H--Inspect & Clean Water Tanks, Crater Lake N.P.
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The National Park Service is soliciting quotations for the inspection and cleaning of four potable water tanks located at Crater Lake National Park. The project involves cleaning tank walls and floors, removing sediment, and documenting equipment deterioration for one 150,000-gallon tank at park headquarters, two 100,000-gallon tanks at Mazama, and one 185,000-gallon tank at the Garfield Reservoir. The Garfield tank is a priority site and is accessible only via a hiking trail, requiring specific sediment removal methods such as using bags and motorized toters for transport. The anticipated period of performance is 45 days after award, with a preferred work window between September 28 and October 22, 2026. Contractors must provide written and digital reports and conduct water quality testing to ensure compliance with Oregon Department of Environmental Quality standards. This is a total small business set-aside under NAICS code 562998. Evaluation of quotations will be based on relevant experience in water tank services within the past three years, the proposed project schedule, and past performance. All dive team members must possess minimum commercial diver training meeting ANSI/ACDE 01-1993 standards. The government intends to award to the quoter most advantageous to the agency, considering both price and other factors. Required insurance includes a minimum of $500,000 for each person, occurrence, and property damage, along with mandatory workers' compensation. Quotes must be submitted via email to Phaedra Fuller by 4:00 PM PDT on September 17, 2026.
General Info
Contract Value
$23,650Place of Performance
Garfield Reservoir, Mazama, Headquarters, Crater Lake, CA, 97604, USASet-Aside
Awardee
MARINE INDUSTRIAL TANK INCAward Issued Date
Timeline
Organization & Contact Information
Full Description
The purpose of this Amendment no. 02 is to provide all interested parties additional Q &A as follows:
QUESTIONS AND ANSWERS:
(1) Is there a place on-site for discharge within 100'? If not, how far is the nearest discharge location? Is hauling required, etc.? Answer: No discharge within 100', nearest discharge is Mazama dump station about 7 miles from Garfield, 4 miles from Headquarters, about 1 mile from Mazama tank.
(2) Can a 24' trailer and a 4WD truck get within 50' of each tank? How far from the Garfield tank will parking be? Answer: Tight fit at Headquarters tanks and could be hard to turn around. Garfield is 0.7 miles from the parking area to the tank. Realizing that's a bit far to walk-haul equipment, the park will allow use of mechanical toters but there is a width restriction of 36" because any wider and they won't fit to go up/down the trail. Use of an ATV type motorized vehicle is not allowed as they're too wide for use on the tail. This is mentioned in solicitation Attachment 3, Statement of Work, Section 3.6 Vehicles/Heavy Equipment, Item J.
(3) Does each tank have at least a 24" hatch on top? Answer: Yes at least 24" hatch on each tank.
(4) What type of tanks are these? Concrete, Steel Welded, On-grade, Buried, etc.? Answer: Garfield is concrete half in ground half out, other tanks are above ground steel welded.
(5) Is the period of performance required or flexible? Answer: It's flexible. Crater Lake National Park hopes that a contractor could at least complete the work at Garfield tank location since it's trail-only access and is more complicated of a site, before the weather turns to the point of not being able to access the site. It's anticipated that the Garfield work could be completed before end of October 2026 (weather dependent). The total period of performance for the contract is September 28, 2026 through July 31, 2027 in the event a seasonal shutdown period has to be put into effect. The park does receive heavy snowfall in Fall and Winter months so it's iffy as to whether all of October 2026 will be free of snow enough to accomplish the work at Garfield site, or all the sites The solicitation asks quoters to include their anticipated project schedule as part of their quote submittal (see instructions for what to include in quote and evaluation factors in Attachment 1).
Solicitation response date has not changed. Quotes are due by 4pm PDT on Wednesday, September 16, 2026, emailed to contact@example.gov.
The Government reserves the right to cancel this solicitation.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Interior → Pwr Pore Mabo (84000)
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
