Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Installation of Electric Forklift Chargers by San Diego Unified Port District at B Street Cruise Ship Terminal

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Jacob BakerManagement Analyst

Full Description

Show more
The proposed project would involve the procurement and use of electric forklifts and installation of electrical chargers for the electric forklifts by the San Diego Unified Port District (District) at the B Street Cruise Ship Terminal (see Exhibit 1) in the city of San Diego, California. Work to specifically complete the proposed project would involve: • Procurement of approximately two (2) electric forklifts for use within the B Street Cruise Ship Terminal; • Installation of approximately two (2) chargers for electric forklifts within the existing warehouse Section C (southwest corner of the warehouse) to be connected to existing electrical infrastructure. Dimensions of chargers are approximately 18” x 12” x 4”; • Ongoing inspections, maintenance, repairs, and replacement of chargers and electric forklifts as-needed. Construction of the proposed project is anticipated to occur in approximately late-2026 and would take approximately one (1) day to complete with ongoing modifications and maintenance as needed. Equipment required for project completion would consist of hand tools, work trucks and associated equipment. During construction, there would be no closures required for the sidewalk, promenade, street or parking lot adjacent to the proposed project location. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the District would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

More opportunities from California → San Diego Unified Port District

Same awarding agency

NAICS: 238210
New
SLED
Electrical Retrofit Of Bayfront Parking Structure
Solicitation # 2025-22
The San Diego Unified Port District is soliciting bids for the electrical retrofit of the Bayfront Parking Structure located at 1 Park Blvd., San Diego, California. This single prime contract involves the demolition and removal of existing non-LED lighting and the installation of new LED lighting fixtures and light poles. The project is structured into a Base Bid covering the first floor, seventh floor, and all stairwells, with five additive bid schedules for the second through sixth floors. To ensure the facility remains operational, the contractor must execute the work in phases, maintaining at least 80 percent of the building floor available for public access at all times. The contract will be awarded to the lowest responsive and responsible bidder who meets eligibility requirements and provides a statement of experience detailing at least two similar projects involving electrical equipment testing and commissioning. Bidders must submit electronic proposals by 2:00 P.M. on December 1, 2026, including bid security and longhand signatures. Requirements include adherence to prevailing wage laws, equal employment opportunity clauses, and the provision of faithful performance and labor and materialmen's bonds. Technical specifications require compliance with NETA ATS 2025 standards for electrical power equipment testing and the use of an independent testing agency. All materials must be stored in original manufacturer packaging and labeled according to UL 514A and UL 514C standards. The contractor is responsible for maintaining ADA parking continuity and emergency vehicle access throughout the project. Final payment is based on the percentage of work completed, and the District may withhold up to 150 percent of the value of any incomplete or corrective work identified during the final inspection and punch list process.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 6 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS