Interstate 5/El Toro Road Interchange Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Interstate 5/El Toro Road Interchange Project, managed by Caltrans District 12, involves the modification and improvement of a 1.9-mile stretch of Interstate 5 in Orange County, California. The project limits extend from post mile 17.8, approximately 0.2 mile south of the Los Alisos Boulevard overcrossing, to post mile 19.7, approximately 0.2 mile south of the Lake Forest Drive overcrossing. Spanning the cities of Lake Forest, Laguna Woods, and Laguna Hills, the primary objectives are to optimize traffic signals, improve mobility at local street intersections, reduce freeway ramp queuing, and implement technology to manage traffic demand. The project is currently in the environmental review and preliminary engineering phase, with a forecast date of August 5, 2026. Three primary alternatives are being evaluated: Build Alternative 1, featuring Southbound I-5 Hook Ramps; Build Alternative 3, focusing on Transportation Systems Management and Transportation Demand Management; and a No-Build Alternative. Environmental assessments, including a Draft Environmental Impact Report and Environmental Assessment, are subject to public review and comment through September 14, 2026. The project is categorized under NAICS code 237310 and is coordinated through Associate Environmental Planner Gabriela Duran.

General Info

Caltrans to improve I-5 interchange in Orange County using tech and ramp options to reduce congestion.

Agency

California → Caltrans, District 12 - Orange

Place of Performance

El Toro Road, Avenida De La Carlota, CA, 92653

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 12 - Orange
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 12 - Orange
Office AddressN/A
Contacts
Gabriela DuranAssociate Environmental Planner

Full Description

Show more
The project proposes to modify and improve the existing interchange between post miles (PMs) 17.8 and 19.7 within the cities of Lake Forest, Laguna Woods, and Laguna Hills in Orange County, California. The Project limits on Interstate 5 extend from approximately 0.2 mile south of the Los Alisos Boulevard overcrossing (PM 17.8) to approximately 0.2 mile south of the Lake Forest Drive overcrossing (PM 19.7), a distance of approximately 1.9 miles. Two Build Alternatives (Build Alternative 1: Southbound I-5 Hook Ramps, including design option 1a, Build Alternative 3: TSM and TDM) and the No-Build Alternative are being considered. The purpose of the proposed project is to improve traffic flow and traffic signal optimization, to improve traffic mobility at and through adjacent local street intersections, to reduce freeway ramp queuing, and apply technology to help manage traffic demand.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The scope of work is extensive, covering underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation including land surveying, site clearing, shoring, and subgrade roadbed work. Additional requirements include the provision of ready mix supply, precast concrete, asphalt paving, traffic signs, signals, lighting, and environmental support through storm water pollution prevention. This solicitation, identified as IFB No. 8003R1, is open to qualified small businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Interested bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The bid deadline is November 18, 2025, at 2:00 p.m., and invitations to bid are managed through the Building Connected system. For further details, plans and specifications are available for review at Kiewit's office in Santa Fe Springs, California.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 12 days
View Details
NAICS: 237310
New
SLED
2027029
Solicitation # 2027029
Solicitation RFP# 2027029 is a project issued by the Spartanburg County Government for the Walnut Hill Church Road Culvert Replacement in Campobello, South Carolina. The scope of work involves the installation of culverts in dry conditions with bypassed stream flow, concrete construction featuring waterproof surface finishes, and roadway improvements including HMA paving with PG64-22 liquid asphalt binder and driveway tie-ins. The project is governed by a hierarchy of standards starting with Special Provisions, followed by Spartanburg County Standards, SCDOT Standard Specifications for Highway Construction, the Manual on Uniform Traffic Control Devices, and SCDHEC regulations. Technical requirements include adherence to a detailed plan set covering erosion and sediment control, grading, and guardrail details, as well as the implementation of a specific detour and signage plan. The contractor is required to maintain a minimum of 1 million dollars in general liability insurance and comply with all federal and state laws, including non-discrimination and equal opportunity mandates. Key administrative requirements include the submission of a two-week look-ahead schedule every Wednesday by noon and a mandatory pre-construction conference. The contract includes a one-year warranty for materials and workmanship. Payments are made from appropriated funds, with undisputed invoices due upon receipt and considered past due after 30 days. The agreement becomes effective upon the issuance of a Notice to Proceed, and the contractor must ensure all site stakes are removed upon final completion.
Spartanburg County Government

POSTED

about 2 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
Federal
P1555U Wallace Creek Service Road
Solicitation # N4008527R9001
Solicitation N40085-27-R-9001 is a HUBZone set-aside project for the Wallace Creek Service Road Realignment (P1555U) at Marine Corps Base Camp Lejeune, North Carolina. This highway construction project, with an estimated value between 5 million and 10 million dollars and a completion period of 730 days, is restricted to Civil/Paving MACC Contractors. The scope of work includes realigning the service road, constructing a roundabout at McHugh Boulevard, relocating a parking lot, installing pedestrian sidewalks and lighting, and performing necessary utility work. The project also requires the demolition of Building 41 and the management of contaminant-impacted excavation spoils, specifically targeting PFAS, petroleum, metals, and SVOCs. The contract will be awarded based on the lowest price. Key requirements include the submission of an Accident Prevention Plan and Activity Hazard Analysis 15 working days prior to task commencement, and the hosting of a formal partnering session within 35 days of award. Bonding requirements for proposals over 150,000 dollars include bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. Contractors must comply with EM 385-1-1 safety standards, Buy American requirements, and specific DoD real property transfer procedures using DD Form 1354. Invoicing is managed electronically via Wide Area Work Flow (WAWF), with monthly submissions due within five calendar days of the invoice date.
Navfacsyscom Mid-Atlantic

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS