Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 9, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Install Uninterruptible Power Supply (UPS) System, MCA PN62783, SATCOM Complex/NEC, Fort Buckner and Torii Station, Okinawa

Closed
W912HV-23-Z-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 12 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Buckner, Okinawa, JPN

Set-Aside

NONE

Documents

1

W912HV-23-Z-0004_Market+Survey+Questions+2022-12-09.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Nov 8, 2022 to Dec 14, 2022. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Japan
Contacts2 people available
OfficeAPO, AP, 96338-5010, USA
Office AddressAPO, AP, 96338-5010, USA

Full Description

Show more
**Updated 09 December 2022** Project Description The U.S. Army Corps of Engineers, Japan Engineering District (JED), Okinawa Area Office (OAO) hereby provides the notice of intent to modify contract W912HV-14-C-0007 titled - MCA PN62783, SATCOM Complex/NEC, Fort Buckner and Torii Station, Okinawa, Japan (SATCOM), awarded to Prime Projects International Japan (PPIJ), to include the supply and installation of an Uninterruptible Power Supply (UPS) system. JED intends to sole source this requirement through modification of the current SATCOM contract with PPIJ as duplication of cost to the Government is not expected to be recovered and we anticipate unacceptable delays will result if open competition is pursued. The UPS system is vital to the continuous operation of sensitive equipment within the SATCOM facility and critical to the mission of the requiring agency. The UPS system must be incorporated into the overall design of the building electrical system to ensure proper functioning and minimize the risk of any damage to the SATCOM systems relying on it. The required UPS system is considered Installed Building Equipment and is integrated as a part of the facility electrical power distribution system necessitating commissioning after installation. As such, the UPS design must match the static transfer switch and electrical distribution system designed and installed by the construction contractor. After consideration of a full and open procurement, the delays created by the estimated six-month acquisition period, the required timeframe for a new contractor to become familiar with the electrical system and project requirements, and long lead times of approximately one-year to order an UPS system create unacceptable delays in this project. PPIJ already possesses conclusive knowledge of the electrical system and can meet the requirement for the UPS without the duplicative costs and detrimental delays to the requiring agency. Given the above, firms interested and capable of performing this work with any objections are highly encouraged to submit a response explaining their ability to work within an active construction site to coordinate the requirements, supply, and install the UPS system within the designated 400-calendar day period of performance. Submission Requirements for responses to this Market Survey: Interested sources are requested to complete the attached Market Survey attached. Though you may have already completed this with the original source sought, we have updated the questionnaire with specific questions based on new information received in the Sole Source action. We appreciate any comments you might have. Once you have completed the form, kindly email to the following individuals no later than 2:00 P.M. on 16 December 2022 Japan Standard Time. We appreciate your honest feedback on this matter. H. Christine Allen: heather.c.allen.civ@usace.army.mil Norman G. Mackie: norman.g.mackie.civ@usace.army.mil Jack T. Letscher: jack.t.letscher.civ@usace.army.mil *Updated on 06 December 2022* The U.S. Army Corps of Engineers Japan Engineering District hereby provides the notice of intent to meet the requirements detailed below through a sole source modification to contract W912HV-14-C-0007 titled - MCA PN62783, SATCOM Complex/NEC, Fort Buckner and Torii Station, Okinawa, Japan with Prime Projects International Japan. Submission Requirements for responses to notice: Firms interested and capable of performing this work with any objections are highly encouraged to submit a response. Interested sources are requested to complete, or provides updates if previously submitted, the attached Market Survey detailing company capabilities and the ability to meet a 400-calendar day period of performance given the requirements. Once completed, kindly email the completed form to the following individuals no later than 4:00 P.M. on 14 December 2022 Japan Standard Time. We appreciate your honest feedback on this matter. H. Christine Allen: heather.c.allen.civ@usace.army.mil Norman G. Mackie: norman.g.mackie.civ@usace.army.mil Jack T. Letscher: jack.t.letscher.civ@usace.army.mil General Acquisition Information Organization Symbol/Organization. United States Army Corps of Engineers (USACE), Japan District (POJ), Okinawa Area Office (OAO) Construction Type. Design-Build (DB) Construction Project Title: Install Uninterruptible Power Supply (UPS) System, MCA PN62783, SATCOM Complex/NEC, Fort Buckner and Torii Station, Okinawa Project Location: Fort Buckner, Okinawa, Japan Product Service Code (PSC): Y1JZ Construction of Miscellaneous Buildings NAICS Code. 236220 - Commercial and Institutional Building Construction Dates of Current Market Research: 06 December 2022 - 14 December 2022. Project Magnitude: Between $1,000,000 and $5,000,000 (FAR 36.204) Anticipated Period of Performance: 400 Calendar Days ____________________________________________________________________________ Original Notice. W912HV-23-Z-0004 Sources Sought Market Survey Install Uninterruptible Power Supply (UPS) System, MCA PN62783, SATCOM Complex/NEC, Fort Buckner and Torii Station, Okinawa General Acquisition Information Organization Symbol/Organization. United States Army Corps of Engineers (USACE), Japan District (POJ), Okinawa Area Office (OAO) Construction Type. Design-Build (DB) Construction Project Title: Install Uninterruptible Power Supply (UPS) System, MCA PN62783, SATCOM Complex/NEC, Fort Buckner and Torii Station, Okinawa Project Location: Fort Buckner, Okinawa, Japan Product Service Code (PSC): Y1JZ Construction of Miscellaneous Buildings NAICS Code. 236220 - Commercial and Institutional Building Construction Dates of Market Research. Market Research issued 24 October 2022 through 08 November 2022. Project Magnitude: Between $1,000,000 and $5,000,000 (FAR 36.204) Projected Advertisement: 2nd Quarter FY23 (Jan to Mar 2023) Anticipated Period of Performance: 400 Calendar Days Project Description The U.S. Army Corps of Engineers, Japan Engineering District (JED), Okinawa Area Office (OAO) is performing market research for a Design-Build (DB) construction effort titled - Install UPS System, MCA PN62783, SATCOM Complex/NEC, Fort Buckner and Torii Station, Okinawa. This announcement represents a market survey that is intended for preliminary planning purposes only. The purpose of this notice is to identify sources capable of performing this project and to receive responses from those firms to assist the Government's acquisition planning. This survey does not constitute a commitment by the Government for any follow-on announcements, solicitation, or award. This is NOT a solicitation. The Government will not pay for any information provided as a result of this market survey. This market survey is intended for local sources only. Local sources are those sources physically located and licensed to conduct business in Japan. Firms interested and capable of performing this work are highly encouraged to submit a response (submission requirements are located within this notice). Information about the project: This purpose of this project is for the supply and installation of one Uninterruptible Power Supply (UPS) system to support the SATCOM facility currently under construction on Fort Buckner, Okinawa, Japan. This facility is owned and operated by the U.S. Army Network Enterprise Technology Command (NETCOM). The UPS provides emergency power to the SATCOM facility when the main power fails and protects critical components from power spikes or surges. The SATCOM facility is required to operate at peak efficiency 24 hours per day and 7 days per week with no down time. Project Description: The site is currently undergoing a phased construction of the SATCOM facility with another Prime Contractor on-site. This project would require the awardee to conduct work in an active 10-year ongoing construction project owned by another company. The selected firm would need to coordinate with the construction contractor building the facility on the design and installation of the UPS system. This is a large communications and computer network facility with four large satellite radomes requiring UPS support. Estimated power requirement is 600-700 kVA. The Contractor selected for this project is required to plan and incorporate the UPS system into the overall design of the building electrical system to ensure the continued operation of sensitive and critical communication equipment operating within. The UPS design must be compatible with the static transfer switch (STS), electrical distribution system, and floorplan designed by the on-site construction Contractor. The UPS system shall be complete and useable by the estimated completion date of the facility, July 2024. Proposed Procurement Method: The U.S. Army Corps of Engineers (USACE), Japan District anticipates the release of a Request for Proposal (RFP) with source selection and award to the Lowest Price Technical Acceptable offeror. System for Award Management (SAM): In order to be eligible for award of Government contracts, contractors shall be registered in the SAM Database. https://www.sam.gov ===================================================================== Submission Requirements for responses to this Market Survey: Interested sources are requested to complete the attached Market Survey and email the completed form to the following individuals no later than 4:00 P.M. on 08 November 2022 Japan Standard Time. We appreciate your honest feedback in helping to develop an effective acquisition strategy that is advantageous for all interested parties. H. Christine Allen: heather.c.allen.civ@usace.army.mil Norman G. Mackie: norman.g.mackie.civ@usace.army.mil Jack T. Letscher: jack.t.letscher.civ@usace.army.mil The information provided will be used within the USACE to facilitate decision making and will not be disclosed outside the agency. However, respondents submitting business information pursuant to this sources sought announcement should consult 41 C.F.R. part 105-60 and other implementing regulations concerning the release of such information to third parties under the Freedom of Information Act (FOIA). All information submitted by respondents that they consider confidential and not releasable to third parties outside of the U.S. Army Corps of Engineers and its employees, agents, consultants, and representatives, must be clearly and conspicuously marked. Questions: Questions regarding this Sources Sought Announcement may be directed to: Contracting Officer- Norman G. Mackie: norman.g.mackie.civ@usace.army.mil Contract Specialist - Jack T. Letscher: jack.t.letscher.civ@usace.army.mil Additional Information: Contracting Office Address: U.S. Army Corps of Engineers, Japan District Okinawa Area Office Unit 35132 APO, AP 96374-5132

More opportunities from Department Of Defense → W2SN Endist Japan

Same awarding agency

NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
Oil and Gas Pipeline and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 3 months
View Details
NAICS: 811310
New
Federal
Combined Synopsis/Solicitation Notice: Maintenance of Commissary Refrigeration Systems and Repair of Refrigeration, Heating, Ventilation, and Air Conditioning Systems (HVAC) at Hario and Sasebo, Japan
Solicitation # W912HV26QA013
Solicitation W912HV26QA013 is a combined synopsis and request for quote for a firm-fixed-price contract to provide maintenance and repair services for commissary refrigeration systems, including Refrigeration Monitoring and Control Systems (RMCS), and heating, ventilation, and air conditioning (HVAC) systems. The work will be performed at the Hario Commissary (Building 5127), Sasebo Commissary (Building 1436), and Sasebo Storage Facility (Building 306) in Japan. The contract includes a base period from December 1, 2026, through November 30, 2027, with the option for four additional extension years. The contractor is required to provide monthly preventive maintenance and maintain 24/7 emergency service availability, with a two-hour response time and a 24-hour repair completion window. Replacement parts under 500,000 JPY are included in the base price, while those exceeding this amount are handled via reimbursable CLINs with a not-to-exceed limit of 3,000,000 JPY per period. Award will be based on the most advantageous quotation, evaluated in order of past performance (Acceptable/Unacceptable), technical capability (Good/Acceptable/Unacceptable), and price fairness and reasonableness. Quotations must be submitted electronically via the PIEE Solicitation Module by October 28, 2026. Required submissions include a technical narrative addressing emergency response and supply chain capabilities, financial documentation such as Standard Form 1407 and corporate tax returns, and at least three past performance questionnaires or CPARS evaluations. This acquisition is not set aside for small business concerns and requires compliance with OSHA and USACE safety standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
Federal
P530 Aircraft Intermediate Maintenance Facility, Kadena Air Base, Okinawa, Japan
Solicitation # W912HV27Z0007
The U.S. Army Corps of Engineers, Japan District, is conducting market research via a sources sought notice for the P530 Aircraft Intermediate Maintenance Facility project at Kadena Air Base in Okinawa, Japan. The primary objective is to assess industry capabilities and the availability of interior finish products, specifically evaluating whether brand-name specifications or equivalent Japanese domestic and international products meet the functional, aesthetic, and performance requirements of the multistory maintenance facility. This effort is intended to inform the upcoming solicitation W912HV27BA005 and ensure that specifications do not unnecessarily restrict competition or cause disproportionate cost increases. Participation is limited to local sources licensed and qualified to perform construction work in Japan under the Japanese Construction Business Act. Interested parties are requested to provide feedback on product availability, lead times, and potential equivalents that comply with Japanese Industrial Standards. Responses must be submitted to the designated contracting personnel by 2:00 p.m. Japan Standard Time on October 30, 2026. This notice is for planning purposes only and does not constitute a formal solicitation or an obligation by the government to award a contract.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
Federal
Vehicle Maintenance Shop, Kadena Air Base, Okinawa, Japan
Solicitation # W912HV27RA001
Solicitation W912HV27RA001 is a request for proposals for a firm-fixed-price construction contract to build a new Vehicle Maintenance Shop complex at Kadena Air Base, Okinawa, Japan, to support the 1-1 Air Defense Artillery Battalion. The project scope includes the construction of a Tactical Equipment Maintenance Facility, a Supply and Support Activity warehouse and storage shed, and a combined Petroleum Oil Lubricant and Hazardous Materials storage building. The work involves substantial earthworks, including cut and fill balancing and the construction of retaining walls up to 7 meters high, as well as the demolition of eight existing buildings. Facilities will be constructed using reinforced concrete or steel to withstand the local environment, with a total performance period of 1260 calendar days from the notice to proceed. Award will be determined using a best-value tradeoff approach where price is approximately equal to the combined weight of non-price factors. The most critical non-price factor is Construction Project Management, specifically focusing on the geotechnical approach and construction sequencing, followed by Past Performance. Proposals must be submitted electronically via PIEE in four distinct volumes: Construction Project Management, Past Performance, Price, and Solicitation/Award documents. Key requirements include the use of Primavera P6 scheduling software for compatibility with USACE systems, compliance with USACE EM 385-1-1 safety standards, and the provision of performance and payment bonds from approved sureties.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 4 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS