Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nevada was posted on March 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Interstate 215 And Airport Connector Interchange Phase 3

Closed
607347-24State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 17 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

Clark County is seeking bids from qualified firms or individuals to undertake significant improvements to the Airport Connector (SR-171) northbound from near I-215 to Sunset Road, as well as the I-215 westbound off-ramp to SR-171. The project encompasses a range of construction activities including widening existing ramps and lanes, realigning on-ramps, constructing a new ramp with a grade separation structure, and realigning George Crockett Road to improve traffic flow and safety. The scope extends to the installation of various infrastructure components such as bridges, retaining walls, pavement rehabilitation, traffic signals, lighting, signage, ITS systems, utility adjustments, landscaping, fencing, and traffic control measures. Demolition and removal of existing pavement, signage, fencing, and other structures are also included. The contract aims to enhance traffic capacity, safety, and operational efficiency at this critical interchange. The project is titled "Interstate 215 And Airport Connector Interchange Phase 3" with a solicitation number of 607347-24, posted on March 26, 2025, and a response deadline of April 16, 2025. The contract value is estimated to be between 50 million and 100 million dollars, and it falls under the NAICS code 238910, which pertains to site preparation contractors. The primary point of contact for inquiries is Scott Basquiat-Jones, reachable via email or phone. Bidders are encouraged to participate via Webex, with detailed access information provided. This project is part of Clark County’s ongoing efforts to improve transportation infrastructure within Nevada, and interested parties can find additional details and submit their bids through the provided online portal.

General Info

Place of Performance

NV, USA

Set-Aside

NONE

Documents

1

Office of the Labor Commissioner Contact Information

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNevada → Clark County
Contacts1 person available
OfficeN/A
Organization / AgencyNevada → Clark County
Office AddressN/A
Contacts

Full Description

Show more
Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid.   The work to be performed under this contract is for the improvements to the Airport Connector (SR-171) northbound from approximately I-215 to Sunset Road and the I-215 westbound off-ramp to SR-171. The improvements include: Widening the Sunset Road off-ramp from one lane to two lanes to provide additional storage capacity on the ramp for the traffic signal at the Sunset Road and Paradise Road intersection. Widening the northbound Airport Connector from three lanes to four lanes between the WN on-ramp and the Sunset Road exit. Realigning the WN on-ramp to go under the new ramp (ES) bridge. This WN on-ramp lane will join with the two lanes from the northbound Airport Connector and the dedicated lane for Sunset Road exit to form the four-lane northbound Airport Connector section. Constructing a new ramp (ES) that connects the northbound Airport Connector to a dedicated lane for the Sunset Road off-ramp. The ES ramp includes a new grade separation structure over the WN ramp. Realign George Crockett Road (GC) to northbound Airport Connector on-ramp to increase the weave distance between the GC on-ramp and the new ES ramp gore. The improvements generally consist of the bridge structure, retaining walls, pavement rehabilitation, cold planning and overlay, plantmix bituminous paving, curb and gutter, median, sidewalk, traffic signal, pavement markings, signing, street lighting, bridge lighting, bridge underdeck lighting, ITS, utility adjustments, landscape, impact attenuator, fencing, construction traffic control and other related items of work. The work includes demolition, removals and disposal of designated improvements including bituminous pavement, signage, fencing and other related items of work.   BID OPENING WEBEX DETAILS   Meeting Link: https://clarkcountynv.webex.com/clarkcountynv/j.php?MTID=m8c8a85a4c1a9d846497ec0161d762c60   Meeting Number: 2490 971 8344  
Join by video system
Dial contact@example.gov You can also dial 173.243.2.68 and enter your meeting number.

Join by phone

+1 (555) 000-0000 United States Toll
Access code: 2490 971 8344

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS