This Solicitation opportunity from Florida was posted on January 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ITB 25-021 Crystal River Airport (CGC) Fuel Farm Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Citrus County, Florida, is seeking bids for a comprehensive project at the Crystal River airport to remove, replace, and install two 12,000-gallon aviation fuel tanks along with associated infrastructure. The scope includes the removal of existing tanks, installation of new tanks, sump recovery tanks, pumps, filters, piping (both relocating existing and installing new), hoses, reels, coatings, painting, concrete sealing and repairs, electrical systems including lighting, Emergency Fuel Shut-Off (EFSO), and the Scully system. Additionally, the project encompasses constructing a galvanized steel catwalk, installing an electrical generator system with transfer switch and enlarged platform, utility racks with lighting controls, remote fueling cabinet, card reader, asphalt patching, and other incidental work necessary for completion. All work must conform to the provided construction drawings, specifications, and contract documents, with the successful bidder responsible for obtaining all necessary permits and complying with applicable federal, state, and local laws, including FAA regulations. The project has a contract value estimated between $500,000 and $1,500,000, with a response deadline of February 6, 2025. Interested parties can contact Linda Morse at Citrus County for further details and access the bid documents through the specified vendor link.
General Info
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
All Work shall be in accordance with the construction drawings, specifications, and Contract Documents.
The Successful Bidder shall adhere to all permit(s) requirements, and all Federal/FAA, State, and Local Laws/Rules/Codes as applicable to this Project. The Successful Bidder will be responsible for all Permitting.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
