Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FA670325R0003 Diversity Fiber Connecting ITB 700 to Hangar 5/ Bldg. 404 at Dobbins ARB, GA

Closed
FA670325R0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The project scope includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire length, and the placement of various steel and ductile iron poles. The engineer's estimate for the work is $1,900,000. Bids will be awarded based on the lowest and best bid, with a strong emphasis on the bidder's financial standing, performance experience, and ability to complete the work in the shortest time possible. Bidders must provide a bid bond of 10% of the total bid amount, and the successful contractor will be required to post a combined performance-payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the National Electric Safety Code, and the Americans with Disabilities Act is mandatory. Contract administration is managed through the Office of the Architect-Engineer, with payments processed monthly. Equipment payments are structured at 90% upon delivery F.O.B. to the City of Piqua and the remaining 10% upon satisfactory energizing and acceptance of the system. All deliveries must be coordinated 48 hours in advance, and shipments in enclosed trailers will be refused. Bids must be submitted in duplicate via Bid Express, email, or sealed hard copy by the specified deadline.
City of Piqua

POSTED

about 17 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
This firm-fixed price non-personnel services contract, solicitation number W91QVN26QXXXX, provides communication tower and facility maintenance for the 41st Signal Battalion C4I mission support in South Korea. The scope of work includes physical and visual inspections of metal surfaces for structural integrity, maintenance of bonding, grounding, and lightning protection systems, LED replacement for beacon and side marker lights, and interior and exterior repairs for C4I communication shelters. Performance is required across multiple sites, including Papyongsan, Yongsan TCF, Osan Bucket, Highpoint, and CP Walker AFN FM. The base period of performance is 12 months from the date of award, with funding provided by the Republic of Korea Ministry of National Defense (ROK MND). Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price that is technically acceptable. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and compliance with the Performance Work Statement. All price proposals must be submitted in Korean Won. The contractor must provide key personnel, including an Information and Communication Engineer and a CQCSM/Safety Manager with specific education and experience requirements. Mandatory qualifications include an Information and Communication Construction License and an Electrical Construction License. The contractor is also required to adhere to strict security protocols, including AT/OPSEC compliance for foreign performance and the safeguarding of Controlled Unclassified Information.
0411 Aq Hq Contract Augmented

POSTED

about 22 hours ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
Refurbishment Of Existing On Load Tap Changer At Adobe Creek Substation - AC21
Solicitation # RFQ199445
The City of Palo Alto Utilities Department is soliciting quotes under RFQ199445 for the refurbishment of an existing on-load tap changer (OLTC) at the Adobe Creek Electric Substation (AC-21). The project specifically requires the replacement of the TLH-21 LTC on an Allis Chalmers 15MVA transformer with a certified re-manufactured component. The scope of work includes draining and processing transformer oil, filling the LTC tank with 760 gallons of new oil, re-sealing the barrier board and pass-through studs, and replacing valves and gaskets on six radiators along with the 60KV SMD fuse holder. Comprehensive preliminary and post-work testing, including Power Factor, TTR, and DGA/oil quality testing, is mandatory. The City has standardized its requirements for the Allis Chalmers TLH-21 and will not accept alternate materials or equivalent products. Eligible bidders must hold a valid California Class A license and be registered with the DIR. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. As a public works project, it is subject to California prevailing wage laws and requires the contractor to provide performance and payment surety bonds totaling at least 100 percent of the contract value. Additionally, contractors must meet strict insurance requirements, including general liability and worker's compensation, and comply with the City's Environmental Purchasing Policy. Bids must be submitted electronically via the OpenGov portal by November 3, 2026.
Utilities

POSTED

1 day ago

DEADLINE

in 15 days

AI Contract Overview

Show more

This contract involves the installation, testing, and commissioning of two 12-strand Single Mode Fiber Optic Cables connecting the Information Transfer Building (ITB) 700 to Hangar 5 and Building 404 at Dobbins Air Reserve Base in Georgia. The project is fully set aside for small businesses and requires the contractor to supply all necessary equipment, tools, materials, and labor, adhering to current telecommunications installation standards, specifically the TIA standards. All materials must be new and unused, and the work must be performed on-site by the contractor’s own personnel, with at least 15 percent of the work performed directly by the contractor as per FAR regulations. The contract is anticipated to be firm-fixed-price with a period of performance of one year, and the total project value is estimated between $500,000 and $1,000,000. The solicitation, which will be issued as a Request for Proposal (RFP), is scheduled to be available around April 17, 2025, with proposals due by May 22, 2025. Interested contractors must be registered in the System for Award Management (SAM) to be eligible for award, and foreign participation is not permitted. The project falls under NAICS code 237130, with a small business size standard of $45 million. The primary points of contact are W. Derrick Deeds and Mr. Ken Jacob, both reachable via email and phone, with all correspondence directed to the 94th Contracting Squadron at Dobbins ARB.

General Info

Small businesses sought for fiber optic cable installation at Dobbins ARB, proposal due July 8, 2025.

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

64 INDUSTRIAL DR DOBBINS AFB, GA 30069-4210 UNITED STATES, GA, 30069

Set-Aside

SBA

Documents

2

Amendment 0002 to Solicitation FA670325R0003

PDF, High priority: read this firstamendment
High

FA670325R0003 Questions and Answers

PDF, High priority: read this firstq-and-a
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Jun 24, 2025 to Jul 8, 2025.

Deadline changed

Response deadline time changed from 7:00 PM UTC to 6:00 PM UTC on Jul 8, 2025.

Notice updated

Response deadline time changed from 6:00 PM UTC to 7:00 PM UTC on Jul 8, 2025. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA6703 94TH Contracting Flight Pk
Contacts2 people available
OfficeDOBBINS AFB, GA, 30069-4900, USA
Office AddressDOBBINS AFB, GA, 30069-4900, USA

Full Description

Show more
Diversity Fiber Connecting ITB 700 to Hangar 5 / Bldg. 404 Dobbins Air Reserve Base has a requirement to Furnish, Install and Test (EFI and T) two 12-strand Single Mode (SM) Fiber Optic Cables (FOC) from Information Transfer Building (ITB) 700 to Hangar 5 and Bldg 404 at Dobbins ARB, GA. This requirement is 100 % set-aside for Small Business. Set-aside is in accordance with FAR 19.502-2.Work consists of but is not limited to provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet this requirement. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.Attachment 1 SOO is Restricted and will be available at SAM.GOV by request. To be granted access to this Solicitation, Offeror must have completed the National Institute of Standards and Technology (NIST) assessment and uploaded it to Supplier Performance Risk System (SPRS). Your entity NIST assessments must be documented in SPRS an must be current (date of assessment must not be older than 3 years). See the Defense Federal Acquisition Regulation System (DFARS), section 252.204-7019 and 252.204-7020. Posted Attach 11 Questions and Answers 26 Jun 2025. Admendment 3 made 7 July 2025 with minor changes to Attachment 5 Sec L pg 2 with the changes as follows.From : Each proposal shall include two (2) volumes containing all of the required information in Table Proposal Organization and Content and Page Limitations.The electronic copy shall not belinked to any other document. Any proposal with sound/video files embedded will not be evaluated.To: Each proposal shall include two (2) volumes containing all of the required information Content and Page Limitations as applicable. The electronic copy shall notbe linked to any other document. Any proposal with sound/video files embedded will not be evaluated

More opportunities from Department Of Defense → FA6703 94TH Contracting Flight Pk

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS