Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on January 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Installation of drywall to ceilings to include priming and painting in the Lake House on North Bass Island.

Closed
SRC0000027614State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
International
Supply, Delivery and Maintenance of Electric Lift Trucks (Forklitfts)
Solicitation # tender_22286
The Ministry of the Solicitor General for the Government of Ontario is seeking a provider for the supply, delivery, and maintenance of three fully electric forklifts: one stand-up reach truck and one sit-down forklift for the Central East Correctional Center, and one sit-down forklift for the Central North Correctional Center. The equipment must be capable of indoor and outdoor operation, featuring a triplex mast, a minimum load capacity of 3,500 pounds, a minimum lift height of 17 feet, 42-inch forks, and both side shift and tilt capabilities. The scope of work extends beyond delivery to include warranty coverage, preventative maintenance, repair services, and technical support to minimize downtime and ensure health and safety compliance. The procurement process follows a four-stage evaluation: a mandatory requirements review, a pass/fail technical data sheet assessment, a scored technical response, and a commercial evaluation based on a relative pricing formula. Bidders must provide a nine-digit CRA business number and certify their business continuity plans, customer satisfaction survey practices, and environmental sustainability initiatives. Delivery is prioritized for the 2026-27 fiscal year, with options ranging from four weeks to a final deadline of March 29, 2027. Successful contractors must adhere to strict occupational health and safety standards, including OHSA compliance, WSIB coverage, and the provision of an accessible emergency evacuation plan.
Solicitor General

POSTED

1 day ago

DEADLINE

in 30 days
NAICS: 333924
New
Federal
Truck Tractors (6X4)
Solicitation # W91QVN27RA006
Solicitation W91QVN27RA006 is a firm fixed price, unrestricted contract for the procurement and delivery of 15 brand new 6x4 truck tractors to support the 19th Expeditionary Sustainment Command theater-wide operations. The vehicles must feature a diesel, in-line 6-cylinder engine with approximately 12.7-liter displacement and a 12-speed automated manual transmission. Delivery is scheduled for calendar year 2027, with a performance window from January 1 to December 31, 2027, and must be completed within 240 calendar days of the award or notice to proceed. The delivery is FOB Destination, door-to-door to Camp Humphreys, and requires coordination with the point of contact three working days in advance. This contract is uniquely funded by the Government of the Republic of Korea (ROK), which will pay the contractor directly; no United States appropriated funds are obligated. Invoices must be submitted in five copies and clearly cite MOA Contract - funded by ROK MND. Award will be based on the most advantageous offer, with technical qualifications and price weighted approximately equally. Technical evaluations are pass/fail based on compliance with salient characteristics, while price is reviewed for reasonableness and completeness. Offerors must submit quotations electronically via the PIEE Solicitation Module by November 12, 2026, including a plan to obtain a manufacturer's certificate specifying USFK as the first owner and required Korean contractor certifications.
0411 Aq Hq Contract Augmented

POSTED

1 day ago

DEADLINE

in 16 days
NAICS: 333924
New
Federal
3930--Combined Warehouse Forklift With 26' Lift Height
Solicitation # 36C25927Q0031
The Department of Veterans Affairs, Network Contracting Office 19, has issued a Sources Sought Notice for the procurement of a new sit-down rider lift truck and battery for the Oklahoma City VAHCS Warehouse. The primary objective is to acquire equipment capable of reaching a minimum lift height of 26 feet to accommodate higher racking systems in a new warehouse facility. The requirement specifies a Crown Forklift model FC5715-40 or an equal alternative, featuring a minimum load capacity of 4,000 lbs, 36-volt power, and a Vforce VTA battery compatible with the existing Crown Vforce V-HMF3 Series charging station. Additional technical requirements include 36-inch forks, adjustable outriggers, dual AC drives, side shift and forward back tilt capabilities, and integrated brake, backup, and front-mounted work lights. This request is for information and planning purposes and does not constitute a formal solicitation. Interested contractors must submit a capabilities statement and a detailed product description, including the manufacturer's information and estimated delivery time, to Peyton Wilkerson by 15:00 MST on November 9, 2026. Submissions are limited to 8 pages and should be sent via email. The government has identified NAICS code 333924 as the primary classification for this effort, with a small business size standard of 900 employees, though respondents may suggest alternative codes that better represent the scope of work.
Network Contract Office 19 (36C259)

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 333924
New
DIBBS
SKID, PLATFORM
Solicitation # SPE8EF-27-T-0127
Solicitation SPE8EF-27-T-0127 is a fixed-price request for quotations issued by DLA Troop Support Construction and Equipment Manu and Con for the procurement of 138 platform skids, identified by NSN 3990-01-653-4153 and part number 03159940011. The solicitation was posted on October 26, 2026, with a response deadline of November 5, 2026. This is not a small business set-aside, and all quotes must be submitted through the DLA Internet Bid Board System. The required delivery date is February 27, 2027, with a need ship date of April 12, 2027, delivered FOB Destination to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contractor must provide a complete data package for approved and alternate parts for evaluation. Technical and quality requirements are governed by the DLA Master List, specifically RP001 for packaging and palletization, RA001 for general technical requirements, and RQ011 for the removal of government identification from non-accepted supplies. Packaging must adhere to ASTM D3951 and MIL-STD-129 for marking and labeling. Invoicing and receiving reports must be processed electronically via the Wide Area WorkFlow system. The contract incorporates various FAR and DFARS clauses, including requirements for combating trafficking in persons, sustainable products, and safeguarding covered defense information.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

2 days ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The Ohio Department of Natural Resources is undertaking a project to enhance the interiors of the Lake House on North Bass Island by installing drywall ceilings, aligning with its commitment to improving state parks. The contractor engaged for this project will oversee on-site work, manage logistics to and from the island, and handle the comprehensive process of hanging, mudding, taping, sanding, and texturing 5/8" sheetrock. A significant requirement is using airtight drywall techniques with specified adhesives, along with the responsible removal and reinstallation of existing ceiling elements such as light fixtures and smoke detectors. The contractor must ensure all work areas are primed and painted as approved post-award, with appropriate measures taken to protect the flooring. They must also handle the removal and proper disposal of all work-related waste, as no use of the owner’s trash trailer is allowed, and provide all equipment necessary for drying processes, excluding propane or kerosene heaters. A 12-month warranty is included post-completion. The entire project, located at North Bass Island State Park Lake House, is set to be completed by May 23, 2025. Prospective bidders are encouraged to visit the site for accurate measurements, with prior scheduling. The project will be awarded to the lowest qualifying bidder, provided they meet the outlined criteria and successful pre-award evaluation.

General Info

Ohio Department of Natural Resources contracts drywall installation at Lake House, North Bass Island, by May 2025.

Documents

5

Addendum to Bid Quote Base Template Non-Federal Funds Rev. 2024-09-13

PDF, High priority: read this first5 pages · amendment
High

ODNR Services Agreement Non-Federal Funds Base Template Rev. 2023-04-11

PDF, High priority: read this firstcontract-document
High

RFQ Installation of Drywall to Ceilings in Lake House on North Bass Island

PDF, High priority: read this firstrfq
High

State of Ohio Standard Terms and Conditions 04-10-23

PDF, High priority: read this first15 pages · standard-terms-and-conditions
High

Affirmation and Disclosure Form Rev. 3/22

PDF, Low priority2 pages · affirmation-and-disclosure-form
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → DNR353511 North Bass Island State Park DNROTT
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
 Needed Service: Installation of drywall to ceilings in the Lake House on North Bass Island.Ordering Location and Address: North Bass Island State Park Lake House Meiers Rd, Isle Saint George OH 43436 Project Background PROJECT LOCATION – TRANSPORTATION TO ISLAND IS BIDDERS RESPONSABILITY BY PRIVATE/CHARTERED BOAT/ AIRCRAFT NO DAILY FERRY SERVICE AVAILABLEVISITATION TO THE SITE The areas to be drywalled are below. The contractor shall field measure carefully and check both areas for other conditions to ensure proper fit in all areas designated. No request for installation extras will be considered due to measurement or take-off errors by the installation contractor. When visiting the site contractors shall make an appointment with the Maintenance Director, Ross Muszynski, +1 (555) 000-0000 between the hours of 8:30am to 3:00pm.Specifications/Scope of Work Material and labor supplied by Contractor:  On-site supervision while work is occurring. Mobilization to and from island / jobsite. Hang, mud/tape/sand, and texture each unit. 5/8” sheetrock on the ceilings. Utilize/install airtight drywall techniques as specified by Owner, primarily installation of air sealing adhesive between framing and drywall. Contractor will provide this specific adhesive: Dow Great Stuff Pro 26.5oz Wall and Floor Gun Foam, and the applicator gun. Remove and salvage any ceiling light fixtures / fans / smoke detectors / trim / crown molding and reinstall after new drywall is installed. All areas of work should include one coat of approved drywall Primer and two coats of approved paint. (Owner will approve colors after award) Floors papered and taped before mudding/taping begins. Floors scraped and cleaned during final clean-up of drywall phase, including garage floor. Trash to be hauled away by Contractor, Owner’s trash trailer is not available. Excess drywall/material cleaned up and removed from site, recycled/disposal at facility approved by Owner. Trash to be hauled away by Contractor, Owner’s trash trailer is not available. All equipment and fuel to heat/dry mud, unless otherwise agreed upon with Owner. Propane/kerosene heaters are not permitted on the jobsite. Contractor will provide a 12-month workmanship warranty that will be dated once punch walk is completed.
CLEAN UP After completion, the installation contractor shall remove all scraps, packaging, and rubbish caused by their work. Photos:Bedroom 1 approximately 185 sq ftKitchen foyer approximately 100 sq ftDoor area approximately 50 sq ftCompletion Date: May 23, 2025Site Visit & Point of Contact Prior to submitting a bid response, offerors are encouraged to visit the park. Contact the Maintenance Director, Ross Muszynski, +1 (555) 000-0000 between the hours of 8:30am to 3:00pm.Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.Project Award For bids involving service projects on DNR property, the lowest apparent bidder will be required to provide 2 examples of similar completed projects including photos. Provide the person’s name, organization name, phone number and email address for each project example. In addition, the bidder must complete a pre-award meeting with appropriate DNR staff to ensure that the materials and scope are mutually understood. Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.For the purchase of services: The awarded supplier will be required to sign an Addendum to Bid Quote or Personal Services Agreement. Example attached.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS