Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Intent to Single Source Emerson-Flexim Clamp-On Flow Measuring Devices From CL2 Solutions

Closed
26-X-01679State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The David L. Tippin Water Treatment Facility is initiating a single-source procurement for Emerson-Flexim clamp-on flow measuring devices to support essential calibrations and regulatory compliance. These devices are critical for point-to-point flow measurement between connection points, and the facility requires the use of genuine Emerson-Flexim parts to maintain safe and reliable equipment operation. SL2 Solutions has been identified as the sole municipal representative for Emerson-Flexim equipment, including both meters and parts, within the state of Florida. This solicitation, identified by number 26-X-01679, was posted by the Florida Water Production agency on August 20, 2026. The procurement process is managed through the City of Tampa, with a response deadline set for August 26, 2026. Interested parties or relevant stakeholders can coordinate with the designated points of contact, Debbie Lambert or Tonya Parker-Rimes, regarding this intent to single source.

General Info

Single-source procurement of Emerson-Flexim flow measuring devices from SL2 Solutions for water treatment.

Documents

2

CL2 Solutions Single Source Request – Emerson Flexim Flow Equipment

PDF, High priority: read this firstspecial-notice
High

26-X-01679 Intent to Single Source Emerson-Flexim Clamp-On Flow Measuring Devices

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Water Production
Contacts2 people available
OfficeTampa, FL, 33610, USA
Organization / AgencyFlorida → Water Production
Office AddressTampa, FL, 33610, USA
Contacts
Debbie LambertAdministrative Assistant II
Tonya Parker-RimesCertified Procurement Analyst

Interested Companies (2)

Lotus USALos Angeles, CA

Full Description

Show more
The David L. Tippin Water Treatment Facility utilizes Emerson-Flexim Clamp-On flow measuring devices for point to point measuring of flow between connection points. Emerson-Flexim clamp on flow meters are used for calibrations and regulatory requirements. To ensure the safe and reliable operation of the Emerson-Flexim equipment only genuine Emerson-Flexim parts should be utilized. SL2 Solutions is sole municipality representative for Emerson-Flexim equipment in the state of Florida for parts and meters.

More opportunities from Florida → Water Production

Same awarding agency

NAICS: 333914
New
SLED
Mobile Water Bars
Solicitation # 27-P-00028
The City of Tampa is soliciting quotes for the procurement of two custom-branded, mobile water bars to be used by the Tampa Water Department for community outreach and public education. These freestanding, portable hydration stations must be constructed from commercial-grade, food-safe, and weather-resistant materials. Key technical requirements include a minimum 18-gallon potable water capacity, multiple dispensing spigots to minimize wait times, an integrated water-chilling system, and heavy-duty casters for transport via utility vehicles. The units must also support high-durability custom graphic wraps for department branding and educational messaging, and include a comprehensive cleaning and maintenance guide. The contract is managed by the Water Production agency, with a delivery requirement of 180 days after receipt of the purchase order to the Tampa Water Department Facility. Bidders must submit quotes electronically via OpenGov by November 3, 2026. Evaluation is based on being the lowest responsive and responsible bidder, with requirements including proof of insurance and a minimum of three years of experience supplying mobile water stations to commercial or municipal customers. Award may be made by division, line item, or aggregate total. Payment is processed approximately 30 days after the receipt and acceptance of materials and itemized invoicing.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

4 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS