Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Insulation and Vapor Barrier Materials Supply

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the supply and delivery of Department of Defense-compliant insulation materials and vapor barriers specifically designed for chilled water piping systems at Tinker Air Force Base. All materials must meet strict DoD standards for performance, durability, and environmental compatibility, ensuring optimal thermal efficiency and moisture control in critical infrastructure. The effort is classified as a subcontract under a Total Small Business Set-Aside, reserved exclusively for small businesses as defined by the SBA, with the NAICS code 326199 indicating manufacturing of other rubber and plastic product manufacturing. Performance is required at the location in Coffeyville, Oklahoma, with a zip code of 73145, and the solicitation is administered by the Department of Defense through the FA8137 AFSC PZIOC office. The response deadline is strictly set for April 30, 2026, at 7:00 PM, and all submissions must be finalized prior to this time to be considered.

General Info

Supply DoD-compliant insulation and vapor barriers for Tinker AFB chilled water systems, small business set-aside, Coffeyville OK, response by April 30, 2026.

NAICS

326199 - All Other Plastics Product Manufacturing

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

SBA

Documents

This scope was carved out of FA813726R0017.

The full solicitation package (13 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

TINKER AFB MAC BOA WWYK190099 INSULATE AND INSTALL VAPOR BARRIER ON EXISTING HEATING AND CHILLED WATER PIPE B3708

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and delivery of DoD-compliant insulation materials and vapor barriers for chilled water piping systems at Tinker AFB.

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 237310
Federal
WWYK100209-Repair Perimeter Dr and Industrial Blvd
Solicitation # FA813727R0003
Solicitation FA813727R0003 is a pre-solicitation for the full depth replacement of Perimeter Drive and specific sections of Industrial Boulevard at Tinker Air Force Base, Oklahoma. This opportunity is strictly set aside for SBA Certified Women-Owned Small Businesses (WOSB), with an estimated project value between 5 million and 10 million dollars. The scope of work includes providing all labor, materials, and equipment to remove and replace damaged or severely cracking concrete, as well as installing pavement markings. A mandatory site visit is scheduled for October 20, 2026, requiring an RSVP by October 16, 2026, and requests for information are due by October 27, 2026. The contract mandates strict adherence to quality and safety standards, including the Davis-Bacon Act, EM 385-1-1 safety requirements, and Foreign Object Debris awareness training for all personnel. Key personnel requirements include a Project Manager with 10 years of commercial construction experience and a Superintendent with at least five years of experience. Deliverables include a baseline construction schedule due within 10 calendar days of the Notice to Proceed, weekly inspection records, and final as-built drawings in both PDF and AutoCAD formats. The contractor is responsible for a comprehensive inspection process, including a contractor punch-out inspection and a pre-final inspection within five days of substantial completion.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 1 day
View Details
NAICS: 238190
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

13 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS