Invitation to Bid - City of Chandler Hamilton Street Reclaimed Water Transmission Main: Queen Creek Road to Ryan Road ; WW2206.403

Closed
BPM006530State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the installation of approximately 4,700 linear feet of 24-inch reclaimed waterline connecting existing waterlines on Queen Creek Road and Ryan Road on Hamilton Street, along with about 2,600 linear feet of 16-inch reclaimed waterline linking ASR Wells 11 and 12 to the Tumbleweed ASR Well Sand Separator System on Ryan Road and Hamilton Street. The project must be completed within 270 consecutive calendar days from the issuance of the Notice to Proceed, with an estimated project cost ranging between $8 million and $10 million. The work is overseen by the City of Chandler in Arizona, and the solicitation was posted on September 13, 2024, with a response deadline of October 10, 2024. The project falls under the NAICS code 336390 and is categorized as a solicitation for construction services. The primary point of contact for inquiries is Michelle Reeder, reachable via email at [email hidden] or by phone at [phone hidden]. The contract aims to enhance the city’s reclaimed water infrastructure, ensuring efficient water transmission between key locations for water reuse and system integration within the specified timeframe.

General Info

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

1

35747___Award___2166-AwardLetter.txt

TXT

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Mar 26, 2007 to Oct 10, 2024. The notice title changed. NAICS code changed from 334310 to 336390. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → City of Chandler
Contacts1 person available
OfficeN/A
Organization / AgencyArizona → City of Chandler
Office AddressN/A

Full Description

Show more
Work under this Agreement includes: Installation of approximately 4,700 linear feet of 24-inch reclaimed waterline connecting to the existing reclaimed waterlines on Queen Creek Road and Ryan Road on Hamilton Street, and approximately 2,600 linear feet of 16-inch reclaimed waterline connecting ASR Wells 11 and 12 with the Tumbleweed ASR Well Sand Separator System on Ryan Road and Hamilton Street. Work must be completed within 270 consecutive calendar days from the Notice to Proceed. The Engineer’s Estimate range is $8M- $10M.

More opportunities from Arizona → City of Chandler

Same awarding agency

NAICS: 238210
New
SLED
Invitation to Bid - City of Chandler Runway 4L-22R and Taxiway B Electrical Upgrade, Project No.: AI2602.401; FAA AIP No.: 3-04-0008-035-2026
Solicitation # BPM007852
The City of Chandler is soliciting bids for the Runway 4L-22R and Taxiway B Electrical Upgrade project (Project No. AI2602.401; FAA AIP No. 3-04-0008-035-2026). The scope of work involves replacing existing incandescent edge lighting and guidance signage with FAA-approved LED technology, replacing 5kV airfield lighting cables, and installing lower-rated constant current regulators in the Airfield Lighting Vault to reduce energy consumption. The project is divided into multiple phases, including electrical updates to Runway 4L-22R and various upgrades to Taxiways B, L, N, P, and Q, with significant portions of the work requiring night shifts. The estimated contract value ranges from 675,000 to 775,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder who possesses the required contracting licenses at the time of bidding. The total agreement duration is 120 calendar days, with substantial completion required by 90 days. Bidders must provide a bid bond of at least 10 percent of the total bid, and the successful contractor must furnish performance and payment bonds equal to 100 percent of the agreement price. Compliance with FAA federal provisions is mandatory, including Davis-Bacon wage requirements, Buy American preferences, and a race-neutral DBE goal of 3.30 percent. All work must adhere to FAA AC 150/5370-2G for operational safety and requires oversight by a Professional Engineer registered in Arizona. Bids are due by November 25, 2026.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS