Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Ives Railcar Bridge across Russian River Project (Project) Notification of Lake or Streambed Alteration, No. EPIMS-MEN-67004-R1C

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has entered into Lake and Streambed Alteration Agreement EPIMS-MEN-67004-R1C with Zack Ives for a project located in Willits, California. The scope of work involves the removal and replacement of a railcar bridge over the Russian River that was damaged during the 2017 Lighting Complex fires. The new bridge will be installed using existing abutments. Associated activities include minor vegetation trimming, the extension of an existing inboard ditch on the western approach through minor excavation, and the application of straw mulch and native grass seed for erosion control. To protect the environment, all work is scheduled to be completed while the channel is dry, ensuring that equipment does not enter the stream channel.

General Info

Zack Ives will replace a railcar bridge over the Russian River in Willits.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

approximately 7.4 miles southeast of the City of Willits, Willits, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MEN-67004-R1C_Notice-of-Exemption

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Jennifer GarrisonSenior Environmental Scientist Specialist
Zack IvesPlease contact Jennifer Garrison of CDFW

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-67004-R1C, pursuant to Section 1602 of the Fish and Game Code to Zack Ives. The Project is limited to one (1) encroachment to remove and replace a railcar bridge over the Russian River damaged during the 2017 Lighting Complex fires. The replacement bridge will be placed on existing abutments. Work for this encroachment will include minor excavation to extend an existing inboard ditch on the western approach, minor vegetation trimming, and applying native grass seed and straw mulch for erosion control. Work will be completed when the channel is dry and equipment will not enter the stream channel.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE), Veteran-Owned Small Business Enterprises (VSBE), and Disadvantaged Business Enterprises (DBE) for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure needs such as site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical work, and telecommunications. Bidders must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal, hold a valid California Contractor's license, and provide acceptable insurance. Subcontractors may be required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring firms to maintain labor harmony and adhere to collective bargaining agreements with various trades. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested firms must contact the lead estimator to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS