JFSD230068 REPAIR HVAC SYSTEM HYDRANT FUELING B658
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the Architect-Engineer (A-E) in conducting comprehensive field reconnaissance, studies, site investigations, and preliminary design meetings aimed at developing contract documents required to address issues within Building 658, a 3,800 square-foot hydrant fueling facility for jet fuel located at Grand Forks Air Force Base, North Dakota. This facility comprises a significant fuels piping bay and smaller sections including a control room and bathroom, though these latter areas are not part of the current project focus. The main issues identified include inadequate heating for the fuels piping bay, currently maintained by four hydronic unit heaters supported by a 400 MBH boiler that also services the entire facility, and insufficient hot water availability at the bay's eye wash station due to an underpowered on-demand electric hot water heater. The fact that historical drawings of the facility have been lost heightens the need for accurate site investigation and measurement, critical for the project’s success. Posted on February 6, 2025, the contract is a presolicitation under the Department of Defense, specifically managed by the Department of the Air Force and Air Combat Command. It is designated as a Total Small Business Set-Aside under the NAICS code 541330, focusing on engineering services. The deadline for response is February 12, 2025, at 4:00 PM Central Time. Contact points for the project include primary point Trenton Cott and secondary contact Monique Padilla, with both based at Grand Forks AFB. Important considerations for the project include scheduling design meetings with assistance from the Base Civil Engineering Project Manager and ensuring any updates account for additional heat load from operations, particularly during colder months. The contract aims to address the HVAC deficiencies to enhance the operational efficiency and safety of the hydrant fueling facility.
General Info
Place of Performance
Grand Forks AFB, ND, 58205, USASet-Aside
Documents
4AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Added Questions and Answers. 6 Feb 25
The Architect-Engineer (A-E) shall perform field reconnaissance, studies, site investigations, and a preliminary design meeting with the users, including travel and work required to obtain engineering information and design data to produce contract documents for this project. The Base Civil Engineering Project Manager will assist in scheduling design meetings.
Building 658 is a 3800 sq ft hydrant fueling facility for jet fuel and includes significant fuels piping fed from the nearby outdoor storage tanks. Most of the space in the facility is a fuels piping bay. There is also a small control room and bathroom in the facility. The heating in building 658 is inadequate to maintain heat in the fuel bay. The bay is currently heated by 4 hydronic unit heaters, supported by a 400 MBH boiler which also supplies heat to the rest of the facility. The fuels piping bay eye wash station does not have sufficient accessible hot water. Current domestic hot water is supplied by a small on demand electric hot water heater, which appears to be inadequate. The fuel coming from these outdoor storage tanks cools the space when operations commence during winter months, providing additional heat load. The small control room and bathroom are not included as part of this project, though the heat load from the air handler and bathroom in this area will have to be considered for boiler sizing. Historical drawings for this facility have been lost. Site investigation and measurements will be critical to the success of this project.
More opportunities from Department Of Defense → DEPT OF THE AIR FORCE
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS