Irwindale Gateway Specific Plan Draft EIR

Forecast
2023020290State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the approval and construction of a 400-megawatt battery energy storage system (BESS) on 15.94 acres located at 13620 Live Oak Lane in Irwindale, California, within the boundaries of the previously approved Irwindale Gateway Specific Plan. The development includes an on-site 1,200-square-foot operations and maintenance building, a collector substation, an overhead electrical tie-line, and a 130-foot Point of Change of Ownership pole to facilitate grid connection. All entitlements required for the project—Development Agreement No. 01-2025, Site Plan and Design Review No. 03-2025, and Zone Variance No. 01-2025—are conditioned upon full consistency with the certified Environmental Impact Report (SCH#2023020290), which serves as the governing environmental compliance standard under the California Environmental Quality Act. The city of Irwindale acts as the lead agency responsible for oversight, approvals, and final acceptance, with the project site designated as the exclusive place of performance. The applicant, San Gabriel Project I-IV LLC, is responsible for executing the project in accordance with all CEQA-mandated mitigation measures and planning requirements, though no federal contract clauses, pricing data, or procurement-specific terms are included in the documentation. The project timeline centers around environmental determinations made in December 2025, with no defined performance period or delivery schedule articulated. While the NAICS code 541620 is referenced, no federal acquisition regulations, contract types, payment instructions, inspection criteria beyond CEQA, or socioeconomic certifications are applicable or included. All submission processes and approvals are administered locally through the City of Irwindale’s planning and development channels, with public documentation accessible via the state’s CEQA portal and the city’s official website.

General Info

400-megawatt BESS constructed in Irwindale, CA, under local approvals and CEQA compliance.

Place of Performance

Live Oak Lane Live Oak Avenue, Irwindale, CA, 91706

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Irwindale
Contacts1 person available
OfficeN/A

Full Description

Show more
Request to approve a 400-megawatt (MW) battery energy storage system (BESS) on 15.94 acres located at 13620 Live Oak Lane in the previously approved Irwindale Gateway Specific Plan (IGSP). The request also includes the construction of 1,200 square foot operations and maintenance building, on-site collector substation, overhead electrical tie-line, and a 130’-0” Point of Change of Ownership (POCO) pole for property located at 13620 Live Oak Lane and finding all entitlements consistent with the certified Environmental Impact Report (SCH#2023020290). Development Agreement No. 01-2025, Site Plan and Design Review (DA) No. 03-2025, Zone Variance No. 01-2025.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 17 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California → City of Irwindale

Same awarding agency

NAICS: 237210
SLED
Irwindale Brew Yard Specific PlanThe Irwindale Brew Yard Specific Plan is a regulatory development project by the City of Irwindale, California, aimed at transforming approximately 150.1 acres of land, including former sand and gravel quarries, into a mixed-use industrial and commercial hub. The project is divided into two primary planning areas: Planning Area 1, which allows for up to 3,000,000 square feet of industrial and business park uses, and Planning Area 2, which permits 12,000 square feet of commercial uses. The development includes the construction of buildings, loading docks, parking facilities, and associated infrastructure, with a phased build-out timeline extending from 2027 to 2031. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Draft Environmental Impact Report identifying impacts on air quality, greenhouse gas emissions, and transportation. Technical assessments have addressed health risks, noise monitoring, geotechnical hazards, and biological resources, while confirming that mining on the site is economically infeasible. Infrastructure planning includes a preliminary hydrology and low impact development plan, a sanitary sewer capacity study, and a water supply assessment confirming reliability through the City of Azusa. The plan also incorporates strict adherence to ADA compliance, tribal consultation requirements under AB52 and SB18, and fire safety standards mandated by the Los Angeles County Fire Department.
Land Subdivision

POSTED

3 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS