This Solicitation opportunity from Florida was posted on August 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum #1 - Millennium Park (Project #W12803): Addendum #1 dated 09/13/2024 for the Millennium Park project in Wildwood, FL. This document modifies the original contract documents by revising the civil grading plan (Sheet C0.9.4) to clarify contours and the gravity wall, updating the Project Manual to include Divisions 3-32, and adding Gravity Retaining Wall and Pipe Guiderail items to the Bid Form quantities table.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #2 - Millennium Park (Wildwood, FL): Addendum #2 dated 10/02/2024 for the Millennium Park project in Wildwood, FL. This document modifies the project manual by extending the question deadline to October 4, 2024, and the sealed response deadline to October 11, 2024. It also adds Section 32 18 23 to the Project Manual.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Boundary Topographic Survey: A Statement of Work (SOW) for boundary and topographic surveying services. The document outlines the technical requirements for performing land surveys, including boundary determination and topographic mapping, to support procurement and development activities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Wildwood Millennium Park Phase 1 & 2 Project Manual: Project Manual dated September 2024 for the City of Wildwood Millennium Park Phase 1 & 2. The document includes the project index, certifications, a comprehensive list of bidding requirements, contract forms, and detailed technical specifications across multiple divisions (Concrete, Masonry, Metals, Electrical, etc.), as well as a detailed list of site construction drawings.
PDF
PDF, High priority: read this firstifb
HighAI Summary for City of Wildwood Millennium Park Phase 1 & 2 Project Manual: Project Manual dated August 2024 for the City of Wildwood Millennium Park Phase 1 & 2. The document includes bidding requirements, contract forms, general conditions, and detailed technical specifications across multiple divisions (Concrete, Masonry, Metals, etc.), as well as a comprehensive list of construction drawings.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for ITB 2024-30 Addendum 2 Bid Question Log: A bid question and response log dated October 1, 2024, for solicitation ITB 2024-30. The document contains 18 specific technical inquiries from contractors (including CWR Contracting, Burke Construction, Carr & Collier, and Bay Area Precast) regarding bridge plans, earthwork quantities, project manuals, and site specifications, with corresponding official responses from the City.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB 2024-30 Millennium Park Phase 1 & 2 Addendum No. 1: Addendum No. 1 dated September 13, 2024, for City of Wildwood ITB 2024-30. This document modifies the original solicitation by adding a Narrative of Change and a Bid Question Log, and replacing the Project Manual and the Civil, Landscape, Irrigation, & Hardscape Set of Plans with current versions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB 2024-30 Millennium Park Phase 1 & 2 Addendum No. 2: Addendum No. 2 for City of Wildwood ITB 2024-30 (Millennium Park Phase 1 & 2), dated October 2, 2024. This document modifies the original solicitation by extending the sealed response deadline to October 11, 2024, updating the question deadline to October 4, 2024, adding Section 32 18 23 to the Project Manual, and incorporating a Bid Question Log dated October 1, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB2024-30 Section 32 18 23: Tennis & Racquetball Court Surfaces: Technical specifications for the installation of asphalt tennis court cushioned surface color coating systems and racquetball court markings. The document details reference standards (ASBA, USTA, ITF), submittal requirements, quality assurance for manufacturers and applicators, and specific material requirements including the SportMaster ProCushion System, crack sealants, and color coating options.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Millennium Park Civil Landscape Irrigation Hardscape Addendum 1: Addendum 1 for the Millennium Park project, specifically covering civil landscape, irrigation, and hardscape sets. The document includes site photometry statistics, general lighting notes for Duke Energy installation, and a detailed specifications table for sports field amenities (bases, home plates, pitcher's rubbers, dugout benches, foul poles, batting cages, fence caps, pickleball posts, and goal posts). It is marked 'FOR BIDDING PURPOSES ONLY' and dated May 2, 2021.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for Millennium Park Ph12 Bid Question Log (Addendum 1): A bid question and answer log dated September 13, 2024, issued as part of Addendum 1 for the Millennium Park Phase 12 project. The document provides clarifications on bridge abutments, prefabricated bridge dimensions, CADD file availability, the Engineer's estimate, and missing project manual sections. It also addresses earthwork quantities, over-excavation allowances, and revisions made since the 2023 bid version.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Millennium Park Phase 1 & 2 Basketball and Racquet Ball Court Construction Plans: Construction plans and general notes for the Phase 1 & 2 Basketball Court and Enclosure Racquet Ball Court at Millennium Park, located at 1300 Huey Street, Wildwood, Florida. The document specifically details technical requirements for interior finish materials, focusing on frame spread and smoke developed ratings.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Millennium Park - Phase 1 & 2 Invitation for Bids: The City of Wildwood is soliciting competitive sealed bids for the construction of Millennium Park - Phase 1 & 2. The project includes access roads, parking lots, sports fields (softball, soccer, tennis, basketball), a pedestrian bridge, and associated utility and landscaping work. Bids are due by October 7, 2024, at 3:00 P.M. local time. Questions must be submitted by September 30, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Pioneer Bridge Installation Guidelines: Technical installation guidelines for Pioneer Bridges, covering bridge splice procedures, the 'turn of the nut' method for high-strength bolts, lifting requirements to avoid structural stress, and bearing/grouting procedures.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Deadline changed
Response deadline changed from Oct 15, 2024 to Oct 7, 2024.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.