IPT Enterprise Business Center LLC Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The IPT Enterprise Business Center LLC Project, managed by the City of Lake Forest under Site Development Permit 06-21-5437, involves the demolition of a 144,906-square-foot two-story office and industrial building at 26200 Enterprise Way. In its place, a new 35-foot tall, 165,803-square-foot tilt-up concrete industrial building will be constructed. This facility will feature a mix of office, manufacturing, and warehouse spaces, including up to 23 dock-high doors, a gated truck loading area, on-site parking, and landscaping. The project also requires off-site improvements at five city intersections. The project was approved by the Planning Commission on June 5, 2026, and subsequently upheld by the City Council on July 7, 2026, following the certification of a Final Environmental Impact Report and the adoption of a Mitigation Monitoring and Reporting Program. Strict operational conditions are in place, including a five-minute idling limit and specific commercial truck traffic caps of 15 trucks per hour from 7:00 a.m. to 10:00 p.m. and 4 trucks per hour from 10:00 p.m. to 7:00 a.m. Additionally, a quiet zone is established daily from 10:00 p.m. to 7:00 a.m. along the internal driveway adjacent to the Meadows, and commercial truck traffic is prohibited on the shared drive aisle leading to Bake Parkway.

General Info

City of Lake Forest approves replacing an office building with a new industrial facility.

Agency

California → City of Lake Forest

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Enterprise Way and Dimension Drive, Lake Forest, CA, 92630

Set-Aside

NONE

Documents

(3)

IPT_Final EIR_5

PDF

Notice of Determination for IPT Enterprise Business Center LLC Project

PDFnotice-of-determination

Notice of Determination for IPT Enterprise Business Center LLC Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Lake Forest
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Lake Forest
Office AddressN/A
Contacts
Amy StonichAssistant Director of Community Development
Chris SanfordManaging Director

Full Description

Show more
The proposed project involves the demolition of the existing 144,906-square-foot (sq ft), two-story tilt-up office/industrial building, and construction and operation of a new 35-foot tall, 165,803 sq ft, tilt-up concrete industrial building that would include a mix of office, manufacturing, and warehouse space, a maximum of 23 usable dock high doors, a gated truck loading area, on-site parking, landscaping, and off-site improvements at five intersections within the City. On June 5, 2026, the City of Lake Forest Planning Commission adopted environmental findings, adopted a Statement of Overriding Considerations, certified the Final EIR, adopted the Mitigation Monitoring and Reporting Program, approved Site Development Permit 06-21-5437, and approved the Project, subject to additional conditions of approval. These conditions included approval of sign plans for signs to be posted on-site; designation of the internal driveway adjacent to the Meadows as a quiet zone between 10:00 p.m. and 7:00 a.m., daily; prohibition of commercial truck traffic on the shared drive aisle at the north corner of the property that leads to Bake Parkway; installation of signage to restrict idling at the site to 5 minutes or less; and restrictions limiting commercial truck traffic to 15 trucks per hour between the hours of 7:00 a.m. to 10:00 p.m. and 4 trucks per hour between the hours of 10:00 p.m. and 7:00 a.m.. On June 18, 2026, a timely appeal of the Planning Commission’s decision was filed with the City of Lake Forest. Following a public hearing on July 7, 2026, the City Council upheld the Planning Commission's decisions, including adoption of environmental findings, adoption of a Statement of Overriding Considerations, certification of the Final EIR, adoption of the Mitigation Monitoring and Reporting Program, approval of Site Development Permit 06-21-5437, and approval of the Project.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
Leavenworth VA Decommissioning
Solicitation # 36C77026R0015
The Department of Veterans Affairs, NCO-15 CMOP division, is soliciting a construction contract for the decommissioning of the Leavenworth VA CMOP facility located at 5000 S 13th St, Leavenworth, KS. This project is a total set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) with an estimated construction magnitude between $500,000 and $1,000,000. The scope of work involves the disassembly, demolition, and disposal of Automated Prescription Fulfillment System (APFS) equipment, conveyors, and electrical systems, as well as general building repairs and the decommissioning of a central vacuum system. A key requirement includes providing 5,000 to 10,000 square feet of off-site storage near the Shawnee CMOP to facilitate federal equipment excessing procedures. The contract utilizes a Best Value Tradeoff source selection process, where non-price factors—including technical approach, construction experience, and staff qualifications—are significantly more important than price. The total performance period is 365 calendar days, though the government intends for the actual decommissioning to be completed within 60 days of the Notice to Proceed. Contractors must adhere to strict GSA guidelines for inventory and photography, as well as manufacturer standards for the packaging and palletization of electronic and robotic components to prevent damage. The response deadline is September 23, 2026, at 17:00 Central.
National Cmop Office (36C770)

POSTED

4 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS