This Solicitation opportunity from Texas was posted on June 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract pertains to the construction of Compartment 1A and 2 of the T.C. Jester Stormwater Detention Basins under the jurisdiction of the Harris County Flood Control District, with the project identified as K500-23-00-E004. This initiative is aimed at enhancing regional stormwater management capabilities to mitigate flood risks, particularly in alignment with FEMA guidelines, and involves the development of engineered detention basins designed to capture, store, and gradually release runoff during heavy rainfall events. The work will require significant earthmoving, structural construction, and hydrological system integration within the designated performance area in Texas, ensuring compliance with local and federal flood control standards.
The solicitation, identified by number 26/0210, was posted on June 26, 2026, with responses due by July 20, 2026, at 7:00 PM Central Time. Interested parties must submit proposals through the official platform linked in the contract details. The primary point of contact for inquiries is Maria Heinzmann, who can be reached via email at [email hidden]. There is no designated set-aside classification for this opportunity, indicating it is open to all eligible contractors without preference based on business size or other demographic factors. All work is to be performed on-site in Harris County, Texas, with no specific NAICS code or organizational type restrictions listed.
General Info
Construction of T.C. Jester stormwater basins in Harris County, Texas, to improve flood control under project K500-23-00-E004.
HighAI Summary for Addendum No. 1 - 260210: MWBE Goal Participation: This document is Addendum No. 1 for project 260210, detailing Harris County's Minority- and Woman-Owned Business Enterprise (M/WBE) goal participation requirements. It establishes a 30% participation goal and outlines the mandatory submission of an M/WBE Utilization Plan, certification requirements, and the definition of 'Significant Local Presence'. It also provides specific guidance on counting M/WBE performance, the use of trucking firms, and the requirement for subcontractors to perform a 'commercially useful function' to receive credit.
PDF
PDF, High priority: read this firstsupporting-documents
HighAI Summary for Attachment AA - M/WBE Utilization Commitment and Plan: This document consists of the Minority- and Woman-Owned Business Enterprise (M/WBE) Utilization Commitment Form and the M/WBE Utilization Plan for Harris County. It requires bidders to certify their commitment to M/WBE participation goals, provide detailed subcontractor information, and document Good Faith Efforts if goals are not met.
PDF
PDF, High priority: read this first1 page · bid-addenda-acknowledgement
HighAI Summary for Attachment A - Bid Addenda Acknowledgement: This document is Attachment A titled 'Bid & Addenda Acknowledgement' related to an Invitation for Bid (IFB). It includes sections for acknowledging receipt of all addenda associated with the solicitation, with space to list addendum numbers and dates or indicate if no addenda were received. It also contains a bid acknowledgement section where the authorized representative certifies the bid is made without collusion, agrees to abide by all IFB conditions, and confirms the pricing and statements are true and correct. The document requires signatures and company information from the bidder and includes a section for internal acceptance by Harris County officials. This form is essential for bid submission compliance and verification.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment B - Bid Schedule / Pricing Form: This document outlines the pricing requirements and submission process for an Invitation for Bid (IFB) with Harris County. It specifies that pricing must be submitted via the Bonfire portal, must be all-inclusive and firm for the contract duration, and includes guidelines for equipment maintenance costs.
PDF
PDF, High priority: read this firststatement-of-bidder-qualifications
HighAI Summary for Attachment D Statement of Bidder Qualifications: This document, titled Attachment D Statement of Bidder Qualifications, is a form used to evaluate the responsibility of bidders for a solicitation. It requires bidders to provide detailed information about their company, including business type, years in operation, litigation history, experience with similar projects, subcontractor relationships, and equipment availability. The form also includes affidavits and requires notarization. It is intended to be submitted with the bid to assist in the evaluation process and ensure bidders meet the necessary qualifications and legal requirements.
PDF
PDF, High priority: read this firstcertification-compliance
HighAI Summary for Attachment L - Certification of Compliance with Federal Standards & Requirements: This document, titled Attachment L, is a Certification of Compliance with Federal Standards & Requirements related to an Invitation for Bid (IFB). It certifies that the bidder understands and complies with applicable federal standards and regulatory requirements, including those in 2 CFR 200.326 and Appendix II, and agrees to pass these requirements to subcontractors. Key compliance areas include access to records, accessibility laws, anti-lobbying agreements, civil rights, environmental laws such as the Clean Air Act and Federal Water Pollution Control Act, labor standards including the Contract Work Hours and Safety Standards Act, the Copeland Anti-Kickback Act, prohibition of cost-plus contracting, Davis Bacon and Related Acts, and debarment and suspension regulations. The document requires bidder initials and signature to affirm compliance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment N - Workers' Compensation Insurance Coverage Rule 110.110: This document, titled Attachment N, details the Workers' Compensation Insurance Coverage Rule 110.110 applicable to building or construction contracts in Texas. It outlines mandatory requirements for contractors to provide and maintain workers' compensation insurance coverage for all employees and subcontractors involved in a project, including definitions, certificate of coverage requirements, notification procedures, and contractual obligations. The document emphasizes compliance with Texas Labor Code Section 401.011(44) and includes provisions for coverage duration, certificate retention, and breach consequences. Revised April 2002.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Attachment P Required Contract Provisions for Federally Funded Harris County Contracts: This document, titled Attachment P, outlines the required contract provisions for Harris County contracts funded wholly or partially by federal awards. It includes compliance requirements with federal laws such as access to records and record retention (2 CFR 200.336), accessibility standards (24 CFR 570.614 and Section 504), the Byrd Anti-Lobbying Agreement (2 CFR 200 Appendix II (J)), the Civil Rights Act of 1964 (Title VI), and environmental regulations including the Clean Air Act. The provisions mandate contractors to allow access to records, prohibit discrimination, require anti-lobbying certifications, and ensure environmental compliance. Contractors must also flow down these requirements to subcontractors. The document is essential for ensuring legal and regulatory compliance in federally funded contracts with Harris County.
PDF
PDF, High priority: read this firstgeotechnical-report
HighAI Summary for Geotechnical Evaluation Report for TC Jester Detention Basins K500-23-00-E003: This document is a Design Phase Geotechnical Evaluation report for Harris County Flood Control District Project K500-23-00-E003, concerning the TC Jester Detention Basins located in Spring, Texas. Dated October 31, 2024, the report includes methodology, findings, geotechnical considerations, and recommendations for design and construction of three wet-bottom detention basins. It covers site exploration, field and laboratory testing, soil and groundwater conditions, engineering analyses including slope stability, borrow material analysis, seepage, erosion, and construction considerations. The report aims to support the design and construction phases with detailed geotechnical data and recommendations.
PDF
PDF, High priority: read this firstpolicy
HighAI Summary for Harris County Contractor Minimum Wage Policy: This document outlines the Harris County Contractor Minimum Wage Policy adopted by the Harris County Commissioners Court on June 4, 2024. It establishes a minimum wage floor of $21.65 per hour for workers on eligible County contracts, adjusted annually using the MIT Living Wage Calculator. The policy applies to contractors and subcontractors working on County projects starting July 1, 2025, with specific exemptions listed. It aims to improve work quality, safety, and productivity on County contracts. The Purchasing Department administers compliance and wage adjustments annually.
PDF
PDF, High priority: read this firstproject-manual
HighAI Summary for Harris County Flood Control District Project Manual K500-23-00-E004: This project manual for Harris County Flood Control District Project ID K500-23-00-E004, dated May 22, 2026, covers contract conditions and specifications for the East T.C. Jester Stormwater Detention Basins 1A and 2. It includes bidding requirements, general and special contract conditions, and detailed construction specifications referencing Harris County Flood Control District, City of Houston, and TxDOT standards. The manual outlines site construction provisions, general requirements, and contract-specific specifications. It also references geotechnical reports, USACE permits, environmental reports, and plans. The document mandates contractor compliance with Texas Local Government Code and use of Oracle's Primavera Unifier for project management.
PDF
PDF, High priority: read this firstinsurance-requirements
HighAI Summary for Harris County Minimum Insurance Requirements Attachment: This document outlines the minimum insurance requirements for contractors working with Harris County. It specifies the types and minimum limits of insurance coverage required, including Workers' Compensation and Employer's Liability, Commercial General Liability, Business Automobile Liability, and Contractor's Pollution Liability. The document details coverage conditions, endorsements, and waivers of subrogation to protect County Indemnified Parties. It also references specific ISO insurance forms and mandates coverage durations, such as maintaining Products-Completed Operations coverage for at least five years post-substantial completion. The document serves as an attachment to a contract, ensuring contractors meet specified insurance standards to mitigate risk.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB for T.C. Jester Stormwater Detention Basins Construction: This document is an Invitation for Bids (IFB) issued by Harris County for the construction of the T.C. Jester Stormwater Detention Basins - Compartment 1A and 2 for the Harris County Flood Control District, Project ID K500-23-00-E004. It includes general requirements, specifications, submission instructions, evaluation and award procedures, and contract requirements. The project schedule is 240 calendar days, with the contract term commencing upon the Notice to Proceed and lasting until final acceptance. The IFB outlines compliance with federal, state, and local regulations, including federal grant funding requirements under 2 CFR 200. A pre-bid conference is scheduled, and bidders are encouraged to attend. The document emphasizes the responsibility of bidders to understand all project conditions and submit bids accordingly. Questions must be submitted in writing by a specified deadline, and all clarifications will be provided via addenda.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for K500-23-00-E004 TC Jester Detention Basins - Geotechnical Evaluation: A design phase geotechnical evaluation report by Ninyo & Moore for HCFCD Project K500-23-00-E003 (TC Jester Detention Basins), dated October 31, 2024. The document provides subsurface soil and groundwater analysis, slope stability evaluations, and engineering recommendations for the construction of three wet-bottom detention basins (1a, 1b, and 2) along Cypress Creek in Harris County, Texas.
PDF
PDF, Low prioritycertification
LowAI Summary for Attachment C Certification Regarding Lobbying: This document is Attachment C, a Certification Regarding Lobbying to be submitted with each bid exceeding $100,000. It certifies that no federal appropriated funds have been used for lobbying activities related to the contract and outlines the requirements for disclosure of lobbying activities using Standard Form LLL. The certification is a material representation required by 31 U.S.C. § 1352 and includes penalties for non-compliance. The form also includes sections for reporting federal action type, status, and details about lobbying registrants and individuals performing services.
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Construction of the T.C. Jester Stormwater Detention Basins – Compartment 1A and 2 for the Harris County Flood Control District – Project ID K500-23-00-E004