Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from General Services Administration was posted on February 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IRS Memphis, TN Design/Build Replacement of Roofs, Electrical Breakers and Fire Alarm System Construction Project

Closed
47PE0325R0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The United States General Services Administration (GSA) Public Buildings Service is soliciting proposals for a comprehensive design-build construction project involving the Internal Revenue Service (IRS) Customer Service Center campus in Memphis, Tennessee. The project scope includes the replacement and repair of roofing systems, refurbishing and replacing failing Westinghouse POW-R-100 electrical circuit breakers, and installing a new UL-certified fire alarm system throughout the facility. The roofing work entails the upgrade and replacement of thermal and moisture protection and drainage systems with built-up asphalt membranes, metal flashing, and rigid insulation supported by existing metal decking and steel structure. A 20-year, no-dollar-limit warranty covering wind damage up to 140 mph is required for all roofing work, alongside installation of a web-camera for on-site monitoring. Electrical work focuses on restoring breaker reliability by supplying new breakers and refurbishing spares with a one-year warranty on replacements. The fire alarm system replacement mandates the installation of a fully UL-certified system, with the involvement of a registered fire protection engineer throughout design and construction phases to ensure compliance with all relevant codes and standards. This firm fixed-price contract, estimated between $20 million and $25 million, requires the Design-Builder to furnish complete design documents, coordinate multidisciplinary systems, and submit detailed construction and demolition waste diversion plans. The procurement incorporates strict federal labor wage compliance under the Davis-Bacon Act, detailed in the applicable wage determination for Shelby County, Tennessee, including mandatory reporting and contracting ethics provisions. Evaluation will be based on a best-value trade-off, where non-price factors such as prior performance on similar projects, project management approach, and key personnel qualifications are collectively more important than cost alone. The project is governed by a comprehensive set of FAR and GSAR clauses addressing contract administration, security clearances (including HSPD-12 compliance for personnel access), safeguarding Controlled Unclassified Information, and strict invoicing and reporting requirements. The performance period extends from November 2024 to November 2026, with substantial completion required within 810 calendar days after the notice to proceed. Potential offerors have access to virtual and on-site pre-proposal meetings, with submission due by February 2, 2026, under a streamlined proposal format limited to 50 pages. The contract emphasizes rigorous quality control, documentation, inspections per NFPA, ASTM, and local codes, and coordination with government stakeholders to ensure the delivery of safe, compliant, and durable facility improvements.

General Info

Design-build roofing, electrical, fire alarm upgrades for IRS Memphis campus; $20-25M, 2-year completion.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Memphis, TN, 38117, USA

Set-Aside

NONE

Documents

15

Amendment 0001 to Solicitation 47PE0325R0007 IRS Memphis TN

PDF, High priority: read this first3 pages · amendment
High

Amendment 0002 to Solicitation 47PE0325R0007 IRS Memphis TN Roof Project

PDF, High priority: read this first3 pages · amendment
High

Amendment 0003 to Solicitation 47PE0325R0007 IRS Memphis TN Roofs Fire Alarm Breakers

PDF, High priority: read this first2 pages · amendment
High

Amendment 0004 to Solicitation 47PE0325R0007 for IRS Memphis Roofs Fire Alarm Breakers Project

PDF, High priority: read this firstamendment
High

Contractor Pricing Template Memphis IRS Service Center

XLSX, High priority: read this first2 pages · contractor-pricing-template
High

Design Build Contract DB101 for IRS Memphis Roofs, Fire Alarm, Breakers Project

PDF, High priority: read this first48 pages · contract-document
High

IFB 47PE0325R0007 Chattanooga TN Roofs Fire Alarm Breakers Replacement Project

PDF, High priority: read this firstifb
High

IRS Memphis TN Roofs, Fire Alarm, Breakers Design Build Solicitation DB201A SEPTEMBER 2025

PDF, High priority: read this first28 pages · rfp
High

Memphis IRS Design Build 2026 RFI Questions and Responses Log

PDF, High priority: read this first30 pages · rfi
High

Solicitation SF1442-47PE0325R0007 for Roofs and Fire System Circuits Construction Memphis TN

