Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on February 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JFSD230068 REPAIR HVAC SYSTEM HYDRANT FUELING B658

Closed
JFSD230068Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Grand Forks AFB, ND, 58205, USA

Set-Aside

SBA

Documents

4

JFSD230068 - DSN-Repair HVAC System Hydrant Fueling B658 SOW

PDF, High priority: read this firstsow
High

JFSD230068 Questions and Answers

DOCX, High priority: read this first1 page · q-and-a
High

JFSD230068 Repair HVAC Hydrant Building B658 - AE Selection Criteria

PDF, High priority: read this firstspecifications
High

JFSD230068 - Repair HVAC System Hydrant Fueling B658 RFQ

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4659 319 Cons Pk
Contacts2 people available
OfficeGRAND FORKS AFB, ND, 58205, USA
Office AddressGRAND FORKS AFB, ND, 58205, USA

Full Description

Show more
Added Questions and Answers. 6 Feb 25 The Architect-Engineer (A-E) shall perform field reconnaissance, studies, site investigations, and a preliminary design meeting with the users, including travel and work required to obtain engineering information and design data to produce contract documents for this project. The Base Civil Engineering Project Manager will assist in scheduling design meetings. Building 658 is a 3800 sq ft hydrant fueling facility for jet fuel and includes significant fuels piping fed from the nearby outdoor storage tanks. Most of the space in the facility is a fuels piping bay. There is also a small control room and bathroom in the facility. The heating in building 658 is inadequate to maintain heat in the fuel bay. The bay is currently heated by 4 hydronic unit heaters, supported by a 400 MBH boiler which also supplies heat to the rest of the facility. The fuels piping bay eye wash station does not have sufficient accessible hot water. Current domestic hot water is supplied by a small on demand electric hot water heater, which appears to be inadequate. The fuel coming from these outdoor storage tanks cools the space when operations commence during winter months, providing additional heat load. The small control room and bathroom are not included as part of this project, though the heat load from the air handler and bathroom in this area will have to be considered for boiler sizing. Historical drawings for this facility have been lost. Site investigation and measurements will be critical to the success of this project.

More opportunities from Department Of Defense → FA4659 319 Cons Pk

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS