Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on October 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ITB 25-009 - Harber Valley Drive Pipe Replacement and Oakcliff Catch Basins Restoration

Closed
PE-64452-NONST-2026-000000031State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332439
New
DIBBS
SHIM
Solicitation # SPE4A7-27-T-2346
Solicitation SPE4A7-27-T-2346 is a procurement request by the Defense Logistics Agency (DLA) for 1,054 units of SHIM (NSN 5365-01-040-5274). The items must be manufactured in accordance with specific technical drawings, including Drawing 19200 12579607 Revision C, Drawing 19207 10934603 Revision C, and Drawing 19207 10934603-5 Revision D, as well as Quality Assurance Provision (QAP) 13873. The contract specifies that additive manufacturing is not authorized without prior approval. Delivery is set for 171 days after award, with an original required delivery date of March 27, 2027, and a need ship date of April 27, 2027. The shipping terms are FOB Origin, with the final destination being Arizona Industries for the Blind in Phoenix, Arizona. Quality and compliance requirements are stringent, requiring the manufacturer's inspection system to comply with SAE AS9003 or ISO 9001. Inspection and acceptance will occur at the origin, utilizing sampling methods such as MIL-STD-1916 or ASQ H1331. Packaging must adhere to MIL-STD-2073-1E and specific drawing requirements, while marking must comply with MIL-STD-129. The contract incorporates several federal regulations, including the Buy American Act, the Berry Amendment, and DFARS cybersecurity standards for safeguarding covered defense information. Invoicing and payment are to be processed electronically via the Wide Area WorkFlow (WAWF) system. Quotations for this requirement were due by November 6, 2026.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 2 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The City of Doraville is seeking sealed bids from qualified contractors for a comprehensive infrastructure improvement project involving the replacement of a corrugated metal pipe with reinforced concrete at Harber Valley Drive and the restoration of catch basins at Oakcliff. The scope includes removing and replacing existing pipes, constructing a junction box and outfall, resetting curbing, patching roads, and replacing catch basin tops and throats as specified in the project documents. Contractors are expected to coordinate with the City to navigate around existing utilities and obstacles, ensuring minimal disruption during construction. The project is scheduled for a 60-day performance period following a notice to proceed, with a bid deadline set for October 29, 2025, and a mandatory pre-bid meeting on October 15, 2025. The bidding process is detailed in the Invitation to Bid documents, which specify submission requirements, evaluation criteria, and the City’s rights to reject or award bids based on its best interests. The technical aspects are supported by preliminary construction drawings prepared by Keck & Wood, Inc., providing essential site, utility, erosion control, and demolition details necessary for planning and estimating. The contract includes standard provisions covering performance, pricing, indemnification, termination, non-discrimination, and legal governance, ensuring clarity and compliance throughout the project duration. The overall effort aims to improve stormwater management infrastructure, enhance roadway conditions, and ensure the durability and safety of the affected areas within Doraville.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

2

Invitation to Bid for Harber Valley Drive Pipe Replacement and Oakcliff Catch Basin Restoration

PDF, High priority: read this first57 pages · ifb
High

Preliminary Construction Drawings for Pipe Replacement at 2681 Harber Valley Dr, Doraville, GA

PDF, High priority: read this first11 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 64452 DORAVILLE, PE-64452-NONST-2026-000000031 to PE-64452-NONST-2026-000000031.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Doraville
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Doraville
Office AddressN/A
Contacts

Full Description

Show more
The City of Doraville is soliciting competitively sealed bids from qualified contractors for the Harber Valley Drive Pipe Replacement and Oakcliff Catch Basin Restorations Project. The scope of work includes the removal and replacement of an existing corrugated metal pipe with reinforced concrete pipe, creation of a junction box and outfall, removal and reset of curbing, road patching, and the removal and replacement of existing catch basin tops and throats, with the locations and quantities listed in Exhibit J. The contractor will work with the City to avoid or build around conflicts such as utility poles, mailboxes, etc.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS