Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Intelligent Transportation Systems (ITS) Integration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Rancho Palos VerdesView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Rancho Palos Verdes, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260806003.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Western Avenue Traffic Flow Improvements Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rancho Palos Verdes
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Rancho Palos Verdes
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Integrate ATCS components into a centralized adaptive control platform, including configuration, software setup, and testing.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified firms, specifically targeting Disadvantaged Business Enterprises (DBE), to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, mechanical, electrical, and instrumentation design, as well as the equipping, testing, and commissioning of the groundwater production well. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water standards, Riverside County, and California State Water Resources Control Board regulations. The solicitation is open to various small business set-asides, including SDB, WOSB, and VOSB. Proposals must be submitted by September 1, 2026, and must include a cover letter, a detailed project approach, staff qualifications, a five-year representative project list, and three professional references. Award selection is based on the most advantageous proposal, considering both price and other factors. Selected consultants must maintain active SAM registration, provide a 100 percent performance and payment bond, and adhere to California prevailing wage laws. Payment is processed via monthly itemized statements with a 45-day review period, though federal award reimbursements must be made within 30 calendar days. The contract also mandates strict adherence to Cal/OSHA safety standards and requires a dedicated Project Manager to coordinate all communications with the District.
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details

More opportunities from California → City of Rancho Palos Verdes

Same awarding agency

NAICS: 237310
SLED
Western Avenue Traffic Flow Improvements Project
Solicitation # 20260806003
The City of Rancho Palos Verdes is soliciting bids for the Western Avenue Traffic Flow Improvements Project, a municipal construction initiative focused on upgrading traffic infrastructure through the installation of an Adaptive Traffic Control System (ATCS), median modifications, traffic signal enhancements, and related Intelligent Transportation Systems (ITS) components. The solicitation, numbered 20260806003 and posted on August 6, 2026, has a response deadline of September 28, 2026, at 4:30 PM Pacific Time, with submissions required exclusively via the PlanetBids portal. Work must be performed in accordance with Caltrans standards, City of Rancho Palos Verdes specifications, and applicable local and state regulations, including NPDES, Cal/OSHA, and air quality requirements. All performance occurs on-site within the highway right-of-way in Rancho Palos Verdes, California, with final acceptance contingent upon successful inspection and approval by the City’s Director of Public Works. The scope includes furnishing all labor, materials, equipment, and incidentals, as well as managing temporary traffic control, securing permits, and ensuring compliance with environmental and safety protocols. Contractors must demonstrate compliance with a pre-qualification process that includes verification of California State Contractor’s License and DIR registration, and must not have had licenses revoked, been debarred, filed for bankruptcy, or made claims against public agencies within a specified timeframe, as these trigger automatic disqualification. Submissions must include a comprehensive package with bid sheets, a bid bond, performance and payment bonds, insurance documentation adhering to City requirements, a noncollusion declaration, and detailed statistical information on business ownership and certifications, including MBE, WBE, DBE, and DVBE status. Evaluation prioritizes risk mitigation through a point-based system that rewards a clean claims history, continuous insurance coverage, and absence of criminal convictions, with point deductions applied for negative factors. While the total contract value is not disclosed, a 5% retention is withheld from progress payments under California Public Contract Code and released upon final approval. Special provisions mandate site-specific safety plans, restricted work hours, recycling of construction materials, protection of underground utilities, and immediate reporting of hazardous materials. The contractor is required to provide a one-year maintenance guarantee and must designate a superintendent and project manager to be present on-site during working hours. No specific contract type, FOB terms, or federal accounting codes are specified, and the procurement does not require UEI or C
Highway, Street, and Bridge Construction

POSTED

10 days ago

DEADLINE

in about 1 month
View Details