Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on May 14, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J056--598-21-3-1111-0027 Environmental Cleanup of buildings 33 & 38 (598-21-127)

Awarded
36C25621Q0757Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project, necessitated by a sprinkler system failure, requires the remediation of mold throughout the entire building and the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key deliverables include the provision of a Certified Industrial Hygienist, a detailed mold remediation plan featuring HEPA filtration and negative air pressure, and a one-year workmanship guarantee. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal with a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include attendance at the site pre-bid walk-through and the provision of specific insurance coverages, including automobile liability and workers compensation. Performance must begin within 14 days of the Notice to Proceed, and the contractor must adhere to Davis Bacon Act wage determinations. Payment terms are Net 30.
Atterbury Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The Department of Veterans Affairs awarded contract 36C25621C0086 to Wolverton Property Management LLC for the environmental cleanup of Buildings 33 and 38 at the Central Arkansas Veterans Healthcare System. The project, valued at 36,998.50 dollars, was set aside for Service-Disabled Veteran-Owned Small Businesses. The work is required following a weather event where freezing temperatures caused pipes to burst, resulting in interior water damage to both unoccupied facilities. The scope of work involves professional construction and remediation services, including the removal and disposal of debris, peeling paint, and hazardous materials. Because of the age of the buildings, the contractor must manage assumed lead-based paint and confirmed asbestos-containing materials, specifically vinyl composition tile and mastic. Key tasks include scraping paint, demolishing bathroom partitions and ceiling grids, and removing carpet tiles. The contractor is responsible for all labor, materials, and safety certifications, ensuring compliance with OSHA, EPA, and VA security and health protocols, including COVID-19 masking and screening guidelines. Work is restricted to normal operational hours, and final acceptance is contingent upon a two-stage government inspection process.

General Info

Contract Value

$30,147.14

NAICS

562910 - Remediation Services

Place of Performance

MS, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

1

Award Notice 36C25621C0086 - Wolverton Property Management LLC

DOCX, Low priority1 page · award
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Apr 30, 2021 to May 3, 2021.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 256-NETWORK Contract Office 16 (36C256)
Contacts1 person available
OfficeRIDGELAND, MS, 39157, USA
Office AddressRIDGELAND, MS, 39157, USA
Contacts

Full Description

Show more
1.0 GENERAL INFORMATION 1. Title of Project: Environmental Clean Up of Buildings 33 & 38 Background: There was a weather event with sustained temperatures below freezing for several days. As a result, pipes froze and burst creating some water damage to the interior of buildings 33 and 38. 2. The intent of this solicitation is to select a contractor to provide professional construction services to "clean up the damaged areas." 3. Contractor shall clean up the areas identified in buildings 33 & 38. Contractor shall furnish all labor, materials, tools, and expertise to perform the work necessary. 4. Offices of CAVHS Engineering Planning and Design Office will render certain technical services during construction. Such services shall be considered as advisory from the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative. 5. All employees of general contractor and subcontractors shall comply with VA security management program, be identified thru proper badging by project/employer, and be restricted from areas of unauthorized access. 6. Special Consideration: All contractors and visitors are required to adhere to Universal Masking Guidance which requires people to wear a cloth face covering or facemask over their mouth and nose while in any building of Central Arkansas Veterans Healthcare System (CAVHS). Daily healthcare screening is required before entrance to VA facilities due to COVID-19. No one with a cold or flu like symptoms will be allowed on VA property. In the event that symptoms occur while on site, the contractor will notify the COR immediately. The individual(s) maybe required to be COVID tested and quarantine until released by Infection Control to return to site. 1.1 DESCRIPTION OF WORK The Contractor shall provide all management, supervision, qualified personnel, labor, transportation, tools, equipment, taxes, materials, licenses, permits, insurance, certifications, safety data sheets, clearance certifications, and services required to clean up the affected 4 areas in building 33 and 38 that were damaged from broken water pipes. The contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS). Contractor shall comply with all State of Arkansas, federal, and local requirements to include but not limited to Occupational Safety and Health Administration (OSHA), Arkansas Department of Health, Environmental Protection Agency (EPA), and Department of Transportation (DOT). All workmanship shall comply with all applicable codes, specifications, local ordinances, and be in general accordance with industry standards. 1.2 SCOPE OF WORK 1.2.1 Building 33 a. Building 33 is a 7,017 SF facility and was built in 1893. Due to the age of the facility, there is an assumption that the facility contains lead-based paint (LBP). Some flooring has vinyl composition tile (VCT) and mastic which has been identified as asbestos containing material (ACM). Contractor shall insure that all workers be properly certified on the dangers of lead-based paint and ACM and take all precautions necessary as required by State, Local and Federal agencies. Removal and disposal VCT containing ACM will be required in this contract. b. This will be for interior work only. The facility is unoccupied and remain unoccupied for the duration of the project. c. Interior. i. Contractor shall scrape and dispose all peeling and flaking paint on door frames, window frames, walls, ceilings, base molding, trim, and molding on wainscots. ii. Contractor shall demo and dispose of bathroom partitions, vanities, ACM floor tile and mastic, ceiling tiles and grids, exhaust vent duct, and flaking plaster. iii. Contractor shall clean up existing debris in all work locations. iv. Contractor shall test any areas where VCT is to be removed for asbestos and turn over results to the COR. V. Contractor shall test homogeneous areas where paint is to be scarped and turn test results over to the COR. 5 1.2.2 Building 38 a. Building 38 is 1584 SF facility and was built in 1908. Due to the age of the facility, there is an assumption that the facility contains lead-based paint. Some flooring has vinyl composition tile and mastic which has been identified as asbestos containing material (ACM). Only the carpet tiles are to be removed which are glued to the VCT with releasable glue. Contractor shall insure that all workers be properly certified on the dangers of lead-based paint and ACM and take all precautions necessary as required by State, Local and Federal Agencies. b. This will be for interior work only. The facility is unoccupied and remain unoccupied for the duration of the project. c. Interior. i. Contractor shall scrape and dispose all peeling and flaking paint on door frames, window frames, walls, and ceilings per drawings. ii. Contractor shall remove carpet tiles and adhesive and remove ceiling tiles. iii. Contractor shall clean up existing debris in all work locations. 1.2.3 Variations in quantity a. The quantities and locations of ACM as indicated on the drawings and the extent of work included in this section are estimated which are limited by the physical constraints imposed by occupancy of the buildings and accessibility to ACM. Accordingly, minor variations (+/- 10 percent) in quantities of ACM within the regulated area are considered as having no impact on contract price and time requirements of this contract. Where additional work is required beyond the above variation, the contractor shall provide unit prices for newly discovered ACM and those prices shall be used for additional work required under the contractor.6 1.2.3 STOP ASBESTOS REMOVAL a. If the Contracting Officer; their field representative; the facility Safety Officer/Manager or their designee, or the VA Professional Industrial Hygienist/Certified Industrial Hygienist (VPIH/CIH) presents a verbal Stop Asbestos Removal Order, the Contractor/Personnel shall immediately stop all asbestos removal and maintain HEPA filtered negative pressure air flow in the containment and adequately wet any exposed ACM. If a verbal Stop Asbestos Removal Order is issued, the VA shall follow-up with a written order to the Contractor as soon as it is practicable. The Contractor shall not resume any asbestos removal activity until authorized to do so in writing by the VA Contracting Officer. A stop asbestos removal order may be issued at any time the VA Contracting Officer determines abatement conditions/activities are not within VA specification, regulatory requirements or that an imminent hazard exists to human health or the environment. Work stoppage will continue until conditions have been corrected to the satisfaction of the VA. Standby time and costs for corrective actions will be borne by the Contractor, including the VPIH/CIH time. The occurrence of any of the following events shall be reported immediately by the Contractor s competent person to the VA Contracting Office or field representative using the most expeditious means (e.g., verbal or telephonic), followed up with written notification to the Contracting Officer as soon as practical. The Contractor shall immediately stop asbestos removal/disturbance activities and initiate fiber reduction activities if: Airborne PCM analysis results equal to or greater than 0.01 f/cc above background levels inside the building but outside the regulated area; breach or break in regulated area containment barrier(s); less than 0.02 inch WCG pressure in the regulated area; serious injury/death at the site; fire/safety emergency at the site; respiratory protection system failure; power failure or loss or inadequate use of wetting agent; any visible emissions observed outside the regulated area; or failure to follow project specification requirements 1.3 FIRE SAFETY7 A. Establish and maintain a site-specific fire protection program in accordance with 29 CFR 1926. B. Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241. C. Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR. D. Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. E. Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 518. Coordinate with COR to obtain permits from fire department at least 8 hours in advance. Designate contractor's responsible project-site fire prevention program manager to permit hot work. F. Prevent smoke detectors accidental operation. Remove temporary covers at end of work operations each day. G. Smoking is prohibited in all VA facilities and on grounds. 1.4 PROJECT AREA LIMITATIONS A. All site work shall be performed on Hill Road at the rear gateway into Ft. Roots. 1.5 CONSTRUCTION SECURITY REQUIREMENTS A. The Hill Road is closed at this gate location and normally, no vehicles will be passing through this area during construction. B. Barricades must be placed at the gate opening sufficient to prevent unauthorized traffic from entering the campus. 1.6 OPERATIONS AND STORAGE AREAS A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance. Workmen are 8 subject to rules of Medical Center as applicable to their conduct. Plan and execute the work with minimal impact to the normal functioning of Medical Center as a whole, including patient care, operations of utility services, fire protection systems and any existing equipment, and with work being done by others. B. There are no storage areas assigned to this project. Provide unobstructed access to Medical Center areas required to remain in operation. 1.7 PHASING No phasing on this project. 1.8 INFORMATION SYSTEMS OFFICER, INFORMATION PROTECTION The contractor will/will not have access to VA Desktop computers and they will/nor will they have access to online resources belonging to the government while conducting services. If removal of equipment from the VA is required, any memory storage devices, such as hard drives, solid state drives and non-volatile memory units will remain in VA control and will not be removed from VA custody. 1.9 PRIVACY OFFICER The contractor will/will not have access to protected Patient Health Information (PHI) and they will/nor will they have the capability of accessing patient information during the services provided to the VA and if removal of equipment from the VA is required, any memory storage devices, such as hard drives, solid state drives and non-volatile memory units will remain in VA control and will not be removed from VA custody. All research data available for Contractor analyses is de-identified. 1.10 RECORDS MANAGER a. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228. b. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. 9 c. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records. d. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. e. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. f. The Government Agency owns the rights to all data/records produced as part of this contract. g. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. 1.11 HOURS OF WORK A. Normal operational hours for the North Little Rock Central Arkansas Veterans Healthcare System are Monday through Friday from 7:30am 4:30pm. Use of overtime is not applicable. 1.12 ACCEPTANCE A. Pre-Final Inspection: The Government will perform the Pre-Final Inspection to verify that the facility is complete and ready to be occupied. A Government Pre-Final Punch List may be developed as a result of this inspection. Ensure that all items on this list have been corrected before notifying the Government, so that a Final Acceptance Inspection with the customer can be scheduled. Correct any items noted on the Pre-Final Inspection in a timely manner. These inspections and any deficiency corrections required by this paragraph need to be accomplished within the time slated for completion of the entire work or any increment of the work if the project is divided into increments by separate construction completion dates. B. Final Acceptance Inspection: The Contractor s QC Inspection personnel, plus the superintendent or other primary management person, and the Contracting Officer s Authorized designee is required to be in attendance at the Final Acceptance Inspection. Additional Government personnel can also be in attendance. The Final Acceptance Inspection will be formally scheduled by the Contracting Officer s or Authorized designee 10 based upon results of the Pre-Final Inspection. Notify the Contracting Officer through the COR office at least 14 days prior to the Final Acceptance Inspection and include the Contractor s assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date schedule for the Final Acceptance Inspection. Failure of the Contractor to have all contract work acceptably complete for this inspection will be cause for the Contracting Officer to bill the Contractor for the Government s additional inspection cost in accordance with FAR Clause 52.246-12 titled Inspection of Construction

More opportunities from Department Of Veterans Affairs → 256-NETWORK Contract Office 16 (36C256)

Same awarding agency

NAICS: 238290
New
Federal
N099--JLM Roll Up Door Replacement
Solicitation # 36C25627Q0092
Solicitation 36C25627Q0092 is a combined synopsis and request for quote issued by the Department of Veterans Affairs for the replacement of a motorized roll-up door at the John L. McClellan Veterans Hospital. This is a 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238290. The project requires the contractor to provide all labor, tools, and equipment, including a scissor lift and forklift, to remove and dispose of the existing door and install one grey 7 by 9 foot motorized rolling steel rapid slat door with insulated slats and an obstruction safety device. The award will be a firm-fixed-price contract with a performance period of 30 days from the Notice to Proceed and includes a one-year warranty. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation process, focusing on technical capability, price reasonableness, and the completion of the VA Notice of Limitations on Subcontracting. Interested offerors must submit a three-volume quote package consisting of technical capabilities, a completed price schedule, and the required VAAR certification. Quotes must be emailed to Joseph Warren by 3:00 PM CST on November 18, 2026. A site visit is scheduled for November 6, 2026, at 10:00 AM, and all inquiries must be submitted by November 10, 2026. Performance will take place at the Central Arkansas Veterans Healthcare System in North Little Rock, Arkansas, and contractors must comply with all OSHA, ANSI, CAN, and UL standards.
Other Building Equipment Contractors

POSTED

about 16 hours ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS