Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on August 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J041--558-22-172, Replace Chillers in AHU 1 and 2

Closed
36C24626B0029Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 11 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract is a firm fixed-price solicitation issued by the Department of Veterans Affairs through Network Contracting Office 6 for the replacement of chillers serving Air Handler Units 1 and 2 at the Durham VAMC in North Carolina. The project, identified by project number 558-22-172 and solicitation number 36C24626B0029, is a total service-disabled veteran-owned small business (SDVOSB) set-aside under NAICS code 236220 with an estimated value between $1,000,000 and $5,000,000. Only contractors certified in the SBA VetCert database as SDVOSBs and registered in the System for Award Management (SAM) with active status are eligible to respond. The work includes full replacement of chillers, associated pumps, glycol make-up systems, energy management controls, and related electrical upgrades, with all new equipment required to conform to VA Specification 23 09 23 and be integrated into existing controllers. The project must be completed within 270 days of the notice to proceed, and all work must be performed while maintaining uninterrupted 24/7 operations of the medical facility. Construction activities must be carefully phased across first, second, and third shifts, with any utility outages—including electrical, water, steam, or fire protection systems—requiring written approval at least 20 days in advance and scheduled only during second shift or weekends. Contractors must submit detailed phasing plans for COR approval and provide weekly progress meeting minutes. No materials may be stored on-site without COR authorization. All personnel must wear approved identification, comply with lock-out tag-out procedures, and adhere to NFPA standards for hot work and egress. Daily notification of personnel arrival and departure is mandatory, and any damage to existing facilities must be restored to original condition. As-built drawings must be submitted in PDF format with contractor markups. Access to all solicitation documents is restricted to the SAM Contract Opportunities website, and no telephonic requests for information are permitted. The only designated point of contact for all inquiries is Contract Specialist Alice Custis.

General Info

SDVOSB set-aside for chilled chiller replacement on VA roof, firm-fixed-price, SAM.gov and VetCert required.

Agency

Department Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)View Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Durham, NC, 27705, USA

Set-Aside

SDVOSBC

Documents

(10)

36C24626B0029+0004+posting+abstract+08312026.pdf

PDF

Amendment 0002 to Solicitation 36C24626B0029 - Availability of Funds

PDFamendment

36C24626B0029 Replace Chillers in AHU 1 and 2 - Presolicitation Notice

DOCXpresolicitation

CML 155-01-0501/5 sign-in sheet

PDFother

558-22-172 VA Durham Replace Chillers Drawings

PDFdrawings

IFB 36C24626B0029 Replace Chillers Durham VAMC

PDFifb

558-22-172 Seismic Restraint Requirements for Non-Structural Components

PDFsow

Amendment 0003 - RFI Responses and Revised Seismic Specs

PDFamendment

Amendment 0001 to Solicitation 36C24626B0029 - Site Visit Map

PDFamendment

Durham VAMC Replace Chillers Final Bid Specifications 36C24622C0080

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Response Deadline

Deadline has passed

Amendment 4

Contract was updated

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)
Contacts1 person available
OfficeHAMPTON, VA, 23667, USA
Organization / Agency
Department Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)
View Agency Profile
Office AddressHAMPTON, VA, 23667, USA
Contacts
Alice CustisContract Specialist

Full Description

Show more

STATEMENT OF WORK


Project Number: 558-22-172  Replace Chillers for AHU 1 and 2



  1. Scope: 
    1. The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications. 


  1. Construction Period -
    1. Pre-Construction Meeting:   Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed. 
    2. Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants.
      • Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting.
    3. As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats.


  1. Hours of Operation and Phasing:
    1. Construction should be phased and timed such that:
      • General Operation of the affected areas is not interrupted
        • The facility operates on a 24-hour, 7 day per week schedule
        • Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR.
        • Contractor to develop and coordinate phasing plan with input from staff and final approval of COR.
    2. Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date.


  1. Storage: No storage of any material will be allowed on VA property unless approved by the COR.


  1. Period of Performance: Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP).


  1. Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR.  Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements.  When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval.  The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption.


  1. General Requirements
    1. The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site.
    2. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.  Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space.
    3. Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements.  Minimize disruptions and coordinate with COR.
    4. All buildings will be occupied during performance of work.  Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered.  Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period.
    5. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B.  Coordinate with COR.  Obtain permits from facility Safety Manager at least 48 hours in advance.
    6. New work shall be installed and connected to existing work neatly, safely and professionally.  Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors.  Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior condition.
    7. The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project.


END OF SCOPE OF WORK

More opportunities from Department Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)

Same awarding agency

NAICS: 238220
New
Federal
J041--HVAC PREVENTIVE MAINTENANCE AND REPAIR Hampton VA Medical Center
Solicitation # 36C24626Q0930
Solicitation 36C24626Q0930 is a request for quotes from the Department of Veterans Affairs Network Contracting Office 6 for HVAC preventive maintenance, service, and repair at the Hampton VA Medical Center in Hampton, Virginia. This acquisition is specifically set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS code 238220. The scope of work includes routine preventive maintenance and parts per manufacturer specifications, as well as non-routine and emergency repair services with an annual cap of 300,000 dollars for repairs. The contract is structured with a base period from October 1, 2026, to September 30, 2027, and three subsequent one-year options, with a total maximum duration not to exceed five years. The government will award the contract to the responsible offeror whose proposal is most advantageous, evaluating technical capability, past performance within the last three years, and total price. Technical requirements include the submission of a detailed preventive maintenance and service plan and proof of certification within the last year for Trane Centravac, York Centrifugal, and Magnetic Bearing Chiller equipment. Performance will be monitored via a Quality Assurance Surveillance Plan utilizing direct observation, periodic inspections, and customer complaint reviews. Offerors must submit their quotes by September 16, 2026, at 12:00 PM EDT, adhering to a 25-page limit for the proposal. Required insurance includes general liability of 500,000 dollars per occurrence and automobile liability of 500,000 dollars per occurrence.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
Federal
Z2DA--Renovate Space for Patient Care Improvements
Solicitation # 36C24626B0038
The Network Contracting Office 6 is preparing to issue a restricted Invitation for Bid for the renovation of approximately 3,500 square feet of clinical space on the first floor of Building 47 at the Western North Carolina VA Health Care System. The project involves upgrading ENT and Podiatry patient care areas, establishing a new waiting area, modernizing exam rooms, expanding storage, and ensuring all work complies with current building codes and VA design standards. The work must adhere strictly to the construction drawings and VA Final Bid Specifications. The contract is classified under NAICS code 236220 with a size standard of $45 million, and the estimated value ranges between $1 million and $2 million. The solicitation will be issued as a 100% set-aside exclusively for Service-Disabled Veteran Owned Small Businesses, but participation is contingent upon sufficient interest; failure to attract qualified SDVOSBs may lead to cancellation of the set-aside. Interested firms must be certified in the SBA’s database and registered in SAM.gov to be eligible for award, with no paper copies of documents provided. A Pre-Bid Site Visit is tentatively scheduled for September 15, 2026, at 2:00 PM EST, and potential bidders must RSVP by September 7, 2026, via email to Quentin Norvell at the VA. Attendance is not mandatory but strongly recommended and bidders are responsible for bringing all necessary personnel, tools, and materials. The formal solicitation is expected to be released on August 27, 2026, with bids due by September 30, 2026, although the deadline posted in the data reflects an earlier date which may be a placeholder or error. All contract documents, including amendments, will be accessible solely through SAM.gov, and bidders must regularly monitor the site for updates. No reimbursement will be provided for costs associated with site visits or bid preparation, and failure to register in SAM.gov or verify SDVOSB status will result in disqualification from award consideration.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS