Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on January 7, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

INSTALLATION OF ELECTRICAL CIRCUITS

Closed
70Z04520QPJT88900Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices to improve safety during collection, and performing detailed oil testing and analysis. Additionally, the selected contractor must provide on-site training for up to 20 agency staff members and develop comprehensive standard operating procedures. All work must adhere to NETA MTS standards, IEEE guidelines, NFPA 70E safety protocols, and ASTM D923 and D924 sampling requirements, with infrared inspections performed by ASNT Level 1 certified technicians or equivalent. The agency intends to make a single award to the most capable offeror based on their project experience with utilities or industrial facilities, proposed staffing and methodology, personnel availability, and cost-effectiveness. Proposals must be submitted electronically via PlanetBids by December 23, 2026, at 3:00 pm. Required documentation includes a detailed project approach, a company profile, three references from the last five years, and various certifications including a Non-Collusion Statement and Workers Compensation Certificate. The contract will utilize fixed pricing with a not-to-exceed total value and requires the contractor to be registered with the Department of Industrial Relations as a public works contractor. Payment will be processed electronically via ACH within 30 days of invoice approval.
Inland Empire Utilities Agency

POSTED

about 9 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project scope requires a qualified electrical contractor to inspect, test, repair, and certify all emergency lighting systems, which includes inventorying fixtures, simulating utility outages for functional testing, and replacing ten failing or outdated ballasts with LED-compatible versions. Key deliverables include the application of durable, uniquely numbered labels to all fixtures and the integration of a recurring 30-day functional testing schedule into the facility's Computerized Maintenance Management System. All work must adhere to NFPA 101 (2024 Edition), NFPA 70, and OSHA safety regulations. The estimated contract value ranges between $25,000 and $100,000, with a performance period of 30 business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be awarded based on overall best value. Mandatory requirements for submission include a physical site visit, a detailed cost breakout on company letterhead, and a bid bond guarantee of 20% for bids exceeding $25,000. Awarded contractors must provide performance and payment bonds and comply with the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and various FAR clauses regarding small business utilization and security. This opportunity is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$5,850

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

Kodiak, AK, 99619, USA

Set-Aside

SBA

Award Issued Date

Documents

7

70Z04520QPJT88900.pdf

PDF

DowtyPUB1108TestRig9133-D.pdf

PDF

EpilogFusionM2_40_Power.pdf

PDF

Hangar3Outlets_134Plan.pdf

PDF

PropShopPower.pdf

PDF

Statment+of+Work+%28SOW%29.docx

DOCX

WDOL+2015-5688.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Combined Synopsis

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base KODIAK(00045)
Contacts2 people available
OfficeKODIAK, AK, 99619, USA
Office AddressKODIAK, AK, 99619, USA
Contacts
Thomas P. Schuller
Jami L. Gardner

Full Description

Show more
GENERAL REQUIREMENTS The contractor shall provide all supervision, labor, equipment, materials, and transportation to install a single phase 208V circuit and plug in Hangar 1 and two circuits (1x 120V and 1x single phase 208V) in Hangar 3. Items in this scope of work are considered the major items of work required to complete the work effort, and in no way limits details & work not specified included that the contractor is responsible for and required to be installed. This may include requirements in referenced documents, code requirements, and workmanship details. POINTS OF CONTACT -The Contracting Officer (KO) is Tim Cowley (907) 487-5180 x6619. -The Contracting Officer's Representative (COR) is Forrest Wallace (907) 888-3000. SCOPE The following items comprise the scope of work for this project. Items will not necessarily be completed in the order listed. HANGAR 1 PROP SHOP: General Description: Demo one 120V circuit in Hangar 1's Propeller Shop fed by Panel 1LE. Circuit is fed from breaker 22 and runs via cable to an existing hydraulic jenny. Keep disconnect mounted to wall. Install one new 208V single phase circuit with a 15Amp two pole breaker to power the existing hydraulic jenny via a receptacle mounted immediately below the existing disconnect. New EMT conduit (approximately 70 feet) will run from the panel to the disconnect on the wall then down to the new receptacle. Install a new plug on the hydraulic jenny and land conductors on appropriate terminals in the hydraulic jenny. Cable connecting the hydraulic jenny should be reused with the new plug. All work is in the same room as the panel. Detailed Description: Demo circuit from panel 1LE CKT 22 in the prop shop of Hangar 1 to include associated cable leave disconnect in place. Provide demo'd materials to the Govt. Install one new 15 Amp two pole breaker. Relabel panel schedule with the new - Hydraulic Jenny circuit. Run new EMT conduit exterior from the panel to the ceiling, to the plan West wall then down to the existing disconnect and to a new L6-15R outlet below. - PropShopPower.pdf shows approximate locations. Label outlet box with panel and circuit numbers. Replace existing label on disconnect. Use 3 new conductors, 12AWG THHN/THWN (neutral unused). Install a new L6-15P on the Hydraulic Jenny cable. This may require replacing the existing cord (approximately 30 feet). At connection to hydraulic jenny, use a metallic box cable connector with a strain relief function to protect terminal landings and wire. Rewire Hydraulic Jenny cable connections to appropriate terminals as outlined on page 15 in - DowtyPUB1108TestRig9133-D.pdf. Ground/bond per NEC. Coordinate work inspection prior to establishing power to the Hydraulic Jenny. HANGAR 3 RADAR ROOM: General Description: Install two new circuits to power a new laser engraver in Hangar 1's Radar Room. One circuit will have a single dedicated 20 A receptacle and one circuit will have a 208V single phase receptacle with a 15 amp breaker. Reuse existing pathways as much as is practical. Receptacles are located in the same room as the panel. Detailed Description: In Panel 1NLD, use circuits 17 and 19 to install a new 208V single phase 15 Amp breaker with a single NEMA L6-15R receptacle. Receptacle location is NE Corner of the room. Coordinate with COR for exact placement. Use #10 wiring with #12 ground in 3/4" EMT. It is possible that there may be reusable conduit pathways. Confirm 208 volts at outlet and report voltage to the COR. Remove original receptacle associated with circuits 17 and 19 located in the NE corner of the room and attach a cover plate. Label cover plate with pathway source (PNL 1NLD). Install a single NEMA 5-20R receptacle fed from 20 amp circuit #41. Reuse conduit from existing circuit 41. Refer to - Hanger3Outlets_134Plan.pdf for locations. Label outlets and wiring in the outlets covered by this work with panel and circuit number. Update panel schedule. Ground conduit and equipment per NEC. All conduit will be EMT. All work will install new THHN/THWN conductors and reuse existing conduit as much as practical. Minimum conductor size is 12. All work shall comply with NFPA 70, the NEC. Unsatisfactory performance shall result in work being re-accomplished at no cost to the government. The ability to reuse pathways is not guaranteed by this SOW. Locations of existing equipment shown in drawings may be inaccurate. Spring type connectors will not be used in this project. The Contractor shall keep the COR or KO fully informed on the daily progress of the work; from the start through completion of inspection. The government shall use a 100% surveillance method. Inspection of work shall be performed periodically while work is being performed and prior to contractor leaving the site. The COR will conduct these inspections and provide final acceptance of the work. PERFORMANCE PERIOD Services shall be completed NLT 21 days after notice of award. WORK HOURS Normal working hours for this project shall be Monday through Friday 0700-1100 and 1430-1700 excluding all Federal holidays. Work outside these hours shall require the written approval of the Contracting Officer or his/her authorized representative. Contractor will check in with maintenance control the respective Hangar before starting work each day and at completion. GENERAL REQUIREMENTS The work includes demolition and removal of resulting rubbish and debris. Store materials that cannot be removed daily in areas specified by the COR. The electrician will have a current - certificate of fitness with the State of Alaska. Electrician's company shall have an - Electricians Administrators License in the State of Alaska. There will be an electrical utility outage for each panel as part of this contract during installation of the breakers. Before any physical work begins, the Contractor shall obtain and fully execute a USCG Utility outage permit. The form shall be submitted for approval at least 3 days in advance of work. Contractor can obtain this form from the COR. Comply with any and all state, federal and local ordinances, laws and Regulations. The contractor is responsible for the Health and Safety of the Contractor's employees, subcontractors, suppliers, agents, inspectors, visitors, the general public, and any other associated with or interacting with the Contractor who provides labor, goods, or other services on the Site. The Contractor is responsible for proper disposal and any associated fees to the local landfill operated by the Kodiak Island Borough. End

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS