Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TINKER AFB MAC BOA WWYK190099 INSULATE AND INSTALL VAPOR BARRIER ON EXISTING HEATING AND CHILLED WATER PIPE B3708

Closed
FA813726R0017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 12 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

This solicitation, FA813726R0017, is a total small business set-aside under NAICS code 236220 for the insulation and installation of a vapor barrier on existing heating and chilled water piping in Building B3708 at Tinker Air Force Base, Oklahoma, with an estimated value below $25 million. Only MAC BOA holders who attended the mandatory site visit on April 15, 2026, are eligible to submit proposals, and the deadline for proposals is May 18, 2026. The solicitation is strictly limited to prime MAC BOA contractors, with subcontractors required to be sponsored by a prime for base access, and all interested parties must RSVP to attend the site visit with an Entry Access List if base access is needed. The project requires full replacement of chilled water pipe insulation using cellular glass insulation with an all-service jacket and vapor barrier, complying with Tinker AFB Facility Standards and Tri-Service CADD Standard Release 6.0, and all as-built drawings must be submitted in .dwg and .pdf formats. The award will follow a lowest priced technically acceptable (LPTA) process, where technical acceptability is determined by an unacceptable or acceptable rating based solely on low risk in capability, management, schedule, and planning, with price serving as the deciding factor among technically acceptable offerors. All proposals must be structured into three volumes—technical, price, and order documentation—with strict formatting rules including Arial 12-point font, 1.5 line spacing, and specific file type requirements, and must be submitted electronically via email using approved Microsoft and Adobe formats, with no password protection or ZIP compression permitted. Performance must begin within 10 days of Notice to Proceed and be completed within 179 calendar days. Compliance with FAR clauses 52.204-7, 52.219-28 Alternate I, 52.246-12, and others are mandatory, including representations for UEI and CAGE codes, small business status, and adherence to security protocols requiring controlled area training, escort ratios, and advance submission of Entry Access Lists. Invoicing must be processed through Wide Area WorkFlow, and all key personnel must be identified and their resumes submitted within five days of award, with strict limitations on personnel substitutions and dual roles. Specific security clauses and attachments, including an Appointment of Security Representative Letter and Controlled Area Training materials

General Info

Small business set-aside for vapor barrier and insulation work at Tinker AFB, LPTA award, mandatory site visit, strict submission rules, 179-day performance window.

Agency

Department Of Defense → FA8137 Afsc PziocView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

SBA

Documents

(13)

190099_ATT08_SOW.pdf

PDF

2007-HUM.pdf

PDF

Section L - Instructions to Offerors for Construction Project

PDF8 pagesinstructions-to-offerors

1989-OrigConst.pdf

PDF

Section M - Evaluation Factors for Award

PDF5 pagesevaluation-factors

WWYK190099+Initial+Site+Visit+Sign-in+Sheet.pdf

PDF

Solicitation+-+FA813726R0017+Rev1.pdf

PDF

190099_ATT11_Drawings.pdf

PDF

2006-HVAC125.pdf

PDF

2002-HVACControls.pdf

PDF

Initial Site Visit Sign-In Sheet for Project WWYK190099

XLSXsite-visit-form

Wage+Determination+OK20260049+01-23-2026.pdf

PDF

190099_ATT10_Submittal_Register_1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Organization / Agency
Department Of Defense → FA8137 Afsc Pzioc
View Agency Profile
Office AddressTINKER AFB, OK, 73145-9125, USA

Full Description

Show more

***** THIS PROJECT IS CANCELED *****


No responses required from MAC BOA Holder GC's that attended site visit.



Only the MAC BOA Holder GCs that attended Site Visit on 15 April 2026 will be able to continue forward toward the award.


Updated 20 April 2026


Initial site visit sign in sheet attached.  Reminder that RFIs are due 21 April 2026.


Only the MAC BOA Holder GCs that attended Site Visit on 15FApril 2026 will be able to continue forward toward the award.



Only the MAC BOA Holder GCs that attended Site Visit on 15 April 2026 will be able to continue forward toward the award.


Updated 15 April 2026


Solicitation Rev1 is attached, proposals due 18 May 2026


Solicittion Section L & M are attached


Initial site visit sign in sheet attached.  Reminder that RFIs are due 21 April 2026.


As built drawings attached.


If a Prime MAC BOA GC is in need of any other documents to provide a proposal, please contact the CO.


Only the MAC BOA Holder GCs that attended Site Visit on 15FApril 2026 will be able to continue forward toward the award.



This posting is for Tinker AFB - MAC BOA Holders ONLY.  


Project Solicitation Number:  FA813726R0017


Project Title: WWYK190099 – INSULATE AND INSTALL VAPOR BARRIER ON EXISTING HEATING AND CHILLED WATER PIPE
Project Location: Tinker AFB - B3708


The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the replacement of the chilled water piping insulation in B3708 at Tinker Air Force Base (AFB), Oklahoma


The estimated project value is below $25M and is restricted to SB MAC BOA holders only.


Project specific documents are attached to this posting.


If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.


Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.


This posting is for Tinker AFB - MAC BOA Holders ONLY.  


After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.  Your RSVP email must be received within 3 calendar days from the posting of this project.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.   ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.


Initial Site Visit is currently set for 15 April 2026 at 0900 CT, we will meet at the North entrance for B3708.


You must attend the Initial Site Visit for the project to be considered eligible to propose.


This posting is for Tinker AFB - MAC BOA Holders ONLY.  

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 236220
New
Federal
TINKER AFB MAC BOA-WWYK260007- Renovate Pratt & Whitney Area - B3001
Solicitation # FA813726R0033
Solicitation FA813726R0033 is a negotiated construction and design project for the renovation of the Pratt and Whitney Area in Building 3001 at Tinker Air Force Base, Oklahoma. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders and is a total small business set-aside. The project involves a complete interior renovation of the second-floor space to address flood damage, including architectural, structural, mechanical, electrical, and fire protection upgrades. The scope includes the replacement of damaged studs at stairwells and the modification and rebalancing of existing HVAC and control systems. The contract is divided into two primary line items: one for construction and one for design. The acquisition follows the Lowest Priced Technically Acceptable (LPTA) source selection procedure, where the award is granted to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical acceptability is based on capability, management, schedule, and planning, with no credit given for exceeding minimum requirements. The period of performance is 329 calendar days from the notice to proceed, with work required to commence within 10 calendar days of that notice. Proposals must include a technical volume, a detailed pricing volume broken down by CSI Master Format, and a bid bond. Following several amendments, the final proposal submission deadline is September 16, 2026, at 12:00 PM CST.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation FA8137-26-R-0040, is a competitive Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for general construction services. The contract supports a broad range of sustainment, maintenance, repair, alteration, and renovation projects for real property facilities at Tinker AFB, Oklahoma. The scope includes three execution methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC has a total aggregate maximum value of 950 million dollars and is structured with an initial five-year ordering period beginning March 26, 2027, followed by a five-year option period. The procurement is a partial small business set-aside under NAICS 236210. Award decisions are based on the Highest Technically Rated Offeror (HTRO) methodology, where candidates must meet a Minimum Technical Threshold Rating (MTTR) of 8,190 points for Appendix C or 7,140 points for Appendix D. Evaluation focuses exclusively on technical experience, including construction and design history, certifications, and staffing, with no cost evaluation performed at the IDIQ level. Contractors are required to provide 100 percent performance and payment bonds for task orders and must adhere to strict TAFB facility standards, safety regulations, and cybersecurity requirements. Proposals must be submitted electronically to the designated MACC Workflow Org Box, and all offerors must maintain active registration in the System for Award Management.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS