Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Cherokee Nation was posted on March 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Jay Commercial Laundry Long-Lead Parts

Closed
164452State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423440
New
Los Angeles Job Corps- Dishwasher Replacement
Solicitation # Los Angeles Job Corps Commercial Dishwasher Replacement
Management & Training Corporation (MTC) is seeking a subcontractor to provide, deliver, and support the installation of a new commercial high-temperature door-type dishwasher for the Los Angeles Job Corps Center food service operation. The scope of work includes a dishwasher with a factory-installed booster heater capable of a 180-degree sanitizing rinse cycle and a compatible drain water tempering kit. All equipment must be NSF listed, cULus certified, and ENERGY STAR rated, with electrical requirements of 208V, 60Hz, single phase, and approximately 78 amps. The award will be based on best value, and the estimated lead time for delivery is four to six weeks after the order is placed. This opportunity is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Bidders must operate under NAICS code 423440 and provide a bid sheet, a completed supplier packet including a W-9 and self-certification form, three professional references, and proof of insurance. Subcontractors must comply with Service Contract Labor Standards per Wage Determination WDW# 2015-5613 Rev 31 and must acquire a Unique Entity Identification number for reporting. All bids and supporting documentation must be submitted via email by 3:00 PM PT on November 30, 2026.
Los Angeles Job Corps

POSTED

about 3 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Cherokee Nation Entertainment, LLC., a wholly owned company of the Cherokee Nation, is soliciting proposals from qualified bidders for the supply of long-lead parts related to Jay commercial laundry equipment. This procurement opportunity, identified under solicitation number Procurement #164452, was posted on March 31, 2026, with a response deadline of April 3, 2026. The contract is categorized under the Cherokee Nation’s state, local, and educational agencies (SLED) organization type, with no specified set-aside designation or NAICS code. Interested parties are invited to submit their proposals within the tight timeframe indicated. The point of contact for this solicitation is Rebecca Scheufler, who can be reached at [phone hidden], providing a direct communication channel for questions or clarifications. Further details and submission guidelines are available through the Cherokee Nation’s procurement portal, ensuring transparent access to all relevant contract information. The contract focuses on supplying essential parts that are critical for the maintenance and operation of commercial laundry machinery under the Jay brand, highlighting the need for specialized components with potential long lead times.

General Info

Cherokee Nation seeks bids for Jay laundry equipment parts, deadline April 3, 2026, contact Rebecca Scheufler.

Place of Performance

OK, USA

Set-Aside

tribal_set_aside

Documents

2
PDF, High priority: read this firstrfp
High
PDF

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Los Angeles Job Corps- Dishwasher ReplacementOpen now, due in 9 days
  • Commercial Refrigerator Supply (Traulsen RRI232HUT-FHS)Open now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCherokee Nation
Contacts1 person available
OfficeN/A
Organization / AgencyCherokee Nation
Office AddressN/A

Full Description

Show more
Cherokee Nation Entertainment, LLC. (CNE), a wholly owned tribal company of the Cherokee Nation, is seeking proposals from qualified bidders for: Long-lead laundry parts.

More opportunities from Cherokee Nation

Same awarding agency

NAICS: 541620
New
SLED
SEALED RFP - LEAD SERVICE LINE INVENTORY SPECIALISTS PHASE II
Solicitation # Procurement #165068
The Cherokee Nation is seeking sealed proposals from qualified consulting firms to provide technical assistance to up to 60 small community water systems within the Cherokee Nation Reservation in northeast Oklahoma. The primary objective of this project is to help these systems develop, refine, and verify their service line inventories in accordance with EPA Lead and Copper Rule Revisions (LCRR) and Improvements (LCRI), as well as Oklahoma Department of Environmental Quality (ODEQ) requirements. The scope of work includes records review, data management, statistical analysis, customer engagement, non-invasive field inspection, and targeted water sampling, though it specifically excludes any excavation or potholing. Key deliverables include the creation of service line replacement plans for systems with lead or unknown status lines and support for public education and notification requirements. The contract performance period is expected to run from the date of execution through November 1, 2027. Proposals must be submitted by December 18, 2026, and will be evaluated based on a 100-point scoring system, with the highest score receiving the award. Applicants must provide an outline of costs, proof of at least three similar previous projects, and a valid Oklahoma Business License. Indian preference is granted to respondents who provide current certification from the Cherokee Nation Tribal Employments Office (TERO). Required insurance coverages include General Liability, Professional Liability, Pollution Liability, and Automobile Liability, all written with an AM Best A X rated carrier. There is no specific set-aside status for this solicitation.
Environmental Consulting Services

POSTED

2 days ago

DEADLINE

in 27 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS