Interior Architectural Woodwork and Signage

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → CITY OF LA MIRADAView Agency

NAICS

238340 - Tile and Terrazzo ContractorsView NAICS

Place of Performance

La Mirada, CA, 90638, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260807011.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Public Works Ada Crew Restroom Remodel

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF LA MIRADA
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → CITY OF LA MIRADA
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Furnish and install interior woodwork and signage per approved design submittals and sample finishes. Requires precision craftsmanship.

Similar Contracts

Same NAICS industry code

NAICS: 238340
New
Federal
Painting and Coating ApplicationThe contract calls for surface preparation and application of mold and mildew-resistant paints and coatings as the final finish work in renovated bathrooms, ensuring durability and compliance with hygiene standards in high-moisture environments. The work is classified under NAICS code 238340 and is structured as a subcontract under a Small Business Set Aside, specifically reserved for small businesses as defined by the SBA. The project is located in Newport, with a zip code of 02841, and is managed under the Department of Defense by Naval Undersea Warfare Center Division Newport, indicating the work is for a federal facility requiring strict adherence to military or defense-related construction and renovation protocols. The solicitation was posted on August 7, 2026, with a response deadline of September 10, 2026, at 6:00 PM, providing potential contractors approximately 34 days to prepare and submit proposals. While no specific point of contact or agency office address is provided, the place of performance is clearly identified as Newport, and the work is intended as part of a larger renovation effort where surface prep and specialized coating application are critical to long-term facility integrity. Contractors must be certified small businesses eligible for SBA set-asides and must demonstrate experience in performing similar finish work in institutional or government-owned bathroom facilities, particularly those requiring resistance to moisture-related degradation.
Nuwc Division Newport

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238340
New
SLED
Swinerton Invitation for Prequalification of Qualified Subcontractors and Suppliers: Terrazzo
Solicitation # 0000039984
Swinerton is inviting qualified subcontractors and suppliers to prequalify for participation in the design-build construction of the new Energy and Innovation Building at California State University, Bakersfield, a 56,500 square foot multi-story facility that will house offices, research and teaching laboratories, a capstone design lab, and a flexible event space, along with outdoor areas intended for collaboration and engagement. The project is subject to public works regulations and prevailing wage requirements, and the work is being procured under a collaborative design-build model. Subcontractors specializing in terrazzo work must submit a completed Swinerton Prequalification Form and the Swinerton Master Service Agreement by the deadline of August 28, 2026, at 5:00 PM. Additionally, the project includes a 6 percent Disadvantaged Business Enterprise (DVBE) participation goal, and interested parties are expected to comply with all state and local procurement guidelines. The anticipated construction start date is January 1, 2026, with completion scheduled for June 16, 2027, and trade bid packages are expected to be released on August 7, 2026. Prequalification materials and further details are available on Swinerton’s subcontractor prequalification webpage, and all inquiries should be directed to subcontractorprequal@swinerton.com.
State of California

POSTED

4 days ago

DEADLINE

in 18 days
View Details
NAICS: 238340
New
SLED
Swimming Stone Brick Paver Replacement
Solicitation # 26-076
The City of Aurora is soliciting bids for the replacement of 1,000 square feet of brick pavers at the Swimming Stones water feature located at 1 W Benton Street, with work to be performed exclusively by a Unilock-approved subcontractor whose certification must be submitted with the bid. The scope includes removal and replacement of both the outer ring and inner circle using Unilock IL Campo Black pavers, installation of up to a 3/4-inch layer of leveling sand, joint filling with engineer-approved nitro joint sand, and replacement of the existing concrete barrier curb with a new 6-inch-wide flush curb. The contractor is required to purchase a minimum of 3,000 square feet of pavers to secure volume pricing, with excess material delivered to the City’s storage location at 339 Middle Avenue. All work must comply with the City of Aurora General Specifications, Illinois Department of Transportation standards, and Standard Specifications for Water and Sewer Main Construction in Illinois, Seventh Edition, with materials conforming to ASTM standards when specific specs are not provided. The contract mandates a Performance and Payment Bond equal to 100% of the contract value, with the bond term lasting one year and auto-renewal for a second year. Insurance requirements include Workers’ Compensation at statutory levels, General Liability of $1 million per occurrence and $2 million aggregate, Auto Liability of $1 million, and Umbrella Excess Liability of $2 million per occurrence and aggregate, with policies issued by companies rated A:VII or higher by A.M. Best and licensed in Illinois. The contractor must comply with all Federal, State, and local laws including the Illinois Prevailing Wage Act, OSHA, non-discrimination statutes, and the Drug-Free Workplace Act, and must participate in a registered apprenticeship program if the contract exceeds $25,000. All workers must be properly trained, with the City retaining the right to remove any personnel deemed objectionable. The project must begin no earlier than October 15, 2026, and be completed by November 20, 2026, with the adjacent Benton Street walkway required to be open to pedestrians on October 30 and 31, 2026. A $4,000 allowance is included for items ordered by the Engineer, and payment is made upon submission of invoices via email or mail to the Purchasing Division using the assigned Purchase Order Number and electronically through EFT whenever possible.
Downtown Services

POSTED

5 days ago

DEADLINE

in 15 days
View Details

More opportunities from California → CITY OF LA MIRADA

Same awarding agency

NAICS: 236220
New
SLED
Public Works Ada Crew Restroom Remodel
Solicitation # 20260807011
The City of La Mirada is soliciting bids for the remodeling of its Public Works crew restroom to achieve full compliance with the Americans with Disabilities Act (ADA), under Capital Improvement Project No. 2026-01. The scope of work encompasses complete demolition of existing facilities, structural modifications including the replacement of ceiling joists and door headers, installation of new wood framing walls, and the construction of a single-occupant ADA-compliant restroom alongside one men’s restroom. Essential elements include the installation of ADA-compliant plumbing fixtures, shower stalls, grab bars, mirrors, dispensers, and signage, along with the replacement of all doors, frames, and hardware with hollow metal systems. The project requires new porcelain tile flooring and wall finishes over cement backer board or mortar beds, new rubber base trim, Corian countertops, solid phenolic partitions, and a new exhaust fan system with ducting. Electrical upgrades include new LED lighting fixtures with occupancy sensors, switches, and outlets, while all work must conform to the 2010 California Building Code, applicable federal ADA standards, and ASTM specifications for materials such as zinc-coated steel and stainless steel. All materials must be delivered in original sealed packaging, properly labeled, and protected prior to installation, with tile samples and salvage items handled in accordance with detailed labeling and storage requirements. The contract requires the selected contractor to provide all labor, equipment, supervision, temporary construction, and services necessary for complete project execution, adhering strictly to the City’s specifications on quality, materials, and workmanship. Insurance obligations are substantial, including a comprehensive general liability policy with $5 million aggregate and per-occurrence limits, workers’ compensation and employer’s liability coverage to California Labor Code Section 3700 minimums, $1 million in automobile liability per claim and aggregate, and an umbrella policy matching the breadth of primary coverages. A performance bond and a payment bond securing labor and material claims are mandatory, with the latter remaining active until statutory deadlines for wage claims pass. The contractor must comply with non-discrimination mandates covering all protected classes under state and federal law, coordinate work with City utility and maintenance teams, and submit a Construction and Demolition Waste Management Plan. Payment terms require use of city-provided forms, with payments issued within 45 days of a properly documented and undisputed request, including an updated construction schedule. The City retains the right to terminate the contract for convenience with 30 days’ written notice and will not compensate for delays, and liquidated damages of
Commercial and Institutional Building Construction

POSTED

about 21 hours ago

DEADLINE

in 22 days
View Details