Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on December 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ITB - Scriber Creek Trail Phase 3 Construction (Readvertisement)

Closed
3671 (ReAd)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334290
New
DIBBS
INTERFACE UNIT, COMMUNI
Solicitation # SPE4A7-27-T-2289
Solicitation SPE4A7-27-T-2289 is a request for quotations issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div for the procurement of three interface units for communication equipment, identified by NSN 5895-01-739-0196. The requirement specifies parts from Watlow Electric Manufacturing Co (P/N 2292-6980 and PM6C1CJ-ARAAVWP). Delivery is required within 146 days after order, with a need ship date of April 1, 2027, and an original required delivery date of August 13, 2027. The items are to be delivered FOB Origin to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E for packaging, MIL-STD-129 for marking, and RP001 for palletization. Inspection and acceptance will occur at the destination. Quality assurance follows MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for sample lots under MIL-STD-105/ASQ Z1.4. Administrative requirements include the use of Wide Area WorkFlow (WAWF) for invoicing and payment. The solicitation incorporates several federal regulations, including the Buy American and Balance of Payments Program, DFARS cybersecurity reporting requirements, and prohibitions on covered telecommunications equipment. Award may consider the HUBZone price evaluation preference.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 2 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract involves a comprehensive construction project to enhance and expand the Scriber Creek Trail in Lynnwood, Washington, specifically focusing on the phase 3 improvements. The scope includes approximately 21,700 linear feet of shared use trail between 200th Street SW and Wilcox Park, along with about 400 linear feet of paved pathway connecting the trail to 53rd Avenue SW. Key activities encompass clearing and grubbing, wetland vegetation trimming, removal of structures and obstructions, and the demolition of timber bridges and wood abutments. The project also involves roadway excavation, installation of steel pin piles, elevated boardwalk structures, and the placement of aggregates and hot mix asphalt. Additional work includes invasive species removal, wetland and buffer enhancement plantings, landscaping, installation of benches, and modifications to catch basins, traffic signals, and illumination systems. Erosion control, traffic management, pavement markings, and other related tasks are integral parts of the project, most of which are situated within a floodplain and peat wetland buffer, making soil saturation and water level management critical considerations. The project, titled "ITB - Scriber Creek Trail Phase 3 Construction (Readvertisement)," is managed by the City of Lynnwood under the Washington State Department of Local Economic Development (SLED). The solicitation was posted on December 31, 2024, with a response deadline of January 22, 2025. The contract size is estimated between five and ten million dollars, and the NAICS code associated with the project is 334290. The primary point of contact is Katie McKee, reachable via email at [email hidden] or by phone at [phone hidden]. The project emphasizes environmental sensitivity due to its location within wetlands and floodplain areas, requiring careful planning and execution to minimize ecological impact. The bidding process also includes affidavits affirming the absence of collusion and anti-competitive practices, ensuring fair competition among bidders.

General Info

Documents

24

Bid #3671: Scribner Creek Trail Phase 3 Construction

PDF, High priority: read this firstifb
High

Contractor Certification Wage Law Compliance

PDF, High priority: read this firstwage-determination
High

DBE Utilization Certification

PDF, High priority: read this firstsupporting-documents
High

DOT Form 272-054: DBE Bid Item Breakdown Form

PDF, High priority: read this firstspecifications
High

Scribner Creek Trail Geotechnical Engineering Report

PDF, High priority: read this firstspecifications
High

Statement of Bidder's Qualifications

PDF, High priority: read this firstpast-performance
High

Bidder Questionnaire Form

PDF, Low prioritybidder-questionnaire
Low

City of Lynnwood Local Agency Subcontractor List (DOT Form 271-015LP)

PDF, Low priorityother
Low

DBE Trucking Credit Form

PDF, Low prioritysupporting-document
Low

DBE Written Confirmation Document

PDF, Low prioritysupporting-document
Low

HPA Permit 2024-4-153+04 - Scribr Creek Trail Phase 3

PDF, Low prioritypermit
Low

Non-Collusion Declaration

PDF, Low priorityother
Low

Responsible Bidder Determination Form

PDF, Low priorityother
Low

Responsible Subcontractor Determination Form

PDF, Low priorityother
Low

Addenda_Acknowledgement,_Work_By_Bidders_Org,_Time_for_Completion,_Liquidated_Damages.pdf

PDF

Bid_Cover_Sheet.pdf

PDF

Bid_Security.pdf

PDF

Claims_Against_Retainage_and_Bonds.pdf

PDF

Delinquent_State_Taxes.pdf

PDF

Lawsuits.pdf

PDF

Non-Collusion_Affidavit.pdf

PDF

Public_Bidding_Crimes.pdf

PDF

SCT3_Contract_Plans.pdf

PDF

Termination_for_Cause_Termination_for_Default.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Lynnwood
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → City of Lynnwood
Office AddressN/A

Full Description

Show more
The improvement of approximately 21,700 lineal feet of shared use trail between 200TH ST SW and Wilcox Park and approximately 400 lineal feet of paved pathway between the shared use trail and 53rd AVE SW by clearing and grubbing, trimming wetland vegetation, removing structures and obstructions, removing timber bridges and wood abutments, roadway excavation, furnishing and installing steel pin piles, furnishing and installing elevated boardwalk structures, placing aggregates and hot mix asphalt, removing invasive species, landscaping including wetland and wetland buffer enhancement and plantings, installing benches, modifying catch basins, modifying traffic signal system, installing illumination system, erosion control, traffic control, pavement markings, and other work. Most of the work is located within the floodplain and buffer of a peat wetland and is subject to soil saturation and varying water levels.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS