This Solicitation opportunity from Georgia was posted on January 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ITB 25-005 Community Road Area Sewer Extension
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the construction of water and sewer extension infrastructure along Community Road and adjacent streets in Glynn County and the City of Brunswick, Georgia. Bidders are invited to submit sealed bids by February 11, 2025, with the project scheduled for completion upon award. The scope includes installing a low-pressure grinder pump system, 2-inch and 3-inch force mains, and an 8-inch watermain using open-cut and horizontal directional drilling methods. The work encompasses all necessary site preparation, demolition, soil disposal, and installation of appurtenances such as valves, hydrants, fittings, and gaskets, ensuring the systems are fully operational and compliant with permit requirements. Additionally, the project entails traffic management, site restoration, soil erosion control, and comprehensive testing, documentation, and record-keeping. The total project value is estimated between two to five million dollars, and the contract emphasizes thorough coordination of all construction activities, environmental safeguards, and adherence to all applicable regulations. The designated point of contact for inquiries is Christa Free at the BGJWSC.
General Info
Place of Performance
GA, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
SCOPE OF WORK The work to be performed under this contract consists of furnishing all skill, labor, materials (unless noted otherwise), tools, equipment and incidentals required to construct complete, in place, and ready to operate sanitary sewer and water distribution systems in Glynn County and the City of Brunswick, Georgia. More specifically, the work includes, but is not limited to:
Installation of a low-pressure grinder pump 2-inch and 3-inch force main system and an 8-inch watermain along Community Road and surrounding side streets as indicated in the plans. The force main and watermain will be installed by open-cut and horizontal directional drilling method. Force main laterals will be stubbed out at the property lines of each lot along the route. Existing water meters will be field located by contractor and connected to with new laterals from proposed 8-inch watermain.
All associated mobilization/demobilization, demolition, tree removal, proper disposal of drilling mud and other fluids and materials, required staging and work areas, removal, disposal and replacement of unsuitable soils, dewatering, all joint materials, fittings, valves, hydrants, gaskets, adapters, and coatings, all testing, soil erosion and sedimentation control, maintenance of traffic (vehicular, pedestrian, and bicycle), complete project area restoration, adherence to all permit requirements including sampling and monitoring, project photographs and videos, as-builts and record documents, and all other work and appurtenances shown on the Construction Drawings and indicated or implied in
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