PDF, High priority: read this first3 pages · ifb
High

SOW for Memphis IRS Service Center Roof, Electrical Breaker & Fire Alarm Improvement

PDF, High priority: read this first49 pages · sow
High

Wage Determination TN20250200 for Memphis TN Roofs Fire Alarm Electrical

PDF, High priority: read this first8 pages · wage-determination
High

IRS Memphis Roof, Breaker and Fire Alarm Replacement Project Site Visit Sign-In Sheet Jan 06 2026

PDF, Low priorityspecial-notice
Low

IRS Memphis TN Roofs Fire Alarm and Electrical Breakers Past Performance Reference Questionnaire

PDF, Low priority4 pages · past-performance
Low

Past Performance Reference Questionnaire for GSA Solicitation 47PE0325R0007

PDF, Low priority4 pages · past-performance
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 2, 2026 to Feb 20, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 20, 2026 to Feb 27, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R4 (amd) Acquisition Management Division
Contacts2 people available
OfficeATLANTA, GA, 30303, USA

Full Description

Show more

*************************************************************************************************************************************************


AMENDMENT 0004 (02/17/2026)


Dear Industry Partners


GSA is issuing Amendment 0004 to the IRS Memphis, TN Design/Build Replacement of Roofs, Electrical Breakers and Fire Alarm System Construction Project Solicitation Number 47PE0325R0007.  This update will extedn the closing date to February 27, 2026.


*************************************************************************************************************************************************


AMENDMENT 0003 (02/02/2026)


Dear Industy Partners,


GSA is issuing Amendment 0003 to the IRS Memphis, TN Design/Build Replacement of Roofs, Electrical Breakers and Fire Alarm System Construction Project Solicitation Number 47PE0325R0007. This update will provide the GSA Response to Requests for Information (RFI) attached to this posting.


**********************************************************************************************************************************************


AMENDMENT 0002 (01/20/2026)


Dear Industry Partners,


GSA is issuing Amendment 0002 to the IRS Memphis, TN Design/Build Replacement of Roofs, Electrical Breakers and Fire Alarm System Construction Project Solicitation Number 47PE0325R0007.  This amendment will provide an update to the following information:


  1. GSA Responses to the Requests for Information (RFI) will be posted on February 02, 2026 on sam.gov and uploaded to the IRS Project Contractor’s Folder on google docs.
  2. Proposal due date will be changed from February 02, 2026 to February 20, 2026.

***********************************************************************************************************************************************


AMENDMENT 0001 (01/09/2026)


Dear Industry Partners,


GSA is issuing Amendment 0001 to the IRS Memphis, TN Design/Build Replacement of Roofs, Electrical Breakers and Fire Alarm System Construction Project Solicitation Number 47PE0325R0007.  This amendment will provide an update to the following information:


Past Performance Questionnaire
Cut-off date for RFI Questions
Site Visit Sign-in Sheet
MODS A-1 Breaker Westinghouse Systems POW-R Breaker Deficiencies from 2021


As-builts will need to be reviewed in person at the Memphis TN IRS Facility.
Contractors can come to see the plans on Tuesday Jan 13, 2026, between 9:00 and 12:00 CST. If this time does
not work, the contractor can reach out to Allen Turner, IRS, directly and schedule another time.


Allen K. Turner
Building Management Specialist
Memphis Campus
Desk: 901-707-4604
Allen.K.Turner@irs.gov


The cutoff date for RFI Questions is January 16, 2026.


MODS A-1 Breaker Westinghouse Systems POW-R Breaker Deficiencies from 2021 will be an attachment to the
amendment and will be found in the Contractors Folder. The Contractor Folder has to be viewed  using a GSA Affiliated Account. Email Joseph Ardoin or Dellice McElroy your GSA Affiliated Account Email Address for access.


*******************************************************************************************************


The United States General Services Administration (GSA) Public Buildings Service (PBS) announces an opportunity for a General Construction opportunity to perform repairs and installations of Roofs, Electrical Breakers and a New Fire Alarm System in the buildings on the Internal Revenue Service (IRS) Customer Service Center Campus located at 5391-5399 Getwell Road in Memphis, TN 38111.  The Project will utilize the Design/Build Project Delivery Method to replace roofs of certain buildings, identify repair/replace failing electrical breakers, and replace the existing Fire Alarm System.


PROJECT DESCRIPTION
A. Roof Cover Replacement and Improvement:
The project involves the design, repair, replacement, and improvement of thermal and moisture protection systems and rainwater drainage systems at roofs of the Internal Revenue Service Center in Memphis, Tennessee. The existing roof covers involve built-up asphalt membrane; bituminous base flashing; metal counterflashing and parapet copings; rigid insulation over metal decking; internal rain leaders and conductors; and associated materials and components. As-built drawings indicate that the metal deck and structural steel supports provide the roof slope.



The Design-Builder shall design and construct appropriate repairs, replacements, and improvements of roof cover and rainwater drainage systems to this facility. The Design-Builder shall confirm the quantity of roof area prior to submitting a proposal.
In addition, the project requires a web-camera surveillance system to monitor on-site roof work through project completion.
The Design-Builder shall also provide a twenty-year (20-year), no-dollar-limit (NDL) warranty on all areas of roof replacement. The warranties shall include wind riders to cover damage caused by winds speeds up to one-hundred forty (140) miles per hour or up to the design wind speed for the project location, whichever is less.



B. Breaker Repairs:
During PM inspection and testing of Westinghouse POW-R-100 circuit breakers in the Memphis IRS, twenty-six (26) circuit breakers failed. It is the intention of the Project Team to correct these issues and ensure the IRS has an adequate supply of functional breakers as spares.



The Design-Builder shall purchase and provide breakers as listed in the SOW. Once the purchased breakers arrive and the spare breakers requiring refurbishment are returned, the IRS will have enough spare breakers to allow one switchboard’s breakers to be replaced on a weekend. The breakers will then have to be sent out to be refurbished. Once the refurbished breakers are returned, the next switchboard breakers can be completed.
The Design-Builder shall provide a one-year (1-year) warranty on all replaced breakers, including all parts and labor.



C. Fire Alarm System Replacement:
The project also includes replacement of the fire alarm system, including but not limited to all fire alarm control panels, initiating devices, notification devices, wiring, control modules, monitor modules, NAC panels, tamper switches, flow switches, etc. within the Memphis IRS Service Center Complex. The new Fire Alarm system shall be UL Certified; thus, the installing contractor shall be UL certified. The Design-Builder shall provide UL Certification to GSA upon completion of the project.
The Design-Builder’s registered Fire Protection Engineer (FPE) is required to be a full participant in the Project Delivery Team throughout the Design and Construction Stages of the project and should be thoroughly familiar with current Core Building Standards.


D. Common Requirements:
This project requires construction and demolition (C&D) waste diversion plans, waste diversion monthly reports, and related documentation.  The Design-Builder is responsible for assessing all visible existing conditions that may impact pricing prior to submission of a proposal.


The estimated magnitude of construction is between $ $20M - $25M. 


Bonding Requirement:  $30 Million


A Virtual Preproposal Conference will be held on December 9, 2025.


Time:  11:00 a.m. Eastern Standard Time (EST)


Location:  Virtual Google Meet:   meet.google.com/vxt-tgyg-may


A Site visit is will be held on Jan 06, 2025.


Time:  11:00 a.m Eastern Standard Time (EST)


Location:  5391 Getwell Road, Memphis, TN 38111 


The Government will award a contract resulting from this Solicitation to the responsible Offeror whose offer conforming to the Solicitation will be the best value to the Government, Total Evaluated Price and other factors considered. In addition to Total Evaluated Price, the following non-price factors shall be used to evaluate offers:


1.  Factor 1 - Prior Experience & Past Performance on Similar Projects


2.  Factor 2 - Project Management Approach


3.  Factor 3 - Qualifications and Experience of Key Personal


Non-Price Factors are considered approximately equal in importance to each other,
when combined, are significantly more important than cost or Total Evaluated Price.


Estimated award date: March 2026



Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS