the project requires the dredging of the One Mile Branch channel and the construction of two stormwater ponds: a 1.25-acre regional pond west of One Mile Branch and a 0.5-acre pond behind the Senior Center. Comprehensive site work includes asphalt and concrete demolition, root removal, milling, resurfacing, sanitary sewer installation, and the adjustment of manholes and valves. The contract period of performance is 300 calendar days, with all work adhering to GDOT 2021 Standard Specifications and City of Valdosta Land Development and Water and Sewer regulations. Key deliverables include a project schedule submitted to the City Engineer and monthly status meetings. Final acceptance by the City of Valdosta requires a signed and sealed certification letter and an as-built hydrology report verifying a net zero increase in stormwater. Bidders must provide a bid bond of at least five percent of the bid amount, and successful contractors must provide performance and payment bonds equal to 100 percent of the contract price unless the bid is $25,000 or less. Required submissions include a notarized Georgia Security and Immigration Compliance affidavit and a Registered Utility Contractors License Number.
Other Heavy and Civil Engineering Construction

POSTED

2 months ago

DEADLINE

in 22 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS