This Solicitation opportunity from Texas was posted on October 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Harris County contract involves the procurement of a Smart Cushion Crash Attenuator (CCA) System Replacement along with related items, with an initial term beginning approximately November 1, 2025, and lasting for one year. The project aims to upgrade existing crash attenuator systems with advanced Smart CCAs to enhance roadway safety and traffic management on Harris County toll roads. Bidders are required to submit their proposals through the Bonfire platform, adhering to detailed specifications, evaluation criteria, and compliance standards, including PCI DSS requirements. The contract size is estimated to range between $500,000 and $1,500,000, reflecting the scope and technical complexity of the system replacement.
The procurement process emphasizes compliance with Harris County’s broader policies on minority and woman-owned business enterprise (M/WBE) participation, requiring bidders to submit utilization plans, good faith effort documentation, and certification forms to meet or exceed set M/WBE goals. Additionally, contractors must adhere to strict requirements related to lane closure approvals, traffic control standards, and insurance coverage, ensuring safety and legal compliance throughout project execution. Supporting documents include detailed traffic and roadway segment data, subcontractor approval procedures, and comprehensive bid acknowledgment forms. Overall, the contract represents a significant infrastructure upgrade aimed at improving safety, operational efficiency, and fostering inclusive procurement practices within Harris County’s transportation initiatives.
HighAI Summary for 9-HCTRA Specification Item 502 - Barricades, Signs, and Traffic Handling: This document is Specification Item 502 from the Harris County Toll Road Authority (HCTRA) detailing requirements for barricades, signs, and traffic handling during construction. It includes descriptions of the scope of work, construction requirements, equipment, devices, personnel, and lane closure procedures. The specification references compliance with the Texas Manual on Uniform Traffic Control Devices and outlines responsibilities for installation, maintenance, and removal of traffic control devices. It also covers coordination with other contractors, lane closure request timelines, and use of off-duty officers. The document serves as a critical technical specification for traffic control in HCTRA projects.
PDF
PDF, High priority: read this first1 page · bid-acknowledgment
HighAI Summary for Bid Acknowledgment for Harris County IFB: This document is a Bid Acknowledgment form related to an Invitation for Bid (IFB) issued by Harris County. It requires a corporate officer, partner, or proprietor to certify that the bid is made without collusion or fraud and that the bidder agrees to abide by all IFB conditions. The form includes fields for project job number, project description, authorized signature, company details, and contact information. It serves as a formal attestation of the bid's validity and pricing accuracy, signed by an authorized representative and accepted internally by the Harris County Judge.
PDF
PDF, High priority: read this firstgeneral-requirements
HighAI Summary for Harris County General Requirements for Bids: This document titled 'Harris County General Requirements for Bids' outlines the mandatory instructions, compliance requirements, and procedural guidelines for submitting bids to Harris County. It includes vendor payment methods, record access, assignment restrictions, award criteria, bid submission instructions, bond requirements, and certifications related to debarment and legal compliance. The document emphasizes adherence to federal, state, and local laws, ethical business conduct, and specifies the responsibilities of vendors in the bidding process. It serves as a critical reference for all bidders to ensure their submissions meet county standards and legal obligations.
PDF
PDF, High priority: read this first1 page · minimum-insurance-requirements
HighAI Summary for Harris County Minimum Insurance Requirements: This document outlines the minimum insurance requirements for contractors during the term of a contract with Harris County. It specifies the types and limits of insurance coverage required, including Workers Compensation, Employers' Liability, Commercial General Liability, Automobile Liability, Umbrella/Excess Liability, and Professional/Errors & Omissions Liability if applicable. The document mandates that Harris County be named as an Additional Insured on a primary/non-contributory basis for certain coverages. It also details conditions for insurance companies, evidence of insurance, subcontractor insurance, waiver of subrogation rights, notification of policy changes, and consequences of non-compliance. The document was last revised in August 2017.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SCI70GM and SCI100GM Design, Installation and Maintenance Manual: This document is the Design, Installation and Maintenance Manual for the SCI70GM and SCI100GM SMART CUSHION® impact attenuators, which are speed-dependent crash attenuators approved under NCHRP 350 and MASH standards. It includes detailed product overview, maintenance instructions, crash performance data, specifications, design criteria, installation procedures, resetting after impact, and appendices with parts and equipment lists. The manual covers system dimensions, foundation requirements, support structure, and location guidelines. It is intended to guide proper installation, maintenance, and repair to ensure safety and compliance with federal standards.
PDF
PDF, High priority: read this firstinstallation-checklist
HighAI Summary for Smart Cushion Attenuator Installation Checklist: This document is the Smart Cushion Attenuator Installation Checklist, providing detailed procedures for proper installation to ensure performance as designed. It includes foundation requirements, unloading and placement instructions, anchor installation with adhesive and torque specifications, hardware checks, rear panel clearance, front panel striping, and transition requirements. The checklist references the Manufacturer's Design and Installation Manual for additional specifications and drawings. It is intended to be used with proper traffic control in compliance with local, state, and federal laws.
PDF
PDF, High priority: read this first9 pages · other
HighAI Summary for Smart Cushion Crash Attenuator System Replacement Specifications - Harris County Toll Road Authority: This document contains the specifications for the replacement of Cushion Crash Attenuator (CCA) systems with Smart CCAs for the Harris County Toll Road Authority. It outlines the scope of work, contract term starting November 1, 2025, renewal options, and compliance requirements including Payment Card Industry Data Security Standard (PCI DSS). The document details submission instructions, evaluation criteria, invoicing requirements, and contract change procedures. It emphasizes the need for vendors to submit bids through Bonfire, the public nature of bids, and the necessity of completing Form 1295 for interested parties disclosure. The document also covers usage reporting, payment terms, and vendor responsibilities regarding toll/parking fees and confidentiality.
PDF
PDF, Low priority19 pages · other
LowAI Summary for 15-CCA Map Book - Traffic and Roadway Segment Data: This document titled '15-CCA Map Book' contains detailed tabular data related to traffic and roadway segments. It includes columns such as CCA StickerID, Description, Roadway Segment, Traffic Direction, Location, Chevron Size, HCTRAID, CCA ID, and Sheet Number. The data appears to catalog various exit ramps, entrance ramps, gantries, and bridges with associated identifiers and directional information. The document serves as a reference map book for traffic control assets or infrastructure components, but it does not represent a solicitation or procurement notice.
PDF
PDF, Low priorityspecifications
LowAI Summary for 17-HCTRA Ramp Closure Standards: This document titled '17-HCTRA Ramp Closure Standards' provides standards related to ramp closures, including instructions on traffic exits before closed ramps and the use of message boards as incidental to item 502. It includes a disclaimer noting governance by the Texas Engineering Practice Act and disclaims warranties or responsibilities by HCTRA for use or conversion of the standard. The document appears to be a technical standard or specification related to traffic management for ramp closures.
PDF
PDF, Low priority9 pages · other
LowAI Summary for 5-MWBE Utilization Plan Commitment Form Rev. 10/2024: This document is the Minority and Woman-Owned Business Enterprise (M/WBE) Utilization Commitment Form, revision 10/2024. It is used by bidders to commit to M/WBE participation goals on a project, either meeting or documenting good faith efforts if goals are not met. The form includes sections for project identification, prime company information, utilization plan summary, and disclosure of M/WBE subcontractors. It requires certification details, contact information, and percentage participation of M/WBE firms. The form becomes part of the contract with Harris County and includes instructions and tips for compliance and verification.
PDF
PDF, Low priority10 pages · other
LowAI Summary for 6-MWBE Trucking Procedure Compliance Packet: This document is the M/WBE Trucking Procedure Compliance Packet from the Department of Economic Equity and Opportunity, Rev. 0 dated February 2025. It outlines requirements for M/WBE firms to ensure Commercially Useful Function (CUF) in trucking operations, including ownership, operation, exclusive use, and control of trucks. It details crediting rules for M/WBE trucking services, leasing conditions, and required submittal documentation such as W-9, insurance, and proof of truck ownership. The document also describes the courtesy utilization plan review process and contact information for the department. It serves as a procedural guide for compliance with M/WBE trucking participation goals.
PDF
PDF, Low priority17 pages · other
LowAI Summary for Harris County MWBE Goal Participation Information Packet: This document outlines Harris County's Minority and Women-Owned Business Enterprise (M/WBE) goal participation requirements for contractors. It emphasizes the County's commitment to engaging diverse businesses and mandates vendors to meet or make good faith efforts toward a specified M/WBE participation goal. The packet includes definitions, certification requirements, utilization plans, and documentation needed for compliance. It details accepted certifications, criteria for significant local presence, and rules for counting M/WBE participation, including subcontracting and joint ventures. The document also covers the use of trucking firms for goal credit and the concept of commercially useful functions. This information supports contractors in meeting the County's M/WBE policy adopted in 2020.
PDF
PDF, Low priority1 page · other
LowAI Summary for HCTRA Lane Closure Request Form: This document is a request form for approval of lane closures for construction and maintenance under the Houston County Toll Road Authority (HCTRA). It outlines requirements for different types of closures including single lane, major, and total closures with specified notice periods. The form collects details such as start and end dates, lane closures, limits of work, traffic control, detour plans, coordination with other work, and contact information for the requestor and project manager. It also requires submission of proposed traffic control standards or engineered drawings for approval. The form was last revised on October 17, 2023.
PDF
PDF, Low priorityspecifications
LowAI Summary for SCI070GM and SCI100GM TL2 and TL3 Smart Cushion Parts Identification Sheet: This document is a parts identification sheet for SCI070GM TL2 and SCI100GM TL3 Smart Cushions. It lists various components such as sleds, mobile frames, terminal braces, panels, side keepers, delineator panels, bolts, and tools with their part numbers and quantities. The sheet serves as a reference for identifying parts used in these specific smart cushion models.
PDF
PDF, Low priorityspecifications
LowAI Summary for SCI070GM TL2 Smart Cushion Parts Identification Sheet: This document, titled 'SCI070GM TL2 Smart Cushion Parts Identification Sheet,' provides a detailed list and identification of parts for the TL2 Smart Cushion. It includes part names, quantities, and part numbers for components such as sled panels, mobile frames, terminal braces, side keepers, and various bolts and tools. The sheet serves as a reference for identifying and ordering specific parts related to the TL2 Smart Cushion assembly.
PDF
PDF, Low priorityspecifications
LowAI Summary for SCI100GM TL3 Smart Cushion Parts Identification Sheet: This document, titled 'SCI100GM TL3 Smart Cushion Parts Identification,' provides a detailed parts list and identification for the TL3 Smart Cushion system. It includes part numbers, quantities, and descriptions for various components such as sleds, mobile frames, terminal braces, panels, keepers, bolts, and tools. The sheet serves as a reference for identifying and ordering specific parts related to the SCI100GM TL3 Smart Cushion assembly.
LowAI Summary for Subcontractor Listing Form for Harris County Project: This Subcontractor Listing Form requires the contractor to provide detailed information about any potential subcontractors, subconsultants, professionals, suppliers, and vendors involved in the project. It includes fields for company name, industry, DUNS number, principal name, contract value, contract duration, and certifications such as HUB/MWBE and Section 3. The form emphasizes the county's right to approve subcontractors and the contractor's responsibility to ensure subcontractors are properly licensed, insured, and authorized. A final listing is required before contract award, and any changes must be submitted for approval. The form also includes an option for the contractor to declare no subcontracting will occur.
PDF
PDF, Low priority1 page · other
LowAI Summary for Tax Residence Certification Form for Harris County Texas: This document is a Tax Residence Certification form used for advertised projects in Harris County, Texas. It collects taxpayer identification, company information, business registration status in Texas, taxable property details in Harris County, any debts owed to Harris County, and residence certification pursuant to Texas Government Code §2252.001. The form distinguishes between resident and nonresident bidders for governmental contracts and requires certification of bidder status. The version is revised as of November 2009.
Smart Cushion Crash Attenuator (CCA) System Replacement and Related Items for the Harris County Toll Road Authority (for one (1) year beginning approximately November,1 2025)