This Award Notice opportunity from Texas was posted on October 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Harris County Precinct 1 has awarded contract 25/0320 to ARS Construction LLC for the construction of 6-foot-wide concrete sidewalks in the Cypress Station Area. The contract is valued at 1,571,590 dollars and is coordinated through the Office of the County Engineer. The project requires strict adherence to technical drawings and specifications, including ADA compliance for wheelchair passing spaces and specific pavement thickness standards. The project duration is established at 150 days, with performance and payment bonds required from the contractor.
The agreement mandates a 31.64 percent Minority- and Woman-Owned Business Enterprise participation goal and requires compliance with the Harris County Contractor Minimum Wage Policy, which sets a wage floor of 21.65 dollars per hour for eligible workers. Safety is a primary focus, with mandatory heat protection plans for temperatures exceeding 90 degrees and a rigorous safety record evaluation for contractors. Additionally, the contractor must maintain comprehensive insurance coverage, including Workers Compensation and Contractor Pollution Liability, and adhere to Texas Government Code prevailing wage rates for road and bridge construction.
General Info
ARS Construction will build Cypress Station sidewalks for $1,571,590 over 150 days.
HighAI Summary for Addendum No. 1 - Harris County Contractor Safety Record Policy: This document is Addendum No. 1, detailing the Harris County Contractor Safety Record Policy. It establishes requirements for evaluating the safety records of prime contractors and subcontractors for contracts valued at $500,000 or more (and subcontracts of $50,000 or more) procured under Texas Government Code Chapter 2269. The policy mandates a certification process via a Safety Record Questionnaire, focusing on OSHA Severe Violator Enforcement Program (SVEP) status, specific OSHA citation types, and criminal convictions related to workplace incidents.
PDF
PDF, High priority: read this first1 page · bid-guaranty
HighAI Summary for Bid Guaranty and Performance Bond Requirements - Harris County: This document outlines the bid guaranty and performance/payment bond requirements for bidders to Harris County. It specifies that a guaranty must be submitted with each bid, either as a bid bond or a bank cashier's check for 5% of the bid amount. The successful bidder must furnish a performance/payment bond within ten days after contract award, executed by an authorized surety company. Failure to submit the required bonds and documents within the timeframe may render the award ineffective. The document also details the conditions under which the County may hold the cashier's check and the necessity of written verification from the surety before payments are made.
PDF
PDF, High priority: read this first13 pages · ifb
HighAI Summary for City of Wichita Redbud Multi-Use Path Construction IFB 87N-0794-01: This document is an Invitation for Bids (IFB) for the construction of the Redbud Multi-Use Path from Woodlawn to K-96 (Phase 1) in Wichita, Kansas. It specifies the bid submission deadline as November 14, 2025, and details the bid bond requirement of 5%. The document includes instructions for bidder registration, contact information for questions, and references the City of Wichita Standard Specifications. Key provisions include a pre-bid conference on November 3, 2025, a start date no later than February 2, 2026, and a completion timeline of 250 working days with liquidated damages of $1,000 per day. Additional project-specific special provisions and quantity adjustments are outlined. This is a state/federal aid contract.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Harris County Contractor Minimum Wage Policy: This document outlines the Harris County Minimum Wage Policy for Contract Workers, establishing a wage floor of $21.65 per hour (adjusted annually via the MIT Living Wage Calculator) for eligible contracts solicited on or after July 1, 2025. It defines applicable contractors, staff, and services, while listing specific exemptions such as emergency contracts, sole source agreements, and contracts valued under $50,000 per year.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County DEEO M/WBE Trucking Procedure Compliance: Guidelines from the Harris County Department of Economic Equity and Opportunity (DEEO) regarding Commercially Useful Function (CUF) for M/WBE trucking. It outlines ownership, operation, and leasing requirements to receive contract goal credit, as well as required submittal documentation and courtesy review processes for Utilization Plans.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County Engineering Department Policy for Payment of Material on Hand: Dated December 6, 2005, this document outlines the policy and procedures for contractors to request payment for nonperishable materials on hand for Harris County projects. It defines eligible materials, minimum invoice requirements ($1,000), payment limits, and audit rights, and includes the required Request for Payment of Material on Hand Summary form.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County General Conditions for Building Construction and Related Work: General Conditions document dated August 4, 2025, for Harris County building construction, roads, bridges, and related work. It establishes the legal and operational framework for contracts, including definitions, payment terms, schedule requirements, change orders, warranties, and dispute resolution.
PDF
PDF, High priority: read this first6 pages · rfb
HighAI Summary for Harris County General Requirements for Bids: This document outlines the general requirements for bids submitted to Harris County, Texas. It includes instructions for bid submission, access to records, payment methods, addenda, assignment restrictions, award criteria, bid completion and return procedures, bond requirements, and certification obligations. The document emphasizes compliance with federal, state, and local laws, ethical business conduct, and specific Texas statutes related to contracting. It also details vendor responsibilities such as record keeping, color selection for materials, and certification regarding debarment and suspension. The document is intended to guide vendors in preparing and submitting bids in accordance with Harris County policies and legal requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County Minimum Insurance Requirements: This document outlines the minimum insurance requirements for contractors performing work for Harris County. It specifies mandatory coverage limits and ISO form requirements for Workers' Compensation, Commercial General Liability, Business Automobile Liability, and Contractor's Pollution Liability insurance, including detailed endorsement and exclusion rules.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County M/WBE Goal Participation Requirements: This document outlines the Minority- and Woman-Owned Business Enterprise (M/WBE) participation goals and requirements for a Harris County procurement. It establishes a 31.64% participation goal, details the required M/WBE Utilization Plan and Commitment Form, lists accepted certifications, and defines the criteria for 'Significant Local Presence' and 'Commercially Useful Function' to ensure valid goal credit.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Harris County Road and Bridge Construction Prevailing Wage Rates Q4 2025: This document outlines the prevailing wage rate instructions and specific hourly rates for Road and Bridge Construction in Harris County for Quarter 4 of 2025. It includes payroll submittal requirements via DEEO software, compliance mandates, penalties under Texas Government Code Chapter 2258, and a detailed schedule of hourly rates for various worker classifications (e.g., Asphalt Operators, Electricians, Laborers).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Heat Protection Safety Requirement: This document outlines the safety requirements for protecting workers from extreme weather conditions, specifically focusing on heat-related illnesses. It mandates that the project Safety Plan include provisions for water, rest, shade, and acclimatization when temperatures exceed 90 degrees, and notes that vendors agree to these terms by signing the Bid Acknowledgement.
PDF
PDF, High priority: read this first2 pages · rfb
HighAI Summary for Heat Protection Safety Requirement Bid - Texas Workers' Compensation Compliance: This document outlines mandatory Texas Workers' Compensation Law requirements for contractors and subcontractors involved in a building or construction project. It defines key terms such as certificate of coverage and duration of the project, and details the obligations of contractors to provide and maintain workers' compensation coverage for all employees providing services on the project. The document specifies the need for certificates of coverage before contract award, during the project, and retention of these certificates for one year after project completion. It also mandates posting notices on project sites and requires contractors to ensure compliance through their subcontractors. Non-compliance is considered a breach of contract with potential penalties. This bid document is essential for ensuring legal and safety compliance in construction contracts in Texas.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Job No. 25/0320 Addendum No. 1 - Construction of Sidewalks for Cypress Station Area: Addendum No. 1 issued on October 30, 2025, for Job No. 25/0320 regarding the Construction of Sidewalks for Cypress Station Area (2023) for Harris County Precinct 1. The document provides a Q&A section clarifying curb foundation dimensions, confirming a project duration of 150 days, and directing vendors to the General Conditions for liquidated damages information. Bids are due by November 03, 2025.
PDF
PDF, High priority: read this firstaward
HighAI Summary for Job No 250320 - Sidewalk Cypress Station Area (ARS Construction LLC): Award document for Job No 250320 regarding the construction of 6-foot-wide concrete sidewalks in the Cypress Station Area for Harris County Precinct 1 (UPIN 24101MF35S01). The document includes the Scope of Work, general notices to contractors regarding House Bill 1059, e-Builder requirements, and a policy advisory from the Texas Board of Professional Engineers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Redbud Soil Management Guide: Technical guidance document detailing soil management, cleanup goals, and disposal criteria for the Red Bud Path project. It defines contaminant thresholds (Residential and Non-Residential RSKs), RCRA hazardous waste characterization via TCLP limits, and specific handling instructions for contaminated media, including reuse as subgrade fill or disposal at approved facilities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sidewalk - Cypress Station Area - 2023 (Harris County Engineering): Technical drawings and specifications for the 2023 Sidewalk project in the Cypress Station Area for Harris County, Texas. The document includes pavement thickness tables, general construction notes regarding concrete and reinforcing steel, ADA compliance requirements for wheelchair passing spaces, and a list of project road logs and abbreviations. Dated July 2025.
PDF
PDF, High priority: read this first3 pages · rfp
HighAI Summary for Solicitation 250316 Redbud Multi-Use Path Bid Table: This document is a solicitation numbered 250316 for the Redbud Multi-Use Path project from Woodlawn to K-96 (Phase 1). It includes a detailed bid table listing lump sum and measured quantity bid items for paving, drainage, landscaping, erosion control, and traffic work. The document provides quantities, unit measures, and descriptions for each bid item. Contact information for the procurement officer is included, and responses are due by November 14, 2025, at 10:00 AM. The solicitation requests delivered prices for equipment, materials, or services related to the project.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for UPIN 24101MF35S01 - Construction of Sidewalks for Cypress Station Area (2023): Solicitation for the construction of sidewalks for Cypress Station Area (2023) for Harris County Precinct 1. The document outlines the scope of work, pre-bid conference details (October 21, 2025), submission requirements via Bonfire, and compliance mandates including Form 1295, Texas Government Code prevailing wage rates, and performance/payment bond requirements. It specifies that the project is coordinated through the Office of the County Engineer.
PDF
PDF, Low priorityother
LowAI Summary for 25/0320 - Pre-Bid Conference Sign-in Sheet: Cypress Station Area Sidewalks: Sign-in sheet for a voluntary virtual pre-bid conference held on October 21, 2025, regarding the construction of sidewalks for the Cypress Station Area (2023) for Harris County Precinct 1. The document lists attendees from Harris County departments and private contractors.
PDF
PDF, Low priority1 page · bid-acknowledgement
LowAI Summary for Bid Acknowledgement for IFB Submission: This document is a Bid Acknowledgement form related to an Invitation for Bid (IFB). It certifies that the bid is submitted without collusion or fraud and that the signer is authorized to submit the bid on behalf of the bidder. The form requires details such as project job number, project description, authorized signature, representative name, company information, and contact details. It also includes a section for internal acceptance by Harris County Judge Lina Hidalgo. The document ensures compliance with the IFB conditions and confirms the accuracy of the pricing and statements made in the bid.
PDF
PDF, Low priority1 page · other
LowAI Summary for Bid Bond and Bid Check Authorization Form: This document is the Bid Bond Confirmation and Bid Check Return Authorization Form for Harris County. It outlines the procedures for submitting a cashier's check in lieu of a bid bond through Bonfire, including physical drop-off instructions and requirements for the bid check amount and payee. The form includes sections for bid bond and cashier's check details, as well as bidder contact information. It also explains the conditions under which bid checks are retained or returned by the County Clerk or Office of the Purchasing Agent. The form authorizes Harris County to return bid checks via regular mail under specified conditions. The document is intended for use by bidders and county officials managing bid check processing.
PDF
PDF, Low priority1 page · other
LowAI Summary for Harris County Minimum Wage Policy and Certification: This document is a tax form and residence certification for advertised projects in Harris County, Texas. It includes sections for taxpayer identification, company information, property listings, debt status to Harris County, and residence certification pursuant to Texas Government Code §2252.001. The form distinguishes between resident and nonresident bidders based on their principal place of business. It is intended to certify compliance with county and state requirements related to business operations and contracting eligibility.
PDF
PDF, Low priorityother
LowAI Summary for Harris County M/WBE Utilization Commitment and Plan: This document consists of the Minority- and Woman-Owned Business Enterprise (M/WBE) Utilization Commitment Form and the M/WBE Utilization Plan for Harris County. It provides the necessary forms for bidders to certify their commitment to M/WBE goals, document their utilization plans, and list certified subcontractors, including required certifications and NAICS/NIGP codes.
PDF
PDF, Low priorityaward
LowAI Summary for Job No. 250320 - ARS Construction LLC Award: Award recommendation dated December 17, 2025, from the Harris County Purchasing Agent to the Commissioners Court. The document requests approval to award the contract for the construction of sidewalks for the Cypress Station Area (2023) for Precinct 1 to ARS Construction LLC in the amount of $1,571,590 based on the low bid.
PDF
PDF, Low priority63 pages · other
LowAI Summary for Project No. 87N-0794-01/472-2023-085888 KDOT Required Contract Provisions: This document contains required contract provisions for Project No. 87N-0794-01/472-2023-085888, including certifications of noncollusion and history of debarment, declaration limitations on use of federal funds for lobbying pursuant to 31 U.S.C. 1352, and notice of requirement for affirmative action to ensure equal employment opportunity under Executive Order 11246. It outlines contractor certifications related to competitive bidding, debarment status, lobbying restrictions, and equal employment opportunity goals and timetables for minority and women participation in the State of Kansas. The document is a set of standard contract compliance forms and declarations relevant to federal and state contracting requirements.
PDF
PDF, Low priority20 pages · other
LowAI Summary for Soil Management Plan for Redbud Bike Path Project 10VCP0031: This Soil Management Plan (SMP) prepared by GSI Engineering LLC for the City of Wichita outlines soil management activities for the Redbud Bike Path Project in Wichita, Kansas. The plan addresses handling and onsite placement of disturbed ballast material containing contaminants such as heavy metals, PAHs, and TPH above Kansas risk-based standards. It includes procedures for pre-construction, construction, and post-construction activities to protect human health and the environment by minimizing exposure and preventing contaminant transport. The document is dated September 4, 2019, and is part of the KDHE Voluntary Cleanup and Property Redevelopment Program.
PDF
PDF, Low priority818 pages · other
LowAI Summary for Voluntary Cleanup Plan Addendum No. 4 Pre-Design Investigation Report Redbud Bike Path Wichita KS August 2024: This document is the Voluntary Cleanup Plan Addendum No. 4, a Pre-Design Investigation Report for the Redbud Bike Path project in Wichita, Kansas, dated August 2024. Prepared by GSI Engineering, LLC for the City of Wichita and Benesch, it details environmental investigations including soil characterization, site background, and historical assessments related to contamination from former railroad operations. The report includes objectives, investigation documentation, results on metals, PAHs, TPH, VOCs, and recommendations for remediation under the KDHE Voluntary Cleanup and Property Redevelopment Program.
ZIP
ZIP
ZIP
ZIP
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseAwarded
Posted
Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.