Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on June 20, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Interior Reservoir Disinfection

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA and OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. The contractor is required to provide a Certified Industrial Hygienist to verify materials and perform the final clearance walkthrough, as well as a detailed remediation plan covering containment, filtration, and waste handling. This is a single lump sum contract set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award decisions are based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). A mandatory site visit was scheduled for October 27, 2026, with proposals due by November 10, 2026. Successful bidders must provide proof of an Indiana Contractor's License, Davis-Bacon Act wage rate compliance, and specific automobile and workers compensation insurance. Work must commence within 14 days of the Notice to Proceed, and all workmanship is guaranteed for one year. Payment terms are Net 30.
Atterbury Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in about 11 hours
NAICS: 562910
New
SLED
C5613679-D - ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES
Solicitation # C5613679-D
This Master Agreement establishes a contract for the California Department of Corrections and Rehabilitation (CDCR) to obtain as-needed services for the cleaning, removal, transport, and disposal of hazardous materials, including asbestos-containing construction materials, lead-based paint, lead-containing materials, and mold-contaminated materials. The scope of work covers various CDCR institutions and facilities, such as High Desert State Prison, Ironwood State Prison, and Kern Valley State Prison. The contractor is responsible for all associated costs, including labor, equipment, personal protective equipment, and disposal fees, with compensation based on the Public Works Rate Sheet. Key performance requirements include a four-hour response time for emergency abatement and a strict submittal process that must be completed five business days before site work begins. The contract is awarded to the lowest responsive bidder, with preferences granted to California-based companies and certified Small, Micro, or Disabled Veteran Business Enterprises. Compliance with Federal, State, and local laws is mandatory, specifically Title 17 of the California Code of Regulations for lead abatement and Senate Bill 854 for prevailing wage requirements. Contractors must provide proof of pollution liability insurance and a payment bond upon award. Work is generally performed Monday through Friday from 6:30 AM to 3:00 PM, and the CCM Site Supervisor serves as the sole authority for determining the acceptance and satisfactory completion of all work.
California Department of Corrections & Rehabilitation

POSTED

1 day ago

DEADLINE

in 26 days

AI Contract Overview

Show more

This subcontract opportunity, issued by the California Public Works agency, requires the cleaning and chemical disinfection of the interior of a welded steel water reservoir. All work must be performed in strict compliance with AWWA D100 and NSF 61 standards to ensure the safety and quality of potable water systems. The project is categorized under NAICS code 562910. Interested parties must submit their responses by the deadline of July 23, 2024. Further details regarding the solicitation can be accessed through the provided procurement portal.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of CIP No. 60148.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CIP No. 60148 - John Lyttle Reservoir

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Clean and chemically disinfect the interior of the welded steel water reservoir in compliance with AWWA D100 and NSF 61 standards for potable water systems.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim to improve roadway structure and pedestrian safety. The scope of work includes removing and reconstructing asphalt concrete pavement using rubberized asphalt concrete, installing ADA access ramps, sidewalks, curb and gutter, and adjusting utility pull-boxes. The project also encompasses the installation of striping, signage, and pavement markings. Work is located on Katella Avenue from Auburn Way to Douglass Road and State College Boulevard from Katella Avenue to Gene Autry Way. The estimated construction cost has been updated to 5,041,243.00 dollars, with a performance period of 70 working days from the Notice to Proceed. The contract is governed by the 2024 Standard Specifications for Public Works Construction and specific project special provisions. Award will be granted to the lowest responsive and responsible bidder holding a General Engineering (A) license. Bidders must be registered with the Department of Industrial Relations and agree to be bound by the Community Workforce Agreement. Key submission requirements include a 10 percent bid bond, a non-collusion declaration, and the use of the OpenGov portal for proposals. Performance is subject to strict scheduling, with work affecting CALTRANS Right-Of-Way restricted to overnight hours between 10:00 p.m. and 5:00 p.m. Monday through Friday. Final payment is contingent upon the approval of As-Built Plans submitted 21 days prior to the final invoice.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 561730
New
SLED
Independence Jail Landscaping
Solicitation # ZP 24-020
The Independence Jail Landscaping project, managed by the Inyo County Public Works Department under solicitation ZP 24-020, involves comprehensive landscaping services including excavation, grading, irrigation installation, and planting. The project requires a contractor with at least one year of landscaping experience and a valid CA State License Board number. Key technical requirements include adherence to the Model Water Efficient Landscape Ordinance (MWELO), the provision of a Soil Management Report, and the implementation of an irrigation system with a distribution uniformity low quarter of 0.65 or higher. The contractor is responsible for providing all labor, materials, and equipment, as well as delivering training on planting techniques and ongoing maintenance. All work must comply with the 2010 Americans with Disabilities Act (ADA), Inyo County Public Works Standard Specifications from May 2020, and prevailing wage rates. Bids must be submitted electronically via the OpenGov portal by December 11, 2026. Required submission materials include a bid proposal, vendor certifications, and a proposal guarantee of ten percent of the total bid amount. Upon contract award, the contractor must provide a Faithful Performance Bond and a Labor and Materials Payment Bond, both for 100 percent of the contract amount. The estimated construction cost for the project is 97,140.00. Final acceptance is contingent upon a Certificate of Completion certified by a licensed landscape contractor or architect, supported by as-built drawings, irrigation audit reports, and soil analysis documentation.
Landscaping Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Etnies Skatepark Improvement Project (25P03)
Solicitation # 25P03
The City of Lake Forest is soliciting proposals for the Etnies Skatepark Improvement Project (25P03) to modernize its 62,000 square foot facility. The selected consultant will refine two preliminary concept designs into a final design and prepare a complete, bid-ready Plans, Specifications, and Estimates (PS&E) package. Key project enhancements include the addition of an 8,000 square foot all-wheel pump track, improvements to street lanes, the street plaza, and various bowls, the removal and replacement of the cradle, and the integration of public art. The consultant must coordinate with a separate ongoing project for skatepark building renovations and develop a construction phasing plan that minimizes operational disruptions. Proposals are due by December 4, 2026, and must be submitted via the City's eProcurement portal. The prime consultant can be any qualified firm providing a team with expertise in public skatepark design, municipal civil engineering, and public art. Evaluation is based on a pass/fail review of licenses and conflicts of interest, a qualitative assessment of technical knowledge, and a cost proposal evaluated on a time and materials, not-to-exceed basis. The anticipated project start date is February 9, 2027, with an initial contract term running through January 19, 2030, and options for two additional one-year extensions. Consultants who prepared the preliminary concept designs are ineligible to participate in this phase.
Engineering Services

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The City of Tustin is soliciting bids for the Tustin Legacy Linear Park Phase 3 project (CIP No. 20083), located between Armstrong and Warner. This construction project involves the development of a multi-modal park featuring a 12-foot main multi-modal path, a 6-foot secondary walking trail, a playground with PIP rubber surfacing, fitness pods, and an Esplanade along Compass Avenue using concrete pavers. Additional scope includes landscaping, irrigation, pedestrian and street lighting, and the implementation of a planted bioretention swale for stormwater management in compliance with Orange County NPDES requirements. The engineer's estimate for the project is 11,100,000 dollars, with a construction duration of 190 working days and a subsequent 90-working-day plant establishment and maintenance period. Bids are due electronically via OpenGov by December 10, 2026, at 2:00 PM PT, with a mandatory hard copy of the bid bond delivered to the City Clerk. The contract will be awarded to the apparent low bidder who meets all responsiveness requirements, including the submission of a Class A contractor's license, project references, and a list of subcontractors for work exceeding 0.5 percent of the total bid. Awarded contractors must provide payment, faithful performance, and guaranty bonds within 10 working days of notification. Payment will be issued through monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. All work must adhere to 2008 ADA Standards for Accessibility and Cal-OSHA safety requirements.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS