JMRL CENTRAL LIBRARY A&E SERVICES
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Charlottesville Public Works Capital Development Department is seeking qualified architectural and engineering (A&E) firms to provide comprehensive design, planning, and construction administration services for the renovation of the Jefferson Madison Regional Library (JMRL) Central Library located at 201 E Market St, Charlottesville, VA. The project focuses on modernizing the 18,000 square foot historic facility, with a primary emphasis on Mechanical, Electrical, and Plumbing (MEP) upgrades, including the replacement of boilers, pumps, and an air handler, and addressing a frequently overflowing waste line. The goal is to increase functionality by creating flexible spaces such as quiet reading rooms, small meeting areas, and a dedicated teen area, while maintaining the building's historic fabric and achieving LEED certification and compliance with the City's High Performance Building Standards. The project is structured into four design phases, beginning with consultation and investigation and concluding with design for construction. The tentative timeline spans from January 2027 through December 2029, with the library remaining completely unoccupied during the renovation process. Proposals are due by December 11, 2026, and will be evaluated based on the qualifications of the staff, the strength of the overall proposal, and the firm's approach to the City's objectives. There is no set-aside status for this solicitation.
General Info
Place of Performance
Set-Aside
Documents
10Read all 10 documents
Due in 18 daysEvery page of every file, in your free workspace.
Read the documentsAI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 10 solicitation documentsRead every page
- AI contract breakdown13 sections, Uniform Contract Format
- Buyer contactEmail and phone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
The notice description changed.
The notice description changed.
The notice description changed.
Submission deadline
Response Deadline
Organization & Contact Information
Interested Companies (58)
See All 58 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Addendum #1: The Pre-Bid Walk through date has been changed to Tuesday, October 27th at 2:00 pm . Located at the JMRL Library downtown in the Swanson Room on the second floor.
Official Notice #1: Pre-Proposal Conference : Please see Addendum #3 for questions and answers addressed in the pre-proposal meeting.
Addendum #2: Upload of Pre Bid walk through sign-in sheet. Attachments: JMRL_-_PreBid_Sign-In_Sheet_Final_-_RFP_-_20261027.pdf
Addendum #3: This addendum is being issued in response to the following questions addressed during the pre-proposal meeting. Will there be exterior components addressed during this renovation? No, there will be no exterior work or improvements addressed in this renovation. Will the building need to remain partially occupied during renovation? No, all occupants and operations will be moved completely out during the renovation. What sustainability benchmarks and requirements will need to be met? Aside from LEED certifications as mentioned within the RFP, the City's High Performance Building Standards must be met. The High Performance Building Standards are available online via the City's website. What design elements will the City be prioritizing? The City's primary goal is to modernize and increase the functionality of the space. Examples of this include— creating small meeting spaces, quiet reading rooms, and a separate teen area; improving sightlines; and prioritizing the flexibility of different spaces while not losing substantial amounts of collection space. Is the City intending to institute an automated book retrieval system? No, the City does not plan to implement this system. Will community engagement be part of the design process? The City welcomes engagement of stakeholders including community members, library volunteers, and library staff. Seeking engagement and synthesizing suggestions would be part of the expectation of the selected architect. Are there areas of significant importance that should have limited disturbance? Only the Swanson Room. Are there any special collections with preservation requirements to consider? No, the Central Library does not house any special collections. Are there any mold concerns? Though there have been some flooding/water retention issues over the years, there are no known mold concerns. What mechanical/electrical/plumbing needs are there to consider? The main concern is the waste line, which frequently backs up and overflows. Additionally, one air handler and two boilers/pumps will need to be replaced. The addition of a larger generator and the return to two working elevators are preferred.
Similar Contracts
Same NAICS industry code
More opportunities from Virginia → Public Works - Capital Development
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
