This Solicitation opportunity from New Jersey was posted on February 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract seeks bids for both routine and emergency maintenance of an existing 20 mil temporary cover system, as well as installation of approximately 2 acres of new temporary cover at the ACUA Hanemann Environmental Park in Egg Harbor Township, New Jersey. The scope of work includes furnishing and installing a new 20 mil geosynthetic cover, seaming cover panels, deploying rope ballast lines, sandbag and anchor installation, constructing liner anchor trenches along landfill slopes, and fitting 20 mil liner boots around existing gas and leachate collection penetrations. All activities must adhere strictly to provided plans and specifications to ensure environmental protection and operational integrity of the landfill cap system.
The solicitation, numbered 2026-ITB-03, was posted on February 3, 2026, with a submission deadline of March 5, 2026. The responsible agency is the Engineering office of New Jersey’s Atlantic County Utilities Authority, located in Egg Harbor Township. Primary contact for the contract is Yan Liu, Senior Engineer, with secondary contact Oren Thomas, Procurement and Contracts Manager. The procurement process mandates compliance with state requirements for bid bonds and surety submissions, including electronic submission protocols and original documentation when electronic verification is unavailable. Contract award will require adherence to New Jersey Prevailing Wage laws, proper performance and payment bonds, insurance, warranties, and other standard contractual terms outlined in the ACUA specimen contract agreement. Overall, this contract ensures the environmental safety and operational maintenance of the landfill temporary cover system through qualified, compliant contractors.
General Info
Maintenance and installation of 20 mil temporary landfill cover at ACUA Hanemann Park, NJ.
PDF, High priority: read this first2 pages · contract-document
HighAI Summary for Atlantic County Utilities Authority Contract Agreement: This contract agreement between Atlantic County Utilities Authority (ACUA) and the Contractor outlines the terms for furnishing, delivering, and installing goods and services as per the specifications, proposal, and bidding documents. It includes provisions for performance security, insurance, warranties, compliance with the New Jersey Prevailing Wage Act, record maintenance, payment terms, and authority of signatories. The agreement is effective until delivery and acceptance or one year, subject to fund availability and renewal options. It ensures ACUA's rights in case of breach and mandates compliance with applicable laws and conditions.
PDF
PDF, High priority: read this first78 pages · specifications
HighAI Summary for Atlantic County Utilities Authority Temporary Landfill Cap Technical Specifications: This document contains the technical specifications for the installation, maintenance, and repair of the temporary landfill cap at the Atlantic County Utilities Authority Landfill in Egg Harbor Township, New Jersey. It includes detailed sections on general requirements, site work, quality control, contractor responsibilities, and health and safety. The work covers routine and emergency maintenance and repair of the existing geosynthetic capping system, as well as the installation of approximately 2 acres of new temporary cap. The document outlines contractor obligations, mobilization timelines, and coordination with regulatory agencies such as NJDEP and EPA. It also specifies submittal requirements and site access protocols. The version date is not explicitly stated but the content is comprehensive and intended for contractor use to ensure compliance and quality in landfill cap construction and maintenance.
PDF
PDF, High priority: read this first10 pages · wage-determination
HighAI Summary for Attachment 2 Davis Bacon Wage Rate Requirements FY 2013: Attachment 2 outlines the wage rate requirements under The Consolidated and Further Continuing Appropriations Act, 2013 (P.I. 113-6) specifically for the Clean Water and Safe Drinking Water State Revolving Funds. It details the applicability of Davis-Bacon prevailing wage requirements to construction projects funded by these programs, guidance on obtaining and incorporating wage determinations from the Department of Labor, and contract provisions to ensure compliance. The document provides instructions for subrecipients, both governmental and private entities, on maintaining payroll records and monitoring wage determinations. It includes procedures for contract and subcontract clauses, wage payment schedules, and handling modifications to wage determinations. This document is essential for ensuring compliance with federal labor standards in EPA-funded construction projects under the FY 2013 Continuing Resolution.
PDF
PDF, High priority: read this first36 pages · itb
HighAI Summary for Bid 2026-ITB-03 Installation, Maintenance & Repair of Temporary Landfill Cap: This Invitation to Bid (ITB) document, Bid Number 2026-ITB-03, issued by the Atlantic County Utilities Authority on February 5, 2026, solicits bids for the installation, maintenance, and repair of a temporary landfill cap at the ACUA Hanemann Environmental Park in Egg Harbor Township, NJ. The scope includes routine and emergency maintenance of an existing 20 mil temporary cover system and installation of approximately 2 acres of new cover. The document provides detailed bid proposal instructions, technical specifications, and unit pricing for materials and labor. Bids are due by March 5, 2026, with a non-mandatory pre-proposal meeting held on February 9, 2026. The ITB includes requirements for bid security, compliance with New Jersey anti-discrimination laws, and submission procedures via ACUA's e-Procurement Portal.
PDF
PDF, High priority: read this first2 pages · q-and-a
HighAI Summary for Bidder FAQ on Electronic Bid Bonds and Consent of Surety: This document is a FAQ from the Atlantic County Utilities Authority (ACUA) explaining the requirements for submitting bid security electronically in compliance with New Jersey statutes. It details the mandatory upload of PDF copies of Bid Bonds and Consent of Surety with online bids, the conditions under which scanned paper bonds are acceptable, and the use of electronic verification systems like Surety2000. It also covers the necessity of delivering original hard copies if electronic verification is not available, consequences of non-compliance including bid rejection, and ACUA's right to request originals even after electronic submission. The document emphasizes the strict legal requirements for bid security to ensure enforceability and binding validity.
PDF
PDF, High priority: read this first3 pages · modification
HighAI Summary for Contract Modification Proposal and Acceptance Form: This document is a Contract Modification Proposal and Acceptance Form used to propose changes to an existing contract. It includes sections for issuing office, project and contract numbers, description of the change, cost adjustments, and contract time modifications. The form requires detailed cost breakdowns and signatures from the contractor, owner, and engineer. It also documents the necessity for the change, impacts, and negotiation summaries. The form is essential for formalizing contract amendments and ensuring all parties agree to the modifications.
PDF
PDF, High priority: read this first101 pages · general-conditions
HighAI Summary for General Conditions of Construction Contract - Atlantic County Utilities Authority: This document titled 'General Conditions of the Construction Contract' prepared by the Atlantic County Utilities Authority outlines the contractual terms and conditions for construction projects. It includes a detailed table of contents and index covering contract time, definitions, preliminary matters, contract documents, bonds and insurance, contractor responsibilities, changes in work and contract price, payments, disputes, prevailing wage rates, and other essential provisions. The document serves as a comprehensive guide for managing construction contracts, specifying roles, responsibilities, procedures, and legal requirements to ensure proper execution and compliance. The version is indicated as revised December 2024.
PDF
PDF, High priority: read this first20 pages · special-notice
HighAI Summary for Implementation of American Iron and Steel Provisions of P.L. 113-76: This memorandum from the EPA outlines the implementation of the American Iron and Steel (AIS) provisions of P.L. 113-76, Consolidated Appropriations Act, 2014. It details the requirement that Clean Water and Drinking Water State Revolving Fund assistance recipients use U.S.-produced iron and steel products for relevant projects funded from January 17, 2014, through the end of Fiscal Year 2014. The document explains project coverage, product definitions, waiver conditions, and exemptions, including projects with engineering plans approved before the enactment date. It provides a Q&A format for guidance on compliance and waiver requests, emphasizing EPA's management and oversight role.
PDF
PDF, High priority: read this first4 pages · instructions
HighAI Summary for Instructions for Completing Forms in DocuSign - Ocean County Bid Submission: This document provides detailed instructions for completing and submitting bid documents via DocuSign for Ocean County solicitations. It outlines steps to access, complete, sign, and upload mandatory forms including the Signature Page, Non-Collusion Certification, Affirmative Action Questionnaire, Statement of Ownership, and Disclosure of Investment Activities in Iran. The instructions emphasize the importance of matching the email used in DocuSign with the vendor account email and completing all required fields to avoid proposal rejection. The document also highlights the County's preferred submission method as DocuSign and includes guidance on downloading, printing, and loading completed documents into the OpenGov system. The version referenced is updated as of March 1, 2022, with completion examples dated April 7, 2022.
PDF
PDF, High priority: read this first8 pages · wage-determination
HighAI Summary for Labor Standards Provisions for Federal and Federally Assisted Contracts - 29 CFR Part 5: This document, last revised on 01/02/2018, details labor standards provisions applicable to federally financed and assisted construction contracts under Title 29, Labor, Chapter I, Part 5 of the Code of Federal Regulations. It includes mandatory contract clauses for contracts exceeding $2,000 related to construction, alteration, or repair of public buildings or works financed wholly or partly by federal funds. Key provisions cover minimum wage requirements, classification of laborers and mechanics, fringe benefits, payroll deductions, and withholding payments to ensure compliance with the Davis-Bacon Act and related labor laws. The document mandates posting wage determinations and Davis-Bacon posters at work sites and outlines procedures for approving additional labor classifications and wage rates.
PDF
PDF, High priority: read this first5 pages · payment-and-performance-bond
HighAI Summary for Payment and Performance Bond - Atlantic County Utilities Authority: This document is the Payment and Performance Bond required by Atlantic County Utilities Authority under P.L. 1996, c. 81. It is a statutory form to be executed after contract award, binding the Principal and Surety to ensure faithful performance and payment of claims related to the contract. The bond includes conditions, obligations, and stipulations protecting the Obligee and beneficiaries. It also contains a Surety Disclosure Statement and Certification detailing surety capital, surplus, underwriting limitations, and reinsurance information. The document requires authorized signatures and attachments such as Power of Attorney and Surety Disclosure Statement. The bond ensures financial security for contract completion and lawful claims payment.
PDF
PDF, High priority: read this first6 pages · reporting-form
HighAI Summary for SED Participation Building Phase Quarterly Reporting Form: This document is the SED Participation Building Phase Quarterly Reporting Form (OEO-002) issued by the New Jersey Department of Environmental Protection's Office of Equal Opportunity and Public Contract Assistance. It provides instructions and a form for quarterly reporting on the utilization of Socially and Economically Disadvantaged Businesses (SEDs) including MBEs and WBEs during the building phase of projects financed through New Jersey environmental infrastructure programs. The form requires detailed information about project sponsors, contractors, contract numbers, project descriptions, SED participation goals, subcontract awards, and signatures. It is intended for contracting agencies and contractors to submit quarterly reports within 15 days after each fiscal quarter to ensure compliance with SED utilization requirements under New Jersey regulations.
PDF
PDF, Low priority3 pages · contract-document
LowAI Summary for Environmental Maintenance Bond Document: This document is an Environmental Maintenance Bond in accordance with N.J.A.C. 7.22-10.11 (p). It binds the Principal and Surety to the Owner for $25,000 or 50% of the price bid for materials fulfilling environmental specifications. The bond ensures faithful performance of the contract, indemnifies the Owner against damages or costs arising from the work, and obligates the Surety to complete the work if the Principal fails. The bond remains effective for one year after final acceptance of the work. It includes provisions for modifications, waivers, and assignments without impairing the Surety's obligations. The document requires signatures and seals from the Principal and Surety, with instructions for execution depending on the Contractor's legal status.
PDF
PDF, Low priority2 pages · bond
LowAI Summary for General Maintenance Bond Sample Form: This document is a sample General Maintenance Bond form outlining the obligations of the Principal and Surety to the Obligee. It guarantees remedy of defects from materials, workmanship, or contract non-compliance for one year after final acceptance. The bond includes execution instructions, requirements for individual and corporate principals, and notes on premium rates and attachments such as Power of Attorney and Financial Statement. The bond is dated and signed by involved parties under seal.
PDF
PDF, Low priority1 page · other
LowAI Summary for Landfill Temp Cover Installation Site Plan and Details 2026: The document titled 'Landfill Temp Cover Installation Site Plan and Details 2026' appears to be a site plan or technical drawing related to landfill temporary cover installation. The content provided is largely unreadable or corrupted, consisting mostly of repeated characters and placeholders without meaningful text or specifications. Due to the lack of clear information, the document cannot be classified as a solicitation, amendment, award, or specification. No critical procurement details or instructions are discernible.
PDF
PDF, Low priority9 pages · regulation
LowAI Summary for NJAC 7:22 Subchapter 9 - Awarding Contracts to Socially and Economically Disadvantaged Small Businesses: This document is Subchapter 9 of NJAC 7:22, establishing procedures for awarding contracts for state-assisted environmental infrastructure projects to small business concerns owned and controlled by socially and economically disadvantaged individuals (SED). It outlines the scope, purpose, and definitions related to the SED program, including contract types, project sponsors, and compliance requirements. The subchapter aims to implement policies ensuring at least 10% of contracts are awarded to SED businesses, detailing standards for contracting agencies and project sponsors under state financial assistance programs. The document provides definitions for key terms such as 'contract,' 'contractor,' 'project sponsor,' and 'set-aside contract,' among others.
LowAI Summary for SED Participation Monthly Progress Report OEO-003: This document is the SED Participation Monthly Progress Report (OEO-003) used by the New Jersey Department of Environmental Protection's Office of Equal Opportunity and Public Contract Assistance. It is designed to monitor the utilization progress of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SED) in the Environmental Infrastructure Financing Program. The report requires contractors to provide updates on solicitation, bidding, negotiation, and subcontract awards involving SEDs for the reporting month. It includes sections for contractor and project details, and requires signatures from the contractor and project compliance officer.
PDF
PDF, Low priority1 page · other
LowAI Summary for State Treasurer's List of Debarred, Suspended, & Disqualified Bidders: This document provides information about the current list of firms and individuals debarred under the New Jersey Prevailing Wage Act from participating in Public Works Contracts in New Jersey. It directs readers to an online resource for the most up-to-date list of debarred, suspended, and disqualified bidders.
Bids are solicited for routine and emergency maintenance of the existing 20 mil temporary cover system on an as -needed basis and installation of approximately 2 acres of new temporary cover at the ACUA Hanemann Environmental Park in Egg Harbor Township, NJ. The new temporary cover installation includes but is not limited to the following tasks: furnishing and installation of new 20 mil geosynthetic cover, cover panel seaming, rope ballast line, sandbag, and anchor installation, liner anchor trench construction along the top and side slope of the landfill, and installation of 20 mil liner boots around existing gas and leachate collection penetrations. All work to be performed according to the plans and specifications.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.