Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Jack London Square Webster Street Outfall Pipe Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Permittee will replace a 160-foot section of damaged 54-inch steel corrugated pipe along the Webster Street outfall in Jack London Square, Oakland, with a new 52-inch steel corrugated pipe of the same length. Restoration efforts include installing metal pipe joint bands every 20 feet, each lined with rubber to ensure a secure fit without the use of sealant. These bands will be anchored to existing concrete using 6- to 8-inch metal stakes, which require no backfilling, ensuring minimal disruption to surrounding infrastructure. All materials—including the new pipe, rubber liners, joint bands, and metal stakes—will be installed manually using portable hand tools, avoiding heavy machinery and reducing environmental impact. No materials or pollutants will be discharged into San Francisco Bay, maintaining strict compliance with water quality standards. The work is authorized under the jurisdiction of the Regional Water Quality Control Board, Region 2 – San Francisco Bay, and the project is managed by Water Resource Control Engineer Nathaniel Goetz.

General Info

Replace 160-foot 54-inch pipe with 52-inch steel pipe using manual tools, rubber bands, and stakes, no discharge into bay.

Agency

California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Oakland, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Office AddressN/A
Contacts
Nathaniel GoetzWater Resource Control Engineer

Full Description

Show more
The Permittee will conduct maintenance and repair work along the damaged Jack London Square Webster Street outfall pipeline in the City of Oakland, Alameda County (37.793167, -122.275083). Maintenance activities include replacing the damaged steel corrugated pipe with a new steel corrugated pipe and installing metal pipe joint bands and stakes to support the new pipe. The 160-foot-long and 54-inch-wide damaged pipe will be replaced with a new 160-foot-long and 52-inch-wide pipe. The metal pipe joint bands will be installed every 20 feet and anchored to concrete with 6- to 8-inch metal stakes for structural support. Metal pipe joint bands include a layer of rubber between the pipe and joint band and will require no sealant. The metal stakes will be anchored into concrete and require no backfilling. Materials used will include the corrugated steel pipe, rubber liners for the pipe joint band, pipe joint bands and metal stakes, and will be installed by hand using portable carpentry hand tools. There will be no discharge of material or pollutants into San Francisco Bay (Bay).

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 10 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 10 hours ago

DEADLINE

in about 22 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS