Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 25, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Iron Creek Subdivision Road Realignment Project

Awarded
AG-0261-S-11-0062Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 8 hours ago

DEADLINE

in about 20 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 9 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Iron Creek Subdivision Road Realignment Project, managed by the Boise National Forest under the Department of Agriculture, involves the reconstruction and realignment of forest roads near Stanley, Idaho. The scope of work includes reconstructing a segment of Forest Road 70619 to address a limited strength area through the installation of an underdrain and reinforced embankment. Additionally, the project requires the construction of a 0.42-mile realigned segment of Forest Road 70692 and the installation of a new bridge at the Iron Creek Crossing. Key technical requirements encompass construction surveying, erosion control, excavation, aggregate placement, culvert installation, and asphalt paving. The estimated price range for the project is between 250,000 and 500,000 dollars, with a contract duration of 200 calendar days starting around August 15, 2011. This procurement was open for competition with a price evaluation preference for HUBZone Small Business Concerns.

General Info

Contract Value

$375,721.01

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

ID, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jul 19, 2011 to Aug 1, 2011. NAICS code changed from 237990 to 237310. Set-aside removed. The notice description changed. The point of contact changed.

Notice updated

Response deadline time changed from 9:00 PM UTC to 8:00 PM UTC on Aug 1, 2011. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 1, 2011 to Aug 5, 2011. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Boise National Forest
Contacts1 person available
OfficeBOISE, ID, 83709, USA
Office AddressBOISE, ID, 83709, USA
Contacts

Full Description

Show more
IRON CREEK SUBDIVISION ROAD REALIGNMENT PROJECT -- SAWTOOTH SNRA By 8 July 2011, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT WILL BE AVAILABLE TO VIEW AND PRINT. The intent of the contract is to furnish all labor, equipment and material, to accomplish the work under this contract. This project proposes to reconstruct a small segment of Forest Road 70619, to eliminate a limited strength area prior to any haul of materials with the installation of an underdrain & reinforced embankment, then to construct the realigned segment of Forest Road 70692 at an approximate length of 0.42 mile, also construct a new bridge at the Iron Creek Crossing on this realigned segment. The beginning of the new construction starts at approximately 0.10 mile from the junction of Forest Roads 70619 and 70692, with the new construction ending at the Iron Creek Subdivision. Work includes but is not limited to the following major items; construction survey & staking for both road & bridge, erosion prevention & control measures, clearing & grubbing, excavation & embankment construction, haul, aggregate placement, reinforced fill & underdrain construction, culvert installation, asphalt placement, bridge construction with structural backfill & approach railing. LOCATION AND DESCRIPTION From Stanley Idaho proceed west approximately 3 miles on Idaho State Road #21 to the junction with Forest Road 70619. Turn left onto Forest Road 70619; proceed to beginning of first project site on Forest Road 70619. The existing segment of the project on Forest Road 70619 which requires the installation of a reinforced embankment & underdrain, begins approximately at 0.20 to 0.25 mile from the junction of Forest Road 70619 and Idaho State Road #21. Exact Area of Work will be located & marked on the ground by both the Government & Contractor, then designated in Writing by the Contracting Officer prior to excavation. The relocated segment of the project on Forest Road 70692 begins approximately at 0.10 mile from the junction of Forest Roads 70619 and 70692, with the new construction ending at the Iron Creek Subdivision. CONTACT KEVIN DUCHOW (208) 737-3318 FOR MORE INFORMATION. ESTIMATED PRICE RANGE - Between $250,000 and $500,000 CONTRACT TIME WILL BE 200 calendar days with an estimated start date of Aug 15, 2011. NAICS Code: 237990 Size Standard: $33.5 This proposed procurement is full and open with 52.219-4 Notice of Price Evaluation Preference fro HUBZone Small Business Concerns.

More opportunities from Department Of Agriculture → Boise National Forest

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS