This Sources Sought Notice is issued for informational and planning purposes only. It is not a solicitation, nor does it guarantee a solicitation will be issued. The information received will help determine what businesses are capable of providing this service as well as assist the Government in determining the extent of the small business and socioeconomic market for the following service: REMOVAL & REPLACEMENT OF HIGHLINE DOCKS PERFORMANCE WORK STATEMENT 1. Scope of Work: The Contractor shall provide all personnel, equipment, tools, materials, supervision and other items necessary to disassemble, relocate, and reassemble 5 highline dock systems. This contractor will need to be knowledgeable on the removal, installation, and leveling techniques associated with these particular systems to ensure a proper reconfiguration at the final destination. The details are as follows: 1.1 Remove and disassemble 5 individual highline loading docks inside hanger located at 1817 Manor Road McGuire AFB, 08641. Dock dimensions are as follows: 3 highlines - est 12' wide x 45' long x 42" high 1 highline - est 12' wide x 55' long x 42" high 1 highline - est 12' wide x 38' long x 45" high *Note- disassembly may require separating welded sections to achieve desired lengths for transport. This equipment is located inside a nose dock hanger and is not accessible via crane operations. **Site visit will be scheduled 1.2 Transport these components to Bldg 1932 Fairbanks St, Andrews AFB, MD 20762. * Note- this facility is an AGE warehouse and is also not accessible via crane operations. *Site visit will be scheduled 1.3 Reassemble and configure 3 highline docks into 1 continuous dock configuration and assemble 2 each adjacent in similar configuration. * Note- reassembly may require welding previously separated sections and leveling could require adjusting/shimming of leveling feet. 2. All work shall take place between the hours of 7:30am and 4:30pm, Monday through Friday, except on the following holidays which are normally observed by government personnel: New Years Day, Martin Luther King?s Birthday, President?s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran?s Day, Thanksgiving Day, Christmas Day, and any other day designated by the Air Force, Federal Statue, Executive Order, and/or Presidential Proclamation. Hours may be adjusted as necessary by the Government and will be coordinated in writing with the Contractor prior to changes. 3. The Contractor shall clean up each work site at the end of each work day. Upon completion of the work, all material, equipment, and debris shall be removed from the site and the areas shall be left in a neat and satisfactory condition.