This Solicitation opportunity from Florida was posted on May 10, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ITB-24-25 Re-Bid: Lift Station #119 Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Winter Haven is inviting bids from qualified contractors to undertake a project involving the construction of a new sanitary sewer lift station and the demolition of the existing LS 119, including its control system. The new lift station will be situated on a vacant lot adjacent to the current location, which is now in the middle of the road, and will feature a duplex system with two 12 HP pumps, an 8-foot diameter concrete wet well with 8-inch wall thickness, and a depth of 15 feet from the well invert to the top of the station. The scope includes installing a new 6-inch force main connecting to the existing force main, along with gate valves, check valves, fittings, water service, an 8-inch gravity sewer main, an emergency bypass pump, and associated control and telemetry systems. Due to lake levels and ground elevation, retaining walls will be constructed on the north and east sides of the station, and the project also involves tree removal and the planting of “Florida friendly” landscaping outside the lift station limits. The solicitation, titled ITB-24-25 Re-Bid: Lift Station #119 Improvements, was posted on May 10, 2024, with a response deadline of June 18, 2024. The project is estimated to cost between $500,000 and $1,500,000. The primary point of contact is Bethany Owen, reachable via email at [email hidden] or by phone at [phone hidden]. The project is managed under NAICS code 561730, and interested contractors can find additional details and submit their responses through the provided online link.
General Info
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The project consists of construction of a sanitary sewer lift station and demolition of the existing LS 119, including control system. The new lift station will be located on a vacant lot on Lake Mirror adjacent to the existing lift station location that is now in the middle of the road. The new lift station will be a duplex with (2), -12 HP pumps system, 8 foot inside diameter concrete wet well with 8” wall thickness, and 15 feet deep - from well invert to top of lift station. The work also includes construction of a new 6” force main, connecting to existing 6” force main, gate valves, check valves and fittings, water service, new 8” gravity sewer main and emergency by-pass pump, Control Panel, Telemetry and Data Flow. Included in the project is a retaining wall on the North and East side of the Lift Station due to lake levels and ground elevation. The project will include determined tree removals, and the installation of “Florida friendly” landscaping covering the overall parcel outside of lift station limits.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
