Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on July 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Jervis Gutter Installation

Closed
2111957State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems and lighting controls. The project also requires correcting plumbing deficiencies and installing new safety stair treads in all stairwells. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price reasonableness alongside past performance and corporate relevant experience. Contractors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict material handling, labeling, and waste management standards. Compliance with the Americans with Disabilities Act, Buy American requirements, and prevailing wage rates for Glynn, Brantley, and McIntosh counties is mandatory. Proposals must be submitted electronically in PDF and Excel formats to the contracting officer by the specified deadline.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the work includes replacing electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. The government will evaluate offers based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must comply with the Buy American statute and the Davis-Bacon Act. Bonding requirements are tiered by proposal value, with projects over 150,000 dollars requiring bid, payment, and performance bonds. Technical execution requires certified specialists for protective coatings, welding, and firestopping, with strict quality control managed through a three-phase process and documented via a Contractor QC Plan. Invoicing is processed monthly through Wide Area WorkFlow with various supporting certifications and reports required for payment.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside or Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline is November 4, 2026, with the primary point of contact being Richie Tran. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise (DBE) Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment activities, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit proof of these specific efforts within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other GFE requirements must be completed before the bid opening.
RT CONTRACTOR CORP

POSTED

about 1 hour ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders are requested to provide pricing for a wide array of trades, ranging from demolition and structural steel to mechanical, electrical, and plumbing services. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as replacing and painting drywall and ceilings, installing new flooring and rubber wall bases, and performing necessary electrical repairs and vanity or cabinet replacements. The total period of performance is 105 days, with substantial completion required within 90 days of the Notice to Proceed and final completion within an additional 15 days. This opportunity is set aside for Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, compliance with NFPA-101, OSHA, and EPA regulations, and adherence to Davis-Bacon Act wage rates. Contractors must provide a one-year guarantee on workmanship and maintain specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. The project is set as a small business set-aside and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide a detailed proposal including relevant experience, a safe work method description covering project phasing and occupied-building protection, and itemized pricing by room and trade. Pricing must remain firm for 60 days and include separate costs for materials, labor, permits, and disposal. Awardees are required to provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of award. Deliverables include a project schedule, safety plan, and a minimum one-year workmanship warranty upon final acceptance by CSD. Performance is expected to occur between February 1, 2024, and March 31, 2024.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This contract involves the installation of gutters at a specified location in Thiells, NY, with a scope of work outlined in attached documents. Vendors are required to attend a mandatory site visit scheduled for either July 29 or July 30, 2024, and must confirm attendance beforehand. The project will be awarded through a request for quotes process, prioritizing responsible vendors offering the lowest cost that meet all scope requirements. Submission deadlines are set for August 8, 2024, at 12:30 PM, with quotes to be sent via email preferred. The contract mandates a one-year warranty covering both materials and labor, and prohibits subcontracting for this work. All vendors must demonstrate at least two years of relevant experience, provide proof of liability and workers’ compensation insurance, and adhere to prevailing wage laws as specified under NYS Labor Law Schedule PRC #: 2024008834. Certified payroll records are required for payment, and the awarded contractor must complete and submit necessary legal and insurance documentation promptly. The project must be completed within 30 days of receiving the purchase order, and the contract will be awarded to the most responsible and lowest-cost responsive vendor, with the possibility of rejection of any quotes that do not meet the specified requirements.

Documents

7

Cost Breakdown Form - Jervis Gutter Installation

XLSX, High priority: read this firstrfq
High

DOL Certified Payroll Form WH-347

PDF, High priority: read this firstwage-determination
High

Jervis Gutter Installation RFQ (HV24013)

PDF, High priority: read this firstrfq
High

Prevailing Wage Schedule - Gutter Installation (PRC# 2024008834)

PDF, High priority: read this firstwage-determination
High

Quote Proposal Form - Jervis Gutter Installation (SFE# HV24013)

DOCX, High priority: read this firstrfq
High

NYS Finance Law §139-j and §139-k Compliance Forms

PDF, Low prioritysupporting-documents
Low

NYS Office of the State Comptroller Substitute Form W-9

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → NYS Office for People with Developmental Disabilities
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Mary Sorensen-WalshBusiness Officer 1

Full Description

Show more
Please see attached scope of work and general requirements in the documents tab. *Note contractor is to provide and supply a 1-year warranty on material and labor. * Dear Vendor: Enclosed is a request for quotation (RFQ) to preform the attached scope of work.  Mandatory site visit will be held either Monday, July 29nd, 2024 @ 9:30 AM or Tuesday, July, 30th 2024 @ 1:00 PM at the above address. Please confirm your attendance prior to the site visit by contacting John Knopf, MSII +1 (555) 000-0000 or via email at contact@example.gov.  Attendance will be recorded.  Please be sure to sign the sign in sheet (provided by the Maintenance staff conducting the site visit).  The sign in sheet is a separate entity from the resident visitor’s log.  When signing in, be sure to check the project name listed on the sign in sheet to ensure you are recording your attendance correctly.  Failure to do so will cause out to be ineligible to submit a quote.  There are no exceptions.  Please write clearly for corresponding purposes and make sure you include an email address and phone number where you can be reached.  Late arrivers at the site will not be allowed to sign in, participate, nor submit a quote for this project.  If you are unable to attend either day, you will not be able to schedule a site visit at different time.   Method of Award: This is an RFQ (request for quotes).  This is not an IFB (bid).  The Hudson Valley DDSO intends to award the contract to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work.  Upon request, vendor must demonstrate 2 years of relevant experience on prior projects of similar magnitude and its subject to vendor responsibility determination.  Hudson Valley DDSO reserves the right to reject any and all quotes.  In deciding whether to submit a quote, please be aware the awarded vendor must adhere to the time frames outlined in the scope of work.  The awarded vendor will also be required to submit certificates of Liability Insurance and Worker’s Compensation Insurance as well as completed Lobbying Law Forms, and signed Appendix A.  Please be prepared to submit these in a timely fashion.  The Hudson Valley DDSO will make no concessions to the vendor for any alleged misunderstanding or deception because of quantity, quality, character, or other condition.  The Hudson Valley DDSO’s interpretation of specifications shall be final and binding.  Please note, all staff working at the project site will be required to sign an attendance sheet for record purposes.  This includes the residence visitor log and/or an attendance sheet provided by the Maintenance Department. In the event of a tie, contract will be awarded to the Contractor whose bid was received earliest.   Prevailing Wages:  Schedule PRC #: 2024008834 NYS Labor law requires that all contracted employees performing maintenance, repairs or capital improvements in state owned buildings receive the prevailing wage and supplements rate for the occupation in which they are working.  If this is a public work contract covered by Article 8 of the Labor Law or a building service contract covered by Article 9 thereof, neither Contractor's employees nor the employees of its subcontractors may be required or permitted to work more than the number of hours or days stated in said statutes, except as otherwise provided in the Labor Law and as set forth in prevailing wage and supplement schedules issued by the State Labor Department.  Furthermore, contractor must pay at least the prevailing wage rate or provide the prevailing supplements, including the premium rates for overtime pay, as determined by the State Labor Department in accordance with the Labor Law.  NYS law requires the vendor to keep detailed records for each person employed including name, address, telephone number, social security number, occupational classification in which worked, hourly wage rate paid, supplements provided, number of hours worked, and actual wages paid.  Certified payroll record/s MUST be submitted at the time of invoicing.  Effective April 28, 2008, if this is a public work contract covered by Article 8 of the Labor Law, the contractor understands and agrees that the filing of payrolls in a manner consistent with Subdivision 3-a of Section 220 of the Labor Law shall be a condition precedent to payment by the State of any State approved sums due and owing for work done upon the project. Without submittal of certified payroll record/s, payment will not be made. Information on prevailing wage can be found at:  www.labor.ny.gov *If you need any assistance understanding prevailing wages, please contact NYS DOL at +1 (555) 000-0000*   Subcontracting: OPWDD/Hudson Valley DDSO does not allow subcontracting on this type of work.   Submission of quote: All quotes (including a breakdown of materials, labor, and overhead) MUST be received in the Hudson Valley DDSO Business office by Thursday August 8th, 2024 @ 12:30 PM. The quotes may be hand delivered, mailed and or emailed as long as they are RECEIVED in the Business Office prior to the deadline.  EMAIL IS PREFERRED! Please check your submission for arithmetic errors and correct labor wages.  Hudson Valley DDSO reserves the right to reject any quote which does not reflect the correct prevailing wages in accordance with the provided wage schedule.  Tabulation of quotes will be posted to the listings on NYS Contract Reporter along with the award.   ADDRESS: Hudson Valley DDSO, Business office, 7 Wilbur Road, Thiells, NY 10984 EMAIL: contact@example.gov cc: contact@example.gov and contact@example.gov     At this time, we prefer the quote be emailed to: contact@example.gov cc: contact@example.gov and contact@example.gov     *BE SURE TO INCLUDE A COST BREAKDOWN AND LIST NUMBER WITH YOUR PROPOSAL* Service-Disabled Veteran-Owned Set Aside: No Due date:08/08/2024 12:30 PM Please note there is a mandatory scheduled site visit. When submitting your quote, be sure to include a cost breakdown (materials, labor, and overhead) and list number. Contract term: Within 30 days of receiving the purchase order County(ies): Rockland Location: 11 Wilbur Road, Thiells, NY 10984

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS