Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on May 6, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Insulation and Ceiling Repairs BRD Allegheny NF PA

Closed
1224H819Q0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Contract Value

$14,700

NAICS

238310 - Drywall and Insulation Contractors

Place of Performance

The Allegheny National Forest, Bradford Ranger District is near the Village of Marshburg, Corydon Township, in McKean County, P, PA, USA

Set-Aside

SBA

Award Issued Date

Documents

1

1224H819Q0010_Complete.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Allegheny National Forest
Contacts1 person available
OfficeWARREN, PA, 16365, USA
Office AddressWARREN, PA, 16365, USA
Contacts
Alan J. ZeroContract Officer

Full Description

Show more
A leak in the condensate line from one of the office furnaces caused water damage to the attic spray-foam insulation and office ceiling. This work includes the removal and disposal of the damaged insulation and wall and ceiling sections; replacement of the section of insulation; and repairs to the ceilings and walls. Restore exposed finishes of patched areas and where necessary extend finish restoration into retained adjoining work in a manner which will eliminate evidence of patching and refinishing. It also includes the replacement of the existing Schedule 40 condensation drain pipe, heat tape system, and insulation with new High Density Cross-linked Polyethylene (PEX) tubing, heat tape system and pipe insulation. Once the wall and ceiling sections are removed, work with the Contracting Officer to determine the existence of mold. In the event that mold is discovered, it will need to be remediated prior to completing the repairs. However, the remediation of mold is not considered part of this work. The existing insulation is NCFI Spray Foam System 12-002 which is a two component, self adhering, seamless spray applied polyurethane insulation system. It was placed to an R-38 value. This will be matched. Replace the existing condensation drain line with the same diameter PEX tubing installed to drain to the mechanical room without low spots. Horizontal runs of tubing shall slope at least 1/8" per foot in the direction of discharge. All fittings and connections shall be made in accordance with the manufacturer's installation instructions. Provide allowance for thermal expansion and contraction of PEX tubing passing through a wall, floor, ceiling or partition by installing through an appropriately sized sleeve as needed. Support PEX tubing as recommended by manufacturer. The existing heat cable system is Raychem, RayClic and includes a sensor that shall be placed in the attic space. Replace the system in kind. The system shall be self-regulating, cable wrapped around the condensate line. Do not use adhesive on PEX tubing. Install new pipe insulation compatible with heat cable system in accordance with manufacturer's instructions. Replace any damaged batt insulation in the walls to match existing. Replace gypsum board to match existing including all taping, spackling and priming. Prepare as necessary. Apply two coats of Sherwin Williams ProGreen low VOC paint, SW 7006 Extra White color on ceiling and SW 6112 Biscuit color on the walls. Reuse any wall paneling, molding and trim.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS