Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 14, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Inspector of Record Services

Closed
RFQ-23-24-01-0-2023/ALState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 6 hours ago

DEADLINE

in 16 days
NAICS: 541330
New
SLED
CITY OF ALAMO FY27 CDBG SEWERAGE
Solicitation # PE-66394-NONST-2027-000000011
The City of Alamo is soliciting statements of qualifications and proposals from engineering firms licensed in the State of Georgia to provide professional services for the improvement of the city's sewerage system. The scope of work involves providing preliminary design services for a potential FY27 Community Development Block Grant (CDBG) project, with the requirement that a draft Preliminary Engineering Report be submitted by January 15, 2027. If funding is secured, the selected firm will also be responsible for the subsequent design and construction management services. Proposals are due by November 30, 2026, and must include the firm's history, CDBG/EIP/RDF experience, key personnel qualifications, current workload, proposed scope of service, references, and associated fees or percentages. Evaluation of respondents is based on a point system assessing the firm's ability to provide necessary disciplines, experience with similar projects, quality of references, and price competitiveness. Additionally, firms must confirm they possess Errors and Omissions insurance and can meet the PER deadline. All contracts are subject to the provisions of the Georgia Department of Community Affairs and must comply with various federal and state laws regarding HUD Assisted Projects, including the Build America, Buy America Act, the Americans with Disabilities Act, and the Civil Rights Act of 1964. The primary point of contact for this solicitation is Bethany Newby.
City of Alamo

POSTED

about 7 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Oro Grande School District is seeking qualified firms and individuals to serve as Inspectors of Record for its current and future bond construction projects. The selected inspector will be responsible for providing continuous, competent inspection of construction activities to ensure compliance with approved plans, specifications, and applicable laws, including Education Code sections and Title 24 of the California Code of Regulations. Their duties encompass monitoring all phases of construction, maintaining detailed records, preparing semi-monthly reports, and coordinating with the Architect, Structural Engineer, and the District’s project team. The inspector must also notify the Division of the State Architect (DSA) of key project milestones, such as work start, foundation completion, and significant concrete pours, and keep detailed records of construction procedures, deviations, and materials used. The inspector’s role is limited to observation and reporting; they do not have authority to approve deviations, issue directions on construction techniques, or enter contractor’s operational areas without authorization. They are tasked with maintaining a thorough job file, supervising testing procedures, ensuring materials meet specifications, and assisting in project closeout documentation. The contract emphasizes the importance of impartiality, adherence to all legal and contractual requirements, and effective communication with all project stakeholders. The solicitation was posted on July 14, 2023, with a deadline for responses on July 28, 2023, and the contract falls under NAICS code 541330, focusing on professional engineering services.

General Info

Agency

California → Oro Grande School District

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Oro Grande School District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Oro Grande School District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Oro Grande School District is seeking Statements of Qualifications (“SOQs”) from qualified firms and individuals to act as Inspectors of Record (IORs) for the District’s current and future Bond construction projects. The duties of the INSPECTOR shall include the duties of the inspector set forth in Education Code sections 17309 et seq., and Title 24 of the California Code of Regulations, and future amendments thereto, including the duties set forth below.
1. General. INSPECTOR shall provide competent, adequate, and continuous inspection during construction or alteration satisfactory to the Project Manager, Architect and DSA. INSPECTOR shall act under the direction of the Architect, or Structural Engineer if applicable, as the Board of Education of DISTRICT may direct. While performing the services contemplated by this Agreement, INSPECTOR agrees to comply with all applicable laws and regulations.
2. Continuous Inspection Services. In fulfilling Inspector’s responsibilities, INSPECTOR shall represent DISTRICT as the inspector on the Project job site. INSPECTOR shall have personal knowledge, obtained by his personal and continuous inspection of the work of construction at all stages of its progress, that the requirements of the approved plans and specifications are being completely executed. Continuous inspection means complete inspection of every part of the work to ensure a workmanlike job is constructed in conformity with the contract documents, all applicable requirements of the DSA and all applicable federal and state laws and local ordinances. Work such as concrete work or brick work which can be inspected only as it is placed will require the constant presence of INSPECTOR. Other types of work which can be completely inspected after the work is installed may be carried on while INSPECTOR is not present. In any case, INSPECTOR must personally inspect every part of the work. In no event shall INSPECTOR have or assume any duties which will prevent INSPECTOR from continuous inspection of the work of construction in all stages of its progress at the site where INSPECTOR is responsible for inspection.
3. Personal Knowledge. INSPECTOR may obtain personal knowledge of the work of construction, either on site or off site, performed under the inspection of a special inspector or inspector, if any (Section 4-333 of Title 24), from the reporting of others on testing or inspection of materials and workmanship for compliance with the plans, specifications and applicable standards. The exercise of reasonable diligence to obtain the facts shall be required.
4. Relations With an Architect Or Engineer. INSPECTOR shall work under the general direction of the Architect or Structural Engineer. All inconsistencies or seeming errors in the plans and specifications shall be reported promptly to the Architect or Structural Engineer for interpretation and instructions. In no case, however, shall the instruction for the Architect or Structural Engineer be construed to cause work to be done which is not in conformity with the approved plans, specifications and change orders.
5. Job File. INSPECTOR shall keep a file of approved plans and specifications (including all approved addenda or change orders) on the job at all times, and shall immediately return any unapproved documents to the Architect or Structural Engineer for proper action. INSPECTOR shall have and maintain on the job at all times all codes and documents referred to in the plans and specifications.
6. Semimonthly Reports. INSPECTOR shall keep the Architect or Structural Engineer thoroughly informed as to the progress of the work by making semi monthly reports in writing as required by Section 4-337 of Title 24, signed by the INSPECTOR. A copy of each such report shall be sent to the DISTRICT's Director of Facilities, or designee, and to DSA. Failure to comply with Section 4-337 is cause for DSA to withdraw approval of INSPECTOR.
7. Notifications to Division of the State Architect. INSPECTOR shall notify the DSA (1) when work is started on the Project or restarted if previously suspended, (2) at least 48 hours in advance of the time when foundation trenches will be complete, ready for footing forms, (3) at least 48 hours in advance of the first pour of foundation concrete and 24 hours in advance of any subsequent and significant concrete pour, and (4) when all work is suspended for a period of more than two weeks.
8. Construction Procedure Records. INSPECTOR shall keep a record of certain phases of construction procedure including but not limited to the following: (1) the time and date of placing concrete and the time and date of removal of forms in each portion of the structure; (2) identification marks of welders, lists of defective welds, manner of correction of defects, and other matters regarding welding operations; (3) penetration under the last ten (10) blows for each pile when piles are driven for foundations. All such records of construction procedure shall be kept on the job until completion of the work, and shall be made a part of the permanent school records.
9. Deviations. INSPECTOR shall notify the contractor, in writing, of any deviations from the approved plans and specifications which are not immediately corrected by the contractor when brought to contractor’s attention. Copies of such notices shall be forwarded immediately to the District and Architect or Structural Engineer, and to the DSA. INSPECTOR shall safeguard the interest of the District in the construction of the project. Failure on the part of INSPECTOR to notify the contractor of the deviations from the approved plans and specifications shall in no way relieve the contractor of any responsibility to complete the work covered by contractor’s contract in accordance with the approved plans and specifications and all laws and regulations.
10. Verified Reports. From time to time, as the work of construction or alteration progresses, INSPECTOR shall prepare and submit to the DSA verified reports, signed by the Architect or Structural Engineer and INSPECTOR, upon forms prescribed by the DSA, based upon INSPECTOR'S personal knowledge (as defined in Education Code section 17309 that the work during the period covered by the report has been performed and materials have been used and installed, in every material respect, in compliance with the approved plans and specifications, setting forth such detailed statements of fact as are required by the DSA in accordance with Section 4-336 of Title 24. INSPECTOR shall also prepare and deliver to the DSA detailed statements of fact regarding materials, operations and other matters related to the work of construction when requested.
11. No Authority To Contract. INSPECTOR shall have no authority to contract on behalf of DISTRICT.
12. If not already set forth herein, INSPECTOR must: 12.1 Be familiar with the plans, specifications, change orders, and the contractor’s operations during all phases of the project. 12.2 Observe, check and measure items used in the project for compliance with the plans, specifications, change orders, and technical instructions from the Architect. 12.3 Maintain a daily report/log describing the general work performed by the contractor, noting problems, rejections of materials or work and unusual events. The report/log shall be filled daily, tersely and factually. The report/log shall reflect the contractor’s activities each day. This and all other reports shall be timely and properly completed. All reports and records created or maintained by INSPECTOR shall be uploaded to the District’s construction management program, e-Builder, and shall be District’s sole property. 12.4 Supervise on-site testing and ensure that all required tests are performed by a competent testing laboratory, contractor or engineer as specified in the Contract Documents. Check and report to the Project Manager and the Architect laboratory tests indicating defective materials or other problems. Check billings from testing laboratories to see that billings reflect only tests actually requested and performed. Maintain a daily log of inspection by testing lab. 12.5 Make sure that the required record drawings are accurately marked up as required. f. Report to the Project Manager and the Architect verbally and in writing: (1) poor performance by the contractor; (2) acts prejudicial to the District’s interest; and, (3) work performed or materials used which are not in conformance with the Contract Documents. 12.6 Assist the Project Manager and the Architect in the final inspection and project acceptance phase. 12.7 Upon request, provide the District with a written report regarding the contractor's performance on the Project. 12.8 Maintain an effective working relationship with the contractor, District personnel and Architect. 12.9 Be tactful, firm and fair in insisting that contractors adhere to the Contract Documents. 12.10 Attempt to foresee methods or materials which will not be acceptable and immediately bring these facts to the contractor’s attention in order to avoid removal of work already in place. 12.11 Attempt to anticipate the contractor’s problems and review with the Project Manager anticipated schedules and work involved prior to the commencement of a new trade on the job. 12.12 Attempt to foresee the need for all required tests and inspections. 12.13 When notified by the contractor, arrange for all tests and inspections which are required by the Contract Documents, arrange for prompt notification of the Architect of the results of the tests and inspections, and record Architect’s approval or rejection. 12.14 Refuse to allow any related work to be installed until shop drawings have received final approval from the Architect. 12.15 Ensure that Architect’s verbal instructions during field inspections are written in the Daily Report/Log for that day or in the Field Instruction Sheet. 12.16 Be responsible for slump tests and for taking concrete test cylinders for each concrete pour and marking them for identification. Inspector shall make arrangements for transportation and storage of test materials. 12.17 Receive samples which are required to be furnished at the job site; record date received and from whom; notify Architect of their readiness for examination, record Architect’s approval or rejection; and maintain custody of approved samples. 12.18 Inspect all materials immediately upon their delivery to the site to ensure that they comply with the Contract Documents and are in a good and acceptable condition. Exert extreme care to ensure that no communications to the contractor or contractor’s agents are misinterpreted as changes in the scope of the work. 12.19 Assist in the completion and submission of DSA close out documents as required by DSA.
13. Restrictions on the Inspector’s Authority. In the performance of the duties required by this Agreement, the INSPECTOR exercises limited authority. The INSPECTOR shall not: a. Authorize deviations from the Contract Documents; b. Avoid conducting any required tests; c. Enter the area of responsibility of the contractor’s field superintendent; d. Expedite the job for the contractor; e. Advise on, or issue directions relative to, any aspect of the building technique or sequence unless a specific technique or sequence is called for in the specifications; f. Approve shop drawings or samples; g. Authorize or advise the District to occupy the project, in the whole or in part, prior to final acceptance of the project; h. Interfere in contractor/subcontractor relationships.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS