Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Mississippi was posted on June 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Interior Flooring Installation (VCT/LVT Replacement)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238350
New
SLED
IFB-27044 Door and Hardware Upgrades Package #3 at Harlem Park Bldg. #078 (Augusta Fells HS #430), Francis M Wood Bldg. #178 (Vivien Thomas Medical Arts Academy #328), & BSA #415
Solicitation # IFB-27044
Solicitation IFB-27044 is an invitation for bids issued by Baltimore City Public Schools for Door and Hardware Upgrades Package 3. The project involves replacing doors and hardware to meet current security, fire, and ADA standards at three specific locations: Harlem Park Building 078 (Augusta Fells HS 430), Francis M Wood Building 178 (Vivien Thomas Medical Arts Academy 328), and the Baltimore School for the Arts 415. All work must be completed within 365 days of the purchase order issuance. The scope includes the installation of hollow metal doors and frames adhering to ANSI/SDI-100, NFPA 80, and NFPA 101 standards, with a requirement that materials be made in the USA whenever possible. Bids are due by November 23, 2026, and must be submitted in PDF format via the eMaryland Marketplace Advantage portal. The contract will be awarded to the lowest qualified, responsive, and responsible bidder. Applicants must be General Contractors licensed in Maryland, in good standing with the Department of Assessments and Taxation, and prequalified by the Baltimore City Contractor Pre-Qualification Committee. Required submissions include a two-part proposal covering technical details and MBE/WBE commitments, alongside several affidavits regarding non-collusion, anti-bribery, and debarment. Project execution requires strict adherence to safety and operational guidelines, including compliance with OSHA, MOSHA, and lead-based paint certifications. Because the facilities remain occupied, work must be performed during non-school hours, and contractors must provide noise and dust barriers. Procurement goals are set at 15 percent for MBE and 7 percent for women-owned MBE. Payment will be processed via AIA forms upon final acceptance of the work, with partial monthly payments available based on progress.

POSTED

2 days ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract involves the removal and disposal of existing flooring, preparation of the subfloor, and installation of new resilient flooring materials such as VCT (Vinyl Composition Tile) or LVT (Luxury Vinyl Tile) in designated areas including classrooms, hallways, and common spaces within Robinson Hall and Burrus Hall. The scope ensures a comprehensive flooring upgrade across these facilities, enhancing durability and aesthetics. The work is being conducted under a subcontract issued by Alcorn State University in Mississippi, classified under the NAICS code 238350, which pertains to flooring contractors. The solicitation for this interior flooring installation was posted on June 5, 2026, with a response deadline set for July 9, 2026. While the contract does not specify set-aside types or detailed location information, it is focused on subcontractor engagement for the specified flooring replacement project. Interested parties are directed to official bid search platforms for further details and submission guidelines. This project represents a strategic facility improvement effort by the university, aiming to modernize key interior spaces through professional flooring services.

General Info

Flooring removal, subfloor prep, and installation of VCT/LVT in Robinson and Burrus Hall subcontract.

Place of Performance

MS, USA

Set-Aside

NONE

Documents

This scope was carved out of 9210-26-R-IFBD-00024.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Invitation for Bids for floor replacement for Robinson Hall & Burrus Hall on the Lorman Campus at Alcorn State University.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMississippi → ALCORN STATE UNIVERSITY
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal and disposal of existing flooring, subfloor preparation, and installation of new resilient flooring such as VCT or LVT in classrooms, hallways, and common areas at Robinson Hall and Burrus Hall.

More opportunities from Mississippi → ALCORN STATE UNIVERSITY

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS