Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on July 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Interceptor and Force Main Improvements

Awarded
193062State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well and valve vault with associated appurtenances, as well as the demolition of existing pumps and piping. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the issuance of a Notice to Proceed. The contract is administered using EJCDC standard forms and will be awarded to the responsible bidder submitting the lowest responsive bid. Key requirements for bidders include the submission of bid security, evidence of authority to sign, and specific M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. Participation goals are set at 10.9 percent for MBE and 10.4 percent for WBE per EPA guidelines, with a combined state goal of 10 percent. The contractor must provide performance and payment bonds, maintain insurance from providers with an A.M. Best rating of A-VII or better, and adhere to OSHA fall protection and various technical standards, including AWS D1.2 for welding and NEMA MG1 for motors. Payment will be processed in equal monthly amounts via EJCDC C-620 applications, with a 200,000 dollar contingency allowance available for authorized additional work.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in about 18 hours
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia under solicitation ITB-2026141. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with adherence to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Requirements include a 5 percent bid guarantee, performance and payment bonds equal to 100 percent of the contract amount, and compliance with Davis-Bacon wage determinations and OSHA safety standards. Bidders must provide a minimum of three similar project references and confirm they are not on any government debarment lists.
WG Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in about 18 hours

AI Contract Overview

Show more

The Abbottstown-Paradise Joint Sewer Authority is soliciting sealed bids for the Interceptor and Force Main Improvements project in Adams and York Counties, Pennsylvania. The scope of work involves the removal and replacement of approximately 4,000 linear feet of force main and 300 linear feet of gravity sewer, including associated manholes. The project is partially funded by a federal grant from the Department of Treasury via the Commonwealth Financing Authority and is subject to the Pennsylvania Prevailing Wage Act. All bids must be submitted electronically through the PennBid portal by 10:00 AM on July 22, 2025, and must include a bid bond or certified check for 5% of the maximum bid. The contract duration is 120 calendar days, with a two-year correction period following substantial completion. Award will be granted to the lowest bidder whose proposal is determined to be in the best interests of the project, based on a qualitative evaluation of qualifications, unit prices, and financial ability. Technical requirements mandate strict adherence to PennDOT standards for work within state highway rights-of-way and prohibit product substitutions. The contractor is responsible for providing a bypass pumping plan and obtaining all necessary permits, with the exception of two provided by the owner. C.S. Davidson, Inc. serves as the administrative engineer overseeing contract oversight and payment certification.

General Info

Contract Value

$851,454

Place of Performance

Adams County, PA, USA

Set-Aside

NONE

Award Issued Date

Documents

6
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

Solicitation number changed from Abbottstown-Paradise Joint Sewer Authority, Adams County to 193062. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Adams County
ContactsNo contacts available
OfficeAdams County, PA, USA
Organization / AgencyPennsylvania → Adams County
Office AddressAdams County, PA, USA
ContactsNo contact information available

Interested Companies (96)

20130314143016
Advanced Rehabilitation TechnologyBryan, Ohio
All Pipe WorksBluffdale, Utah

See All 96 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Ref. #: Abbottstown-Paradise Joint Sewer Authority, Adams County
Sealed bids for removing and replacing approximately 4,000 linear feet of force main as well as removing and replacing approximately 300 linear feet of gravity sewer and associated manholes will be received online via the PennBid Program (https://pennbid.bonfirehub.com) by Abbottstown-Paradise Joint Sewer Authority, Adams County, Pennsylvania until 10:00 AM, Tuesday, July 22, 2025.
The bids will be publicly opened and read electronically, via PennBid’s website, at 10:00 AM (prevailing time), same date. Bid results will be available end of business day, same date.
Copies of Bidding Documents for Interceptor and Force Main Improvements are available online and at no cost via the PennBid Program at https://pennbid.bonfirehub.com.
NOTE: The members of the Abbottstown-Paradise Joint Sewer Authority have authorized C.S. Davidson, Inc., to act on their behalf by opening bids. Contracts will be awarded at a regularly scheduled meeting of the Authority.
A bid bond by acceptable surety or a certified check made payable to Abbottstown-Paradise Joint Sewer Authority in the amount of 5% of the maximum bid must be provided by each bidder with their bid.
A pre-bid conference will not be held.
Each bidder must be prepared to submit evidence of his qualifications to perform the work.
Notice is hereby given to bidders that this project is subject to the provisions of the Pennsylvania Prevailing Wage Act approved August 15, 1961 (Act No. 442, P.L. 987), as amended.
The Contract Time for this project is one hundred and twenty (120) calendar days.
This Project is being financed in part by a grant from the federal Department of Treasury, under the administration of the Commonwealth of Pennsylvania, Commonwealth Financing Authority. Abbottstown-Paradise Joint Sewer Authority reserves the right to accept any bid or reject any or all bids.
Abbottstown-Paradise Joint Sewer Authority
Amy Perry, Manager

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS