ITB No. 2024-0002
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Stockbridge, Georgia is inviting sealed bids for the Walter Way, Pine View, and Memorial Park Lift Station Rehabs project, with bids due by 3:00 pm EDT on March 28, 2024. The project involves comprehensive rehabilitation work at three lift stations, requiring bidders to supply all necessary materials, equipment, and labor to complete tasks such as demolition, wet well rehabilitation, installation of generators and valves, site work, electrical and mechanical systems, fencing, erosion control, and other related improvements to ensure fully operational facilities. The work must adhere to the provided drawings and specifications, with the entire project awarded as a single contract. The contract specifies a substantial completion timeline of 240 days, excluding the generator, which has a longer completion window of 465 days. If the generator lead time exceeds 14 months, additional time may be granted. The project includes provisions for mobilization, demobilization, bonds, insurance, and all necessary appurtenances to deliver a complete, functioning installation. Bidders are encouraged to review the detailed solicitation and submit their bids by the deadline, with contact information provided for further inquiries.
General Info
Place of Performance
GA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work to be completed shall consist of furnishing all materials and equipment and to perform all labor necessary to complete the Walter Way, Pine View and Memorial Park lift station rehabilitation improvements shown on the Drawings and as specified herein, including, but not limited to, mobilization/demobilization, bonds, insurance, demolition, temporary bypass connection, temporary bypass pumping, wet well rehabilitation, generator, valve vault, piping, valves, fencing, site work, wet well top, manholes, pumps, soil erosion and sediment control and grassing at the lift station site, construction exit, electrical, mechanical, painting and other appurtenances necessary to provide a complete and working installation.
Time allotted for Substantial Completion of work is 240 consecutive calendar days excluding generator. Time allotted for the generator and ATS is 465 days. If generator lead time exceeds 14 months, additional time may be added. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS