Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on May 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Installation & Maintenance of Potable Water Filtration Systems

Closed
RFP 2026011State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 6 hours ago

DEADLINE

in about 19 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 6 hours ago

DEADLINE

in about 19 hours

AI Contract Overview

Show more

The Florida Department of Environmental Protection issued Solicitation No. 2026011 for the Installation and Maintenance of Potable Water Filtration Systems, aiming to engage contractors to provide safe drinking water filtration services to well owners affected by contamination in Florida. The original solicitation, released on January 26, 2026, outlined a five-year contract term with the possibility of five additional one-year renewals. The scope of work includes installation and ongoing maintenance of these filtration systems, with compensation structured via fixed unit rates and cost reimbursements. Vendors were required to submit detailed proposals in response to the RFP, complete with pricing schedules, and comply with submission deadlines and evaluation criteria outlined by the Department. However, the Department has formally withdrawn the solicitation and announced its decision to enter into direct negotiations pursuant to Section 287.057(6) of the Florida Statutes, meaning this is not a call for bids or proposals and interested parties should refrain from submitting responses. This withdrawal supersedes prior deadlines and the RFP process as previously published. The contract administration, including terms, conditions, and performance expectations, had been comprehensively defined in the draft contract and associated documents, but the Department's move toward negotiations signals a shift from the competitive solicitation route. Potential protest rights and legal recourses related to this decision are governed by specified Florida statutes with strict timelines for filing and bond requirements. The primary contact for this matter is Wanda Norton at the Department of Environmental Protection.

General Info

Florida DEP withdrew RFP 2026011, shifting to direct negotiations for water filtration system services.

Documents

7

Addendum No. 1 - Q&A and Modifications for DEP Solicitation 2026011

PDF, High priority: read this firstamendment
High

Addendum No. 1 - Revised RFP 2026011 Installation & Maintenance of Potable Water Filtration Systems

PDF, High priority: read this firstamendment
High

Amended Agency Decision No. 1 - Withdrawal of Solicitation 2026011

PDF, High priority: read this firstamendment
High

Draft Contract for RFP 2026011 - Florida DEP

PDF, High priority: read this first46 pages · contract-document
High

RFP 2026011 Form D Rate Schedule

XLS, High priority: read this first9 pages · rate-schedule
High

RFP 2026011 Installation & Maintenance of Potable Water Filtration Systems

PDF, High priority: read this first115 pages · rfp
High

Solicitation 2026011 Tabulation of Results for Water Filtration Systems

PDF, High priority: read this firsttabulation-of-results
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Mar 10, 2026 to Mar 3, 2026. The notice description changed.

Notice updated

Response deadline changed from Mar 3, 2026 to Apr 13, 2026. The notice description changed.

Notice updated

Response deadline changed from Apr 13, 2026 to May 21, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Department of Environmental Protection
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Notice of Withdrawal with Intent to Negotiate:THIS IS NOT A SOLICITATION FOR BIDS OR PROPOSALS; IT IS A POSTING OF AN AGENCY DECISION. PLEASE DO NOT SUBMIT A RESPONSE OR A NO RESPONSE REPLY.The Department hereby withdraws Solicitation No. 2026011 (the “Solicitation) Installation & Maintenance of Potable Water Filtration Systems, issued on January 26, 2026, and hereby provides Notice of its decision to negotiate pursuant to section 287.057(6), Florida Statutes.Please see the attached document for additional information. Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post a bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.

More opportunities from Florida → Department of Environmental Protection

Same awarding agency

NAICS: 238160
New
SLED
Addendum 1 BDC10-26/27 Dr. Von D. Mizell-Eula Johnson State Park – Education Center Roof Replacement
Solicitation # BDC10-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the roof replacement of the Education Center at Dr. Von D. Mizell-Eula Johnson State Park in Dania Beach, Florida. The scope of work requires the contractor to provide all labor, materials, equipment, supervision, and permitting necessary to complete the project. Key requirements include adherence to local, federal, and state code compliance, maintenance of manufacturer warranties, and construction in accordance with green building standards per Executive Order 07-126 and Section 255.252(3), F.S. Bidders must include the cost of Builders Risk insurance in their bid price and utilize the U.S. Department of Homeland Security’s E-Verify system for all employees and subcontractors. Bids are due by 3:30 pm ET on October 28, 2026, and must be submitted to Contracts Specialist Logan Lee-Marple. To avoid rejection, submissions must include a signed copy of Addendum No. 1, which clarifies that bidders are responsible for providing all materials necessary to meet code and warranty requirements, specifically regarding hard foam board, valley strips, and fire barriers. Additionally, bidders must provide a biennial pre-qualification letter from the FDEP Bureau of Design and Construction or, if not pre-qualified, a current State Contractor license certification and Corporate Charter registration. The agency also encourages diversity in all sub-contracting opportunities.
Roofing Contractors

POSTED

4 days ago

DEADLINE

in about 15 hours
View Details
NAICS: 237990
SLED
ITB: BDC07-26/27 - Long Key State Park – Long Key Beach Nourishment and Campground Rebuild
Solicitation # BDC07-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the Long Key State Park Beach Nourishment and Campground Rebuild project, solicitation number BDC07-26/27. The scope of work requires the contractor to provide all labor, materials, equipment, supervision, and permitting necessary for the campground modification project at Long Key State Park in Long Key, Florida. All work must be designed and constructed in accordance with applicable green building standards pursuant to Executive Order 07-126 and Section 255.252(3), F.S. Bids must be submitted no later than 3:30 pm ET on Thursday, November 12, 2026, to Alisha Sadler at the Bureau of Design and Construction in Tallahassee. Bidder prequalification is mandatory; applicants must provide a biennial pre-qualification letter from the FDEP or, if not pre-qualified, submit a current State Contractor license certification and Corporate Charter registration. Additionally, the selected contractor must utilize the U.S. Department of Homeland Security’s E-Verify system for all employees and subcontractors. The Department encourages the use of diverse subcontractors to reflect the citizenship of Florida and ensures ADA accessibility for all bid-related activities.
Other Heavy and Civil Engineering Construction

POSTED

19 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS