This Solicitation opportunity from Virginia was posted on February 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Big Bethel Blueway - Contractor Bid Tabulation Sheet: A Contractor Bid Tabulation Sheet for the Big Bethel Blueway project, provided as Addendum 4-Attachment 4. The document contains a detailed bid schedule with 64 line items, including mobilization, demolition, storm sewer pipe installation, retaining walls, boardwalks, and landscaping, requiring unit and total pricing from the contractor.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Big Bethel Blueway - Drawings (Addendum 4-Attachment 2): Technical drawings and notes for the Big Bethel Blueway project, provided as Attachment 2 to Addendum 4. The document includes grading requirements, stabilization standards for slopes, and a legend for site features such as contours, utilities, and shoreline riprap.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for Big Bethel Blueway Resilience Infrastructure Project - Addendum 4: Addendum 4 for the Big Bethel Blueway Resilience Infrastructure Project. This document provides responses to bidder questions, replaces multiple construction drawings (dated 2/9/24), updates technical specification section 01 27 00, adds a special provision for Project Identification Signs, and provides a revised Bid Form with updated quantities for Geotextile Fabric and Rip Rap Outlet Protection, as well as a new bid item for the project sign.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Big Bethel Blueway - Section 01 27 00 Measurement and Payment: Technical specifications for Section 01 27 00 (Measurement and Payment) for the Big Bethel Blueway project. The document defines the scope of work, rules for payment based on plan quantities, and detailed measurement and payment criteria for specific pay items including mobilization, construction surveying, erosion and sediment control, and various demolition activities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-31TM Addendum 3 Attachment 1 - Measurement and Payment: This document is a technical specification section (01 27 00) regarding Measurement and Payment for ITB 24-31TM. It defines the scope of work, rules for payment based on plan quantities, and detailed measurement and payment criteria for specific pay items, including mobilization, construction surveying, erosion and sediment control, and various demolition activities.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB 24-31TM Addendum No 1 - Big Bethel Blueway Project: Addendum No 1 issued on January 2, 2024, for ITB 24-31TM (Big Bethel Blueway Project). This document provides the required bid form and project drawings to be submitted with responses by the February 22, 2024, deadline.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB 24-31TM Big Bethel Blue Way - Addendum No 2: Addendum No. 2 issued on January 17, 2024, for ITB 24-31TM (Big Bethel Blue Way). The purpose of this amendment is to extend the question and answer period deadline to January 31, 2024. Bidders are required to acknowledge this addendum for their bid to be considered.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB 24-31TM Big Bethel Blueway - Addendum No 3: Issued January 29, 2024, by the City of Hampton, this addendum provides updated technical, measurement, and payment specifications for the Big Bethel Blueway project (ITB 24-31TM). It includes attachments regarding Measurement & Payment and Timber Piles. Bidders must acknowledge this addendum for their bid to be considered.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB 24-31TM Big Bethel Blueway - Addendum No 4: Issued February 12, 2024, by the City of Hampton, this addendum provides formal responses to 20 bidder questions regarding ITB 24-31TM for the Big Bethel Blueway. Key clarifications include payment items for erosion and sediment control, railing diameters, rip rap protection for control structures, tree removal guidelines, and corrections to pipe bedding and asphalt measurement units.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for ITB 24-31TM Big Bethel Blueway Bid Form: Contractor Bid Tabulation Sheet for the Big Bethel Blueway project (ITB 24-31TM). The document contains a detailed bid schedule with 63 line items, including mobilization, demolition, storm sewer installation, retaining walls, boardwalks, and landscaping, requiring unit and total pricing from the bidder.
PDF
PDF, High priority: read this firstitb
HighAI Summary for ITB 24-31TM - Big Bethel Blueway Construction: Invitation to Bid (ITB #24-31TM) issued by the City of Hampton, VA, on December 26, 2023. The city is seeking qualified bidders for construction modifications to the existing drainage canal at Big Bethel, including the installation of water quality control structures and storage capacity improvements. Bids are due by February 22, 2024, at 2:00 p.m. EST. The document outlines bid submission terms, bidder qualifications, insurance requirements, and bonding specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-31TM Big Bethel Blueway Drawings: Technical drawings and specifications for the Big Bethel Blueway project, provided as Attachment 2 to Addendum 1 of ITB 24-31TM. The document includes site notes, legends for existing and proposed contours, utility lines, and grading/drainage requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-31TM Big Bethel Blueway Resilience Infrastructure Project Specifications: Supplemental specifications dated 10/27/2023 for the Big Bethel Blueway Resilience Infrastructure Project in Hampton, VA. The project involves construction modifications to a drainage canal to increase storage capacity, including grading, slope stabilization, retaining walls, stormwater pipe installation, and asphalt trail construction. The document outlines the summary of work, project location, reference standards (VDOT, MUTCD), and the authority of the Construction Engineer and Inspectors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB 24-31TM Section 31 62 19 - Timber Piles: Technical specifications for the furnishing and installation of Southern Yellow Pine timber bearing piles for a walkway. The document details material standards (ASTM D 25, AWPA), submittal requirements for driving equipment, quality assurance, installation procedures, and pile driving record requirements.
The City of Hampton is seeking bids from qualified bidders to provide construction modifications to the exicting drainage cama; at Bog Bethel. Project to install water quality control structures and other improvements to increase storage capacity in the channel. The project is located along the drainage canal beginning at the intersection of Big Bethel and Albany Drive and contining South until the canal intersects with Newmarket Creek.
More opportunities from Virginia → City of Hampton