J041--FY27 NRM | 460-26-011 - CON Replace West Entrance Return Air Gan | NCO 4 Construction East (VA-26-00069614)
Open
36C24426B0025FederalResponse Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Place of Performance
Set-Aside
SDVOSBC
Documents
1DOCX
DOCX
AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Everything you need to bid on this one
Open the full contract in your free workspace.
- 1 solicitation documentRead every page
- Buyer contactEmail and phone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
PhasePresolicitation
Posted
Presolicitation
Response Deadline
Submission deadline
Response Deadline
Organization & Contact Information
Show more
AgencyDepartment Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)
Contacts1 person available
OfficePITTSBURGH, PA, 15215, USA
Organization / AgencyDepartment Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)
Office AddressPITTSBURGH, PA, 15215, USA
Contacts
Britiney RichContract Specialist
Full Description
Show more
VA Medical Center Wilmington intends to issue a construction contract. The project consists of:
The Contractor shall provide all labor, transportation, materials, equipment, and supervision required for Replace West Entrance Return Air Fan as required at the Wilmington VA Healthcare System, located at 1601 Kirkwood HWY, Wilmington, Delaware 19805.
Replace West Entrance Return Air Fan Area is located on the roof of Building 17. Work to take place during normal working hours. Provide correct size crane per lift requirements. Remove existing failed Return Air Fan. Disconnect Electrical power, control signal cabling Install new Return Air Fan ( provided by the VA). COOK Model Number 245QMXD11 900 lbs shipping weigh (see Atch 1)
Properly dispose of old return air fan. Perform all necessary commissioning and startup of new equipment. All work to be performed in accordance with manufacturer s recommendations and guidelines. All Federal and State Safety and Environmental guidelines shall be followed. Work to be conducted during normal working hours. Extended hours may be arranged if necessary to fully complete performance of the work. The contractor will need to provide a certified crane operator to remove the old parts and install the new fan motor and housing parts on the roof top. Crane lift plan to be submitted, reviewed and approved by COR prior to commencement of work. Verification that return fan remains integrated into existing BAS system. Currently Johnson Controls speaking BACNET.
Work to be scheduled to interfere as little as possible with normal VA operations. Crane lift is to be performed off hours to ensure that NO personnel are below the area of swing during the crane lift evolution.
Other Specifics: Prime Contractor to plan all phasing of work in coordination with Hospital staff in order to minimize down-time to areas affected by the project. Construction Waste Management, Specification 01 74 19 is to be included. Prime Contractor to maintain all infection control/ dust prevention measures required. Consolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process. Contractor will submit picture of affected area before, during, and after construction or testing.
Replace West Entrance Return Air Fan Area is located on the roof of Building 17. Work to take place during normal working hours. Provide correct size crane per lift requirements. Remove existing failed Return Air Fan. Disconnect Electrical power, control signal cabling Install new Return Air Fan ( provided by the VA). COOK Model Number 245QMXD11 900 lbs shipping weigh (see Atch 1)
Properly dispose of old return air fan. Perform all necessary commissioning and startup of new equipment. All work to be performed in accordance with manufacturer s recommendations and guidelines. All Federal and State Safety and Environmental guidelines shall be followed. Work to be conducted during normal working hours. Extended hours may be arranged if necessary to fully complete performance of the work. The contractor will need to provide a certified crane operator to remove the old parts and install the new fan motor and housing parts on the roof top. Crane lift plan to be submitted, reviewed and approved by COR prior to commencement of work. Verification that return fan remains integrated into existing BAS system. Currently Johnson Controls speaking BACNET.
Work to be scheduled to interfere as little as possible with normal VA operations. Crane lift is to be performed off hours to ensure that NO personnel are below the area of swing during the crane lift evolution.
Other Specifics: Prime Contractor to plan all phasing of work in coordination with Hospital staff in order to minimize down-time to areas affected by the project. Construction Waste Management, Specification 01 74 19 is to be included. Prime Contractor to maintain all infection control/ dust prevention measures required. Consolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process. Contractor will submit picture of affected area before, during, and after construction or testing.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
